united nations development programme country: botswana ... and... · the department of...
TRANSCRIPT
United Nations Development Programme Country: BOTSWANA
PROJECT DOCUMENT
Project Title: National Biodiversity Planning to Support the implementation of the CBD 2011-
2020 Strategic Plan in Botswana
UNDAF Outcome(s): A diversified economy whose growth is rapid, inclusive, sustainable and generates decent
employment opportunities by 2016. UNDP Strategic Plan Environment and Sustainable Development Primary Outcome: Strengthen national capacity to manage
the environment in a sustainable manner while ensuring adequate protection of the poor. Mobilizing environmental financing.
UNDP Strategic Plan Secondary Outcome: Mainstreaming environment and energy.
Expected CP Outcome(s): 1.1 Enhanced national and district capacity to support inclusive community-driven Development.
2.2 Technical and institutional capacity to develop, implement and monitor inclusive development polices and strategies is
strengthened in key ministries
2.3 The institutional and regulatory environment for inclusive trade and private sector development is strengthened.
Expected CPAP Output (s):
1.1.1 Evidence based responsive policies, legislation, programmes and projects formulated by government to accelerate progress
towards Vision 2016 goals,
NDP10 goals, MDGs and Millennium Declaration.
National Executing Entity
The Department of Environmental Affairs (DEA) under the Ministry of Environment, Wildlife and Tourism (MEWT).
Brief Description: This project is part of the second generation of Biodiversity Enabling Activities (BD EA) under the GEF. Botswana has been Party to
the Convention on Biological Diversity (CBD) since 1995. The project addresses the country’s need to continue to fulfill its obligations under the CBD,
with particular focus on the Convention’s Article 6 and the CBD COP Decision X/2. Above all, the project is a significant contribution to Botswana’s
efforts towards implementing the CBD Strategic Plan 2011-2020 at the national level. The project builds on the current status and achievements of
Botswana with respect to biodiversity planning and reporting. It aims to integrate Botswana’s obligations under the CBD into its national development and
sectoral planning frameworks through a renewed and participative ‘biodiversity planning’ and strategizing process. This process is expected to produce
measurable targets for biodiversity conservation and sustainable use. It will equally ensure that the value of ecosystems’ goods and services, as well as the
challenges and opportunities for ecosystem-based adaptation and resilience are taken into consideration in the process. The project will achieve its
objective through the implementation of three components, whose activities are thoroughly described in the GEF approved proposal for BD EA. They are:
(1) A participative stocktaking exercise on biodiversity planning takes place and national biodiversity targets are developed in response to the global Aichi
Targets; (2) The NBSAP is revised/updated and it fully integrates new aspects of the CBD strategic plan, such as mainstreaming and anchoring the
implementation of the plan into national development frameworks, valuing ecosystem services and promoting ecosystem-based adaptation and resilience;
and (3) National frameworks for resource mobilization, Convention reporting and exchange mechanisms are strengthened.
Programme Period: 2010-2016
Award Title: PIMS 4844 GEF5 BD
EA Botswana
Atlas Award ID: 00062664
Project ID: 00080153
PIMS #: 4844
Start date: March 2012
End Date: August 2015
Management
Arrangements: NEX
PAC Meeting Date: 25 Jan 2012
[A + B] Total resources required (total project funds) $757,008
[A] Total allocated resources
(UNDP managed funds under this award) $637,008
Regular (UNDP TRAC) $165,000
GEF $207,000
Government cost-sharing $265,008
[B] Other (partner managed resources)
- Government (in-kind) $120,000
- NGOs and others (not monetised) -
Agreed by (Government):
Date
Agreed by (Executing Entity):
Date
Agreed by (UNDP):
Date
PRODOC. v.220212 4844 GEF5 BD EA Botswana 2
Table of Contents
Overview of Approved Proposal........................................................................................................................ 3
SECTION I: Elaboration of the Narrative ....................................................................................................... 5 PART I: Situation Analysis ........................................................................................................................... 5
Point of Departure ................................................................................................................................ 5 Stakeholder Analysis and Engagement ................................................................................................ 5
PART II: Strategy .......................................................................................................................................... 7 Project Goal, Objective, Outcomes and Outputs/activities .................................................................. 7 Project Risks ......................................................................................................................................... 8
PART III: Management Arrangements ....................................................................................................... 8 PART IV: Monitoring and Evaluation Plan and Budget ......................................................................... 11
Monitoring and reporting ................................................................................................................... 11 PART V: Legal Context ............................................................................................................................... 13
SECTION II: STRATEGIC RESULTS FRAMEWORK (SRF) AND GEF INCREMENT ..................... 14 PART I: Strategic Results Framework, SRF (formerly GEF Logical Framework) Analysis ............... 14
Indicator framework as part of the SRF ............................................................................................. 14
SECTION III: Total Budget and Workplan .................................................................................................. 18
SECTION IV: ADDITIONAL INFORMATION .......................................................................................... 21 PART I: Other agreements ......................................................................................................................... 21
Co-financing Letters ........................................................................................................................... 21 PART II: Terms of References for key project staff ................................................................................. 21
National Project Coordinator ............................................................................................................. 22 Project Assistant ................................................................................................................................. 23 Project Consultants ............................................................................................................................. 24
Project Annexes................................................................................................................................................. 25 Annex 1. Approved GEF proposal for BD EA (Headings Overview on page 3) ..................................... 25 Annex 2. GEF CEO Approval Letter ......................................................................................................... 46 Annex 3. Minutes of the Local Project Appraisal Committee (LPAC) Meeting .................................... 47 Signature Page .................................................................................................. Error! Bookmark not defined.
