UNIVERSITY AVENUEPreliminary Design

PUBLIC MEETINGMarch 3, 2020

CN LC00290

Page 2: UNIVERSITY AVENUE Preliminary Design · The University Avenue Phase A Corridor Study was completed in 2016 The Phase B Corridor Study was completed and approved in Fall 2019 Draft

AGENDA

▸ Purpose and Need

▸ Project Background

▸ Preliminary Design

▸ Next Steps

2

Page 3: UNIVERSITY AVENUE Preliminary Design · The University Avenue Phase A Corridor Study was completed in 2016 The Phase B Corridor Study was completed and approved in Fall 2019 Draft

3

Page 4: UNIVERSITY AVENUE Preliminary Design · The University Avenue Phase A Corridor Study was completed in 2016 The Phase B Corridor Study was completed and approved in Fall 2019 Draft

PURPOSEProvide an enhanced multi-modal transportation corridor

NEED▸ Safety concerns due to potential

pedestrian/bicycle/vehicular conflicts▸ Physical deficiencies due to lack of shoulders, pedestrian

facilities, and bicycle facilities▸ Potential for economic development opportunities as a

result of improving connectivity4

PURPOSE AND NEED

Page 5: UNIVERSITY AVENUE Preliminary Design · The University Avenue Phase A Corridor Study was completed in 2016 The Phase B Corridor Study was completed and approved in Fall 2019 Draft

PROJECT BACKGROUND

▸ The University Avenue Phase A Corridor Study was completed in 2016

▸ The Phase B Corridor Study was completed and approved in Fall 2019

▸ Draft Phase C Environmental Analysis is completed & awaiting NMDOT approval

▸ Phase D Preliminary Design was completed in January 2020

▸ Initiating Final Design5

Page 6: UNIVERSITY AVENUE Preliminary Design · The University Avenue Phase A Corridor Study was completed in 2016 The Phase B Corridor Study was completed and approved in Fall 2019 Draft

PREVIOUS PUBLIC INVOLVEMENT

▸ Phase A – Initial Evaluation of Alternatives▹ June 2015▹ October 2015

▸ Phase B – Detailed Evaluation of Alternatives▹ June 2019▹ September 2019

6

Page 7: UNIVERSITY AVENUE Preliminary Design · The University Avenue Phase A Corridor Study was completed in 2016 The Phase B Corridor Study was completed and approved in Fall 2019 Draft

RECOMMENDATIONS FOR DESIGN

▸ Roadway▹ Segment 1 – 11’ driving lanes, 5’ bicycle

lanes, 5’ sidewalk (north), 8’ multi-use path (south)

▹ Segment 2 – 12’ driving lanes, 5’ bicycle lanes, 6’ sidewalk/ 2’ buffer (north), 10’ multi-use path/ 5’ buffer (south)

▸ Drainage▹ Ponding at existing topographic low points

7

Page 8: UNIVERSITY AVENUE Preliminary Design · The University Avenue Phase A Corridor Study was completed in 2016 The Phase B Corridor Study was completed and approved in Fall 2019 Draft

8

Page 9: UNIVERSITY AVENUE Preliminary Design · The University Avenue Phase A Corridor Study was completed in 2016 The Phase B Corridor Study was completed and approved in Fall 2019 Draft

9

Page 10: UNIVERSITY AVENUE Preliminary Design · The University Avenue Phase A Corridor Study was completed in 2016 The Phase B Corridor Study was completed and approved in Fall 2019 Draft

10

Page 11: UNIVERSITY AVENUE Preliminary Design · The University Avenue Phase A Corridor Study was completed in 2016 The Phase B Corridor Study was completed and approved in Fall 2019 Draft

PRELIMINARY DESIGN

▸ Roadway▸ Drainage▸ Rail Crossing

11

Page 12: UNIVERSITY AVENUE Preliminary Design · The University Avenue Phase A Corridor Study was completed in 2016 The Phase B Corridor Study was completed and approved in Fall 2019 Draft

ROADWAY CONSIDERATIONS

▸ Left-turn lane in front of school▸ Location of Crosswalks▸ Bus stops and shelters▸ EBID College Lateral▸ Aesthetics

▹ Integration of existing pavers▹ Lighting at intersections▹ Possible Water Harvesting

12

Page 13: UNIVERSITY AVENUE Preliminary Design · The University Avenue Phase A Corridor Study was completed in 2016 The Phase B Corridor Study was completed and approved in Fall 2019 Draft

TURN LANE AND CROSSWALKS

13

Page 14: UNIVERSITY AVENUE Preliminary Design · The University Avenue Phase A Corridor Study was completed in 2016 The Phase B Corridor Study was completed and approved in Fall 2019 Draft

14

Page 15: UNIVERSITY AVENUE Preliminary Design · The University Avenue Phase A Corridor Study was completed in 2016 The Phase B Corridor Study was completed and approved in Fall 2019 Draft

BUS STOP

15

Page 16: UNIVERSITY AVENUE Preliminary Design · The University Avenue Phase A Corridor Study was completed in 2016 The Phase B Corridor Study was completed and approved in Fall 2019 Draft

BUS STOP DETAIL

16

Page 17: UNIVERSITY AVENUE Preliminary Design · The University Avenue Phase A Corridor Study was completed in 2016 The Phase B Corridor Study was completed and approved in Fall 2019 Draft

17

Page 18: UNIVERSITY AVENUE Preliminary Design · The University Avenue Phase A Corridor Study was completed in 2016 The Phase B Corridor Study was completed and approved in Fall 2019 Draft

18

Page 19: UNIVERSITY AVENUE Preliminary Design · The University Avenue Phase A Corridor Study was completed in 2016 The Phase B Corridor Study was completed and approved in Fall 2019 Draft

PONDING LOCATIONS

19

Page 20: UNIVERSITY AVENUE Preliminary Design · The University Avenue Phase A Corridor Study was completed in 2016 The Phase B Corridor Study was completed and approved in Fall 2019 Draft

RAIL CROSSING CONSIDERATIONS

▸ Ability to safely cross railroad tracks at multi-use path and sidewalk

20

Page 21: UNIVERSITY AVENUE Preliminary Design · The University Avenue Phase A Corridor Study was completed in 2016 The Phase B Corridor Study was completed and approved in Fall 2019 Draft

21

Page 22: UNIVERSITY AVENUE Preliminary Design · The University Avenue Phase A Corridor Study was completed in 2016 The Phase B Corridor Study was completed and approved in Fall 2019 Draft

NEXT STEPS

▸ Final Design - Begin this Spring▸ Construction - Scheduled for 2022/2023

22

Page 23: UNIVERSITY AVENUE Preliminary Design · The University Avenue Phase A Corridor Study was completed in 2016 The Phase B Corridor Study was completed and approved in Fall 2019 Draft

QUESTIONS & COMMENTS

Alvin Dominguez, PE (BHI)[email protected]

Mark Salazar, PE (NMDOT)[email protected]