4
Overview of Presentation
• Putting Asset Management on the VC’s Radar!
• The Newcastle University Journey
• Strategic Asset Management
• Overview
• Framework (SAMF)
• Plan (SAMP)
• Lessons Learnt
What about your University?
• Do you understand the risk profile associated with
your asset portfolio?
• Do you need more GFA or less?
• Have you measured capacity / utilisation?
• Have you assessed functionality backlog?
• Are you investing heavily in old stock?
• Have you assigned an Asset Strategy to every
building to target investment
• Does your Executive understand asset mang’t
• Are investment decisions based on a “list of projects”
• Have you ever knocked a building down?
• Do you have the budget to maintain your assets?
UoN Situation in 2011
• No SAMP
• No formal Framework
• EOI process to identify needs
• Capital Development Committee
• No space system
• No future Demand Forecast
• Condition Audit
• Inadequate Budgets
• Disconnect between Executive / Faculty and IFS
• Excellent Environmental Performance – sector wide
What is Strategic Asset Management?
PAS 55: Systematic and coordinated activities and practices
through which an organisation optimally and sustainably
manages its assets and asset systems, their associated
performance, risks and expenditures over their lifecycle for
the purposes of achieving its organisational strategic plan.
Draft ISO 5500: the coordinated activities of an organization to
realize value from assets.
TEFMA SAM Guideline:
The planned alignment of physical assets with business need.
SAM in the Tertiary Education Sector
Tasks and
Functions
Processes and
Competencies
Resource
Management
Property Information
Repairs and Maintenance
Site Selection & Acquisition
Construction & Handover
Refurbishment and Refit
Estate Management
Asset management
Facilities Management
Property Portfolio Management
Strategic Facilities Planning
Long-term Asset Management
Support Services Management
Optimizing the use of resources
Tactical Concerns Strategic Concerns
10
The Need for Change
The NSW Auditor General’s Report stated:
I reviewed a sample of annual reports and found
universities only disclose limited information on
outcomes achieved from their asset management
practices. I believe universities should report how
effectively they are managing the $8.6 billion worth of
infrastructure assets they control.
Characteristics of the University Estates
• There is a growing maintenance backlog at most Universities.
• The backlog is generally driven by over-investment in new facilities (estates
are growing) and under- investment in the existing estate (operating budgets
are not).
Expenditure Category
Ave Exp %
ARV
Required
Exp % ARV
Budget Gap
%ARV
Maintenance 0.69% 0.88% 0.19%
Asset Replacement 0.18% 1.32% 1.14%
Refurbishment 1.08% 2.12% 1.04%
Total 1.95% 4.32% 2.37%
Xact’s Principles of Asset Management
• Space is everything
• Asset Management needs to move from the Plant
Room to the Board Room
• The full asset life cycle needs to be considered:
• Asset decisions must be informed decisions, based
on measured performance
Benefits of SAM
“The prize for getting it right is certainly very big and
touches almost all parts of an organisation. The
available case studies and increasing hard evidence
demonstrate a mix of:
• higher performance levels
• lower costs
• greater consistency
• increased confidence and credibility
• happier customers, staff and regulators
• more sustainable outcomes
22
UoN PAS 55 Performance Score
SAMF Category UoN
Score
Mean
PAS55 Min Accreditation Level
Governance 1.3 3 Asset Management Plans 1.9 3
Enablers & Controls 1.6 3
Asset Implementation
Plans
1.2 3
Performance Assessment 1.9 3 Management Review 0.8 3
Process
– Researched SAMP nationally and internationally
– Established a Working Group
– Engaged Xact Consulting
– Assessed the Estate Performance
– Established AM Gateway process –adopted by
Council
– Conducted Consultation
– Presented our results to Executive and Council
26
Reference Material
TEFMA – Strategic Asset Management Guideline 2010
IAM - Asset Management – An Anatomy 2012
IIMM – Intern’l Infrastructure Management Manual 2011
Managing the University Campus – Alexandra den Heijer
BSI – PASS 55 – Asset Management – Specification for the
Optimised Management of Physical Assets 2008
ANOA – Best Practice Guide on the Strategic & Operational