PRODOC. v.220212 4844 GEF5 BD EA Botswana 3
Overview of Approved Proposal
EA Proposal: Headings Overview
PART I: PROJECT IDENTIFIERS A. EA FRAMEWORK
B. CO-FINANCING FOR THE EA BY SOURCE AND BY NAME
C. GRANT RESOURCES REQUESTED BY AGENCY, FOCAL AREA AND COUNTRY
D. EA MANAGEMENT COST
PART II: ENABLING ACTIVITY JUSTIFICATION
A. ENABLING ACTIVITY BACKGROUND AND CONTEXT
B. ENABLING ACTIVITY GOALS AND OBJECTIVES
C. DESCRIBE THE EA AND INSTITUTIONAL FRAMEWORK FOR PROJECT IMPLEMENTATION
D. DESCRIBE, IF POSSIBLE, THE EXPECTED COST-EFFECTIVENESS OF THE PROJECT
E. DESCRIBE THE BUDGETED M&E PLAN
F. EXPLAIN THE DEVIATIONS FROM TYPICAL COST RANGES (WHERE APPLICABLE):
PART III: APPROVAL/ENDORSEMENT BY GEF OPERATIONAL FOCAL POINT(S) AND GEF AGENCY(IES)
A. RECORD OF ENDORSEMENT OF GEF OPERATIONAL FOCAL POINT(S) ON BEHALF OF THE GOVERNMENT(S):
B. CONVENTION PARTICIPATION
C. GEF AGENCY(IES) CERTIFICATION
Annex A: CONSULTANTS TO BE HIRED FOR THE ENABLING ACTIVITY
-- Refer to Annex 1 for the approved proposal --
PRODOC. v.220212 4844 GEF5 BD EA Botswana 4
Acronyms
APR/PIR Annual Project Review / Project Implementation Report
BD EA Biodiversity Enabling Activities
CBD Convention on Biological Diversity
CDR Combined Delivery Report
CHM Clearing House Mechanism
CO Country Office (UNDP)
COP Conference of the Parties
CPAP Country Programme Action Plan
DOE Department of Environment
DEA Department of Environmental Affairs
GEF Global Environment Facility
MCST Ministry of Communications, Science and Technology
MEWT Ministry of Environment, Wildlife and Tourism
MFDP Ministry of Finance and Development Planning
NBDA National Biodiversity Authority
NBSAP National Biodiversity Strategy and Action Plan
NIM National Implementation Modality (UNDP’s)
NPC National Project Coordinator
NPD National Project Director
QOR Quarterly Operational Reports
TBW Total Budget and Work plan
TEEB The Economics of Ecosystems and Biodiversity
UNDP United Nations Development Programme
UNEP United Nations Environment Programme
PRODOC. v.220212 4844 GEF5 BD EA Botswana 5
SECTION I: Elaboration of the Narrative
PART I: Situation Analysis
POINT OF DEPARTURE
1. This Project Document (PRODOC) serves to operationalise at the level of UNDP and
government, the proposal for Biodiversity Enabling Activities approved by the GEF on
[November 3rd
2011]. This proposal is appended to the PRODOC in Annex 1 and the GEF CEO
Letter of Approval is in Annex 2.
2. The project builds on the current status and achievements of Botswana with respect to its
obligations vis-à-vis the Convention on Biological Diversity (CBD), in particular the country’s
biodiversity planning and Convention reporting processes, and its commitment to implement, at
the national level, the CBD’s Strategic Plan for the period 2011-2020. These processes and
achievements are summarised in a matrix in Annex 1, under the heading ‘Enabling Activity
Background and Context’.
3. In particular, the NBSAP for Botswana was completed in 2007.1 This version of the
NBSAP does not include a number of elements of the CBD Strategic Plan’s Aichi Targets and
newer COP guidance. The new CBD Strategic Plan, adopted at CoP-10 in 2010 in Nagoya,
clearly addresses the need for updating NBSAPs, stating in Target 17 that “By 2015, each Party
has developed, adopted as a policy instrument, and has commenced implementing an effective,
participatory and updated national biodiversity strategy and action plan.” The strategic plan also
covers a range of issues that will need to be incorporated into the revised NBSAPs, including
guidance to countries to: a) fully realise the value of biodiversity and ecosystem services, and
incorporate these values into national and local development and poverty reduction strategies
(Targets 1 and 2); b) increase the global terrestrial protected area estate from 12% to 17% and
the marine estate from 6% to 10% (Target 11); c) restore and safeguard key ecosystem services,
especially for water, health and livelihoods (Target 14); and d) strengthen ecosystem resilience to
climate change and promote ecosystem-based approaches to climate change adaptation and
mitigation (Target 15).
4. The achievements and shortcomings of previsous biodiversity planning processes in
Botswana are described in the GEF proposal (Annex 1), under heading ‘The Baseline Project:
The Current NBSAP and the new CBD Strategic Plan’.
5. Together, all of the above elements constitute the ‘Point of Departure’ and general
context for the current Biodiversity Enabling Activities project of Botswana.
STAKEHOLDER ANALYSIS AND ENGAGEMENT
1 See www.cbd.int/reports/search
PRODOC. v.220212 4844 GEF5 BD EA Botswana 6
6. There is an extensive body of guidance explaining how those responsible for biodiversity
planning can approach the task of identifying stakeholders. In its guidance to Parties on the
organization of NBSAPs and preparation of national reports, the COP has repeatedly stressed
that, if the necessary transition from biodiversity planning to biodiversity implementation is to be
made, then everyone with a stake in the outcome of the NBSAP needs to be engaged.
7. The stakeholder engagement process in Botswana will start with the CBD national focal
points, the NBSAP responsible authority - The Department of Environmental Affairs (DEA)
under the Ministry of Environment, Wildlife and Tourism (MEWT); and thereafter it will expand
to include a much broader range of national actors. Developing and implementing Botswana’s
NBSAP will be a widely inclusive and participative process.
8. A national steering committee and one or more working groups will be proposed for
accompanying the process of developing national targets, updating the NBSAP and preparing the
national reports. The steering committee will include representatives of all sectors. Below is an
overview of the potential role of different stakeholders and the rationale for their involvement in
the project.
Table 1. Stakeholder Matrix
Sector Agency/department Potential role in the project and rationale
for involvement
Biodiversity
conservation
Ministry of Environment, Wildlife and Tourism
Executing agency of the project and
responsible for development of policy and
legislation
Sustainable
agriculture
District Land Use Planning Unit
Ministry of Agriculture
Steering committee member
Academia University of Botswana
Botswana College of Agriculture
Okavango Research Institute
Tertiary and research institutions with
extensive local scientific, technical and
research capacity
Private Sector CARACAL
Game lodges, Trophy hunting and Safari
companies
HATAB
Potential to contribute further close the
biodiversity “funding gap”
Tourism Department of Wildlife and National Parks
Department of Tourism
Botswana Tourism Organisation
Tourism in Botswana is by and large based on
Biodiversity. Their involvement is key.
Non-governmental
Organizations
Birdlife Botswana
Kalahari Conservation Society
Botswana Council of Non-Governmental
Network
Experience in implementing biodiversity
conservation and sustainable development
work on the ground, as well as an
understanding of the needs of local
communities whose livelihoods are directly
dependent on biodiversity, and who are
vulnerable in specific ways to climate change
National Finance
and Budgeting
Ministry of Finance and Development Planning
Key decisions that affect biodiversity are made
in this Ministry. Their involvement is therefore
very important.
Women’s
organizations
Ditshwanelo-Human Rights
Gender is one of the development topics that
were selected for mainstreaming under
component 2, activity “Mainstreaming
biodiversity into development policies, plans
PRODOC. v.220212 4844 GEF5 BD EA Botswana 7
Sector Agency/department Potential role in the project and rationale
for involvement
and practices and into sectoral plans and
strategies”. The involvement of women’s
groups is therefore important. Refer also to
explanations on gender marking in Annex 1,
Part II, section C.