Management of Assets by Public Sector Entities 2010
27
SAMPs - research
• No SAMPs found follow TEFMA guideline
• Very few include performance data
• Big emphasis on Capital Works
• No evidence based management information
• Described the campus but not performance of assets
• Unable to find Asset Management Policy
• Static or historical information
• Only some included plans /future targets
• Outlines expenditure but not LCC budget
requirements / backlog, strategies for assets
28
SAMP Working Group
ABSOLUTELY CRITICAL TO SUCCESS
• Director - Chair
• Finance – Capital and Opex staff
• Audit and Risk
• FM
– Ops, Maint Planner, Engineers
– Capital – PM’s
– Space
– Enviro
29
16 Asset Classes
Buildings
Roads, Bridges, Retaining Walls, Kerbs and Gutters
Footpaths and Cycling Paths
Stormwater Assets
Open Spaces
High Voltage/Low Voltage Electrical
Landscape
Waste Water
Gas
Water Supply
Fire Services
Car Parks
Bushland
Communications & IT
1. Street Lighting
32
Capacity 35
0
10,000
20,000
30,000
40,000
50,000
60,000
Office Research Laboratory General Teaching Specialist Teaching Library
Gro
ss F
loo
r A
rea
Core Space Type
Estate Space Requirements
Required Space
Actual Space
36 Utilisation
• Assessed timetabled teaching space, residential and library
• No data for research, general teaching, specialist teaching,
commercial and residential use
•Assessment of labs is critical as it is the most expensive
space to operate and takes longer to deliver
•The current low levels of utilisation across all teaching
space suggest that there is sufficient teaching space to meet
current needs and some capacity to meet future growth
Environmental Sustainability
SAMP recommends that Institutions measure
performance and develop integrated strategies for
• Energy
• Greenhouse gas emissions
• Water consumption
• Waste management
• Landuse and ecology
42
Broad Maintenance Strategies
0.00%
0.50%
1.00%
1.50%
2.00%
2.50%
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 Average
% A
sset
Rep
lacem
en
t V
alu
e
Year
UoN Maintenance Expenditure
UoN MI (% ARV) UoN ARI (% ARV) Sector Avg MI
Sector Avg ARI UoN Target MI MI +ARI Target
Maintenance + Asset Replacement Target
Maintenance
Reduce the target using
differential levels of
service for various asset
groups.
Increase budget
allocations
Asset Priority Index
• Strategic Alignment
• Dependency
– Intradependency – Can the required functions be
delivered out of alternative facilities on campus or
through temporary facilities?
– Interdependency – Can the activity be delivered in
another way?
• Consequence
Building Code
Building Name Campus Strat.
Align.
Intra Depend.
Inter Depend.
Conseq. API
NEWL NEWBOLDS LABORATORY [CITY] CITY 1.0 1.0 1.0 1.0 1.0
CON CONSERVATORIUM OF MUSIC [CITY] CITY 4.0 3.0 3.0 4.0 3.6
NH NORTHUMBERLAND HOUSE [CITY] CITY 3.0 2.0 2.0 2.0 2.4
UNH UNIVERSITY HOUSE CITY 4.0 3.0 3.0 4.0 3.6
A ARCHITECTURE CALLAGHAN 3.0 3.0 3.0 2.0 2.8
Overall Needs Rating – Refurbishment Priorities
Building Code Building Name Campus OFR OCR
Overall Needs Index (ONR)
API Risk Rating
Risk Level
BHPP BHP NIER P BLOCK Callaghan 2.0 2.5 2.2 5.0 13.8 High
MC MCMULLIN BUILDING Callaghan 2.4 2.6 2.5 5.0 12.5 High
H HUNTER BUILDING Callaghan 2.3 3.0 2.6 5.0 11.9 Medium
EHA EDWARDS HALL BLOCK A Callaghan 2.2 2.6 2.4 4.0 10.4 Medium
MS MEDICAL SCIENCES Callaghan 2.7 2.8 2.8 4.6 10.3 Medium
P PHYSICS BUILDING Callaghan 2.4 2.7 2.5 4.0 9.8 Medium
CON CONSERVATORIUM OF MUSIC [CITY] City 2.1 2.5 2.3 3.6 9.7 Medium
W BEHAVIOURAL SCIENCES Callaghan 2.4 2.8 2.6 3.8 9.1 Medium
EE ENGINEERING E - ELECTRICAL Callaghan 2.2 2.3 2.3 3.0 8.2 Medium
EHB EDWARDS HALL BLOCK B Callaghan 2.0 2.6 2.3 3.0 8.1 Medium
EHC EDWARDS HALL BLOCK C Callaghan 2.0 2.6 2.3 3.0 8.0 Medium
Needs Index
Build Code
Building Name Campus Asset Replace. Value (ARV)
Mainten. Backlog
Function. Backlog
Total Backlog
Facilit.s Needs Index (FNI)
BHPP BHP NIER P BLOCK Callaghan $535,040 $425,021 $355,340 $780,361 -0.46
MC MCMULLIN BUILDING Callaghan $17,027,539 $4,133,483 $10,336,864 $14,470,347 0.15
H HUNTER BUILDING Callaghan $58,536,042 $4,662,650 $40,101,069 $44,763,719 0.24
EHA EDWARDS HALL BLOCK A Callaghan $4,625,992 $1,015,917 $2,671,131 $3,687,049 0.20
MS MEDICAL SCIENCES Callaghan $20,208,894 $4,873,695 $5,308,413 $10,182,108 0.50
P PHYSICS BUILDING Callaghan $7,219,858 $1,496,649 $3,857,841 $5,354,490 0.26
CON CONSERVATORIUM OF MUSIC [CITY]