Energy Department of Energy Affairs
Steering committee members
Indigenous and
local community
organizations
Botswana Community Based Organisation
Network
21 Community Trusts in Okavango region
Community Trusts in Chobe-Linyanti
region, e.g. the Chobe Enclave
Conservation Trust-CECT,Kazungula
Lesoma Pandamatenga Community Trust-
KALIPA
Ngamiland District CBNRM Forum
CBNRM Forum and support programme
These could possibly be involved in the project
as steering committee members (for decision
by the Local Project Appraisal Committee).
Involvement of indigenous and local
community organizations Is very important for
the success of BD EA projects.
PART II: Strategy
PROJECT GOAL, OBJECTIVE, OUTCOMES AND OUTPUTS/ACTIVITIES
9. The project’s goal is to enable Botswana to integrate its CBD obligations into national
planning processes, in light of the CBD’s Strategic Plan 2011-2020.
10. The project objective is to integrate Botswana’s obligations under the Convention on
Biological Diversity (CBD) into its national development and sectoral planning frameworks
through a renewed and participative ‘biodiversity planning’ and strategizing process, in a manner
that is in line with the global guidance contained in the CBD’s Strategic Plan for 2011-2020.
11. In order to achieve the above objective, three ‘outcomes’ (corresponding to GEF
components) are expected from the project:
Outcome 1 – A participative stocktaking exercise on biodiversity planning takes place
and national biodiversity targets are developed in response to the global Aichi Targets
Outcome 2 – The NBSAP is revised/updated and it fully integrates new aspects of the
CBD strategic plan, such as mainstreaming and anchoring the implementation of the plan
into national development frameworks, valuing ecosystem services and promoting
ecosystem-based adaptation and resilience
Outcome 3 – National frameworks for resource mobilization, Convention reporting and
exchange mechanisms are established and strengthened
12. The Outcomes of the project, as well as the expected outputs and activities under those,
are thoroughly described in the GEF proposal in Annex 1.
PRODOC. v.220212 4844 GEF5 BD EA Botswana 8
PROJECT RISKS
Table 2. Project Risks Assessment and Mitigation Measures
IDENTIFIED
RISKS
RISK
ASSESSMENT
MITIGATION MEASURES DATE OF
RECORDING OF
RISK IN ATLAS*
Limited human
and technical
capacity to
implement the
project
Moderate The DEA will nominate a high level official who will serve as
the National Project Director (NPD) for the project
implementation..The Project Director will be a senior
government official with extensive experience in biodiversity
conservation. S/he will be supported by an Enabling Activities
Advisor with prior experience in biodiversity planning.
The NPD will be technically supported by the Enabling
Activities Technical Manager and his/her team, as well as by
the UNDP’s technical backstopping provided by the
UNDP/GEF Regional Technical Advisor responsible for the
project and the UNDP Environment Focal Point at the Country
Office
The NBSAP Lead Consultant will also technically lead the
development of the NBSAP.
t.b.d.
Inability to reach
consensus among
the various
stakeholders on
an agreed
strategy and
action plan
Low The Enabling Activities Technical Manager will establish and
convene a wider working group (or several thematic working
groups to be defined) to oversee a robust consultative process
that engages representatives from key sectors, administrative
leaders, and traditionally under-represented groups. Within this
working group, the specialist sub-group will work more closely
with the lead NBSAP consultant to support the development of
specific products under this project and ensure the broad
participation
t.b.d.
Lack of
willingness to
share available
biodiversity
conservation
outside
environmental
ministries and
authorities
Low An effective, user-friendly and easily updatable country-driven
CHM site will developed and linked up to the CBD’s global
CHM networks and to other information and knowledge
exchange network on biodiversity. It will be beneficial to all
stakeholders and users that provide information. This will
include advance information search, discovery, retrieval and
dissemination functions. Also uniform identity attributes,
information security standards, information access rules, user
authorization and access control will be put in place to promote
common trust. Tools and incentives will be developed to
collaborate and share knowledge and expertise and information
t.b.d.
* These risks are to be entered in Atlas shortly after PRODOC signature and prior to issuance of ASL.
PART III: Management Arrangements
13. The institutional and management arrangements for this project are described in the GEF
proposal under Project Implementation Arrangement’. The project execution modality is NEX.
The National Executing Entity is DEA MEWT. The National Biodiversity Authority may function as
Implementing Entity for certain activities linked to availing technical expertise and ensuring stakeholder
mobilisation. This form of engagement has been endorsed by the Local Project Appraisal Committee as
PRODOC. v.220212 4844 GEF5 BD EA Botswana 9
the minutes of the meeting, which deemed that the pre-selection of the National Biodiversity Authority as
Implementing Entity is in line with UNDP procedures.