City $16,156,540 $3,878,623 $6,323,879 $10,202,502 0.37
W BEHAVIOURAL SCIENCES Callaghan $11,747,570 $2,561,512 $6,855,140 $9,416,651 0.20
EE ENGINEERING E - ELECTRICAL Callaghan $5,193,349 $1,655,876 $3,514,404 $5,170,280 0.00
EHB EDWARDS HALL BLOCK B Callaghan $6,985,631 $991,601 $5,392,374 $6,383,975 0.09
EHC EDWARDS HALL BLOCK C Callaghan $7,140,985 $996,709 $5,400,119 $6,396,828 0.10
1: Limit Growth in GFA, improve efficiency
2: Disposal of Surplus Assets
3: Redevelopment/Refurbishment
4: Differential Maintenance Response Levels
5: Environmental Management
ASSET STRATEGIES SAMP 1
STRATEGY 4: DIFFERENTIAL MAINTENANCE
RESPONSE LEVELS
Maintenance Response
1. Critical
2. Comprehensive
3. Managed
4. Reactive
STRATEGY 5: ENVIRONMENTAL MANAGEMENT
Greenhouse gas emissions target (20% by
2015)
KPI in New Directions
Recommendations
• Achieve a certified 5 star Green Star rating on
new facilities
• Enhance energy efficiency during
refurbishments
• Green power
• Solar arrays
• Water saving devices in new and refurbished
Strategy Development Checklist
• Institutional Priorities
• API
• Condition
• Functionality
• Capacity
• Utilisation
• Environmental Performance
• SAMP Maintenance Strategy
• ARV, Backlog, FNI
• Risk
Asset Management Gateway
Current Stage Complete Complete
1. Idea 2. Consultation
3. NeW Directions Alignment
(GATE 0)
4. EC Review
(GATE 1)
5. Advisory Group Review
& Prioritise
6. SAMC Review & Prioritise
7. Strategy Development
8. Strategy Review
9. Strategy Prioritisation and Approval
(GATE 2)
10. Business Case Initiation
11. Council Review of
Business Cases
(GATE 3)
12. Project Initiation
13. Project Development
14. Pre - Implementation
(GATE 4)
15. Implementation
16. Transition and Closing
(GATE 5)
Asset Implementation Plans
Content, Template, 3 (or 5) & 10 Year Horizons
– Capital Investment Plan
– Maintenance Plan
– Space Management Plan
– Surplus Asset Plan
University Council
Finance Committee
Strategic Development
Committee
Executive Committee
Strategic Asset Management Committee
Research & Innovation Advisory
Group
Campus
Environment Advisory
Group
Education Advisory
Group
Project
Steering Committees
Communities of Practice
Project Control
Groups
Project Sponsors
Infrastructure and Facilities Services
Asset Strategic Planning
Capital Development
& Project Delivery
Facilities Operations & Maintenance
Strategic Asset Management Governance Framework
68
Strategic Asset Management Committee
•Vice-Chancellor and President (Chair) ;
•Chief Operating Officer (Deputy Chair) ;
•Chairs of the Asset Management Advisory Groups ;
•Chief Financial Officer ;
•Director, Infrastructure & Facilities Services ;
•Deputy Vice-Chancellor (Academic);
•Deputy Vice-Chancellor (Research); and
•a Pro Vice-Chancellor appointed by the Vice-Chancellor;
71
Lessons Learnt
• Engage with the VC early using evidence-based
management information
• Engage experts in asset management
• Use an integrated approach
• Seek resources early (budget and staff)
• Establish a multi-disciplinary team
• Take everyone on the journey (as influencers)
• Build capacity immediately
• Audit your ability to undertake Performance
Assessment (systems, data, staff)
• Get your Executive to approve methodology of
assessment (capacity)
TEFMA Guideline
• Recommend a review of the guideline
• Further development of the Strategy Component
• Network of Asset Managers
• Improvement in risk component
• More detail on the AIP’s their content, role, structure
• Information on how to assess service dependency
and location performance assessments
72
Keys to Success
• The PAS55 SAMF
– Provides credibility to the process
– VC’s comment – best thing to come out of facilities for years.
• The “Huston we have a problem” moment.
– Need a comprehensive estate performance assessment. (The SAMC MUST
understand the problem.)
– Inherently some parts are accepted, other are not.
– Need action plan for making the “questioned” performance ratings more
transparent and robust.
• Focus on some key concepts
– SAM maturity will increase top down & reduce bottom up
– Space is everything (don’t build it unless you are sure you need it)
– Owning an estate is expensive (LCOC 2.5 x capital cost)
– Avoid the maintenance death spiral
– Underinvestment in maintenance & refurbishment is driving a decrease in estate
quality
• Drive the SAMC (as opposed to waiting and reacting)