14. The existing National Biodiversity Authority (NBDA) will serve as the Project Steering
Committee (PSC) and will be convened by the DEA, and will serve as the project’s coordination
and decision-making body. The Committee will equally function as the ‘Project Board’, as per
guidance in UNDP’s Programme and Operations Policies and Procedures (POPP).The PSC will
include representation of all the key project stakeholders. It will meet according to the necessity,
but not less than once in 6 months, to review project progress, approve project work plans and
approve major project deliverables. The PSC is responsible for ensuring that the project remains
on course to deliver products of the required quality to meet the outcomes defined in the project
document.
15. Until the PSC has met and has deliberated, the following are the proposed TOR for the
Committee
Provide policy and strategic oversight and support to the implementation of the project, in
particular to the process of updating the NBSAP, developing the country’s CHM and of
completing and submitting national reports to the CBD with full government endorsement.
Advise and ensure stakeholder involvement on matters of biodiversity sectoral and
development mainstreaming, biodiversity valuation and on the nexus biodiversity-climate
change.
Review and approve project’s annual workplans, as well as other project planning and
implementation instruments.
Provide inputs to the projects’ APR/PIR.
Support project evaluations, if applicable
Deliberate on the TOR and membership for other committees and working groups that are
expected contribute to the implementation of project activities and the achievement of its
outcomes.
Any other relevant task as applicable.
16. Besides the roles and responsibilities of different stakeholders outlined in this PRODOC
and in the approved proposal in Annex 1, the following project diagram represents the expected
key relationships governing the project.
17. Project Board is responsible for making management decisions for a project in particular
when guidance is required by the Project Manager. The Project Board plays a critical role in
project monitoring and evaluations by quality as suring these processes and products, and using
evaluations for performance improvement, accountability and learning. It ensures that required
resources are committed and arbitrates on any conflicts within the project or negotiates a solution
to any problems with external bodies. In addition, it approves the appointment and
responsibilities of the Project Manager and any delegation of its Project Assurance
responsibilities. Based on the approved Annual WorkPlan, the Project Board can also consider
and approve the quarterly plans (if applicable) and also approve any essential deviations from the
original plans.
PRODOC. v.220212 4844 GEF5 BD EA Botswana 10
18. In order to ensure UNDP’s ultimate accountability for the project results, Project Board
decisions will be made in accordance to standards that shall ensure management for development
results, best value money, fairness, integrity, transparency and effective international
competition. In case consensus cannot be reached within the Board, the final decision shall rest
with the UNDP Project Manager.
Potential members of the Project Board are reviewed and recommended for approval during the
PAC meeting. Representatives of other stakeholders can be included in the Board as appropriate.
The Board contains three distinct roles, including:
1) An Executive: Senior officer from the Department of Environmental Affairs, representing the
project ownership to chair the group.
2) Senior Supplier: individual or group representing the interests of the parties concerned which
provide funding for specific cost sharing projects and/or technical expertise to the project. The
Senior Supplier’s primary function within the Board is to provide guidance regarding the
technical feasibility of the project. These will be representatives of the Department of Wildlife
and National Parks, the UNDP Country office and, when applicable, UNDP/GEF.
3) Senior Beneficiary: individual or group of individuals representing the interests of those who
will ultimately benefit from the project. The Senior Beneficiary’s primary function within the
Project Manager
(Enabling Activities
Technical Manager)
Project Board
Senior Beneficiary: Ministry of
Environment, Wildlife and
Tourism (MEWT), NGOs, CBOs,
Women’s groups
Executive: The
Department of
Environmental Affairs
Senior Supplier:
Department of Wildlife
and National Parks, CO
and UNDP/GEF
Project Assurance UNDP
Project Support
Project Assistant
International Consultant on
Technical BD & Mainstreaming
Issues
Project Organization Structure
TEAM A
NBSAP Lead Consultant
+ other national consultants
BD Capacity Needs Assessment
Technical BD & Mainstreaming
Issues
Expert in the interface Biodiversity
and Climate Change
Environmental Economist &
Finance Specialist
TEAM C
CHM and 5NR
Team
TEAM B
Group of experts in
biodiversity and
economic and
development
sectors
Support
PRODOC. v.220212 4844 GEF5 BD EA Botswana 11
Board is to ensure the realization of project results from the perspective of project beneficiaries.
These will be Ministry of Environment, Wildlife and Tourism (MEWT), NGOs, CBOs, Women’s
groups.
4) The Project Assurance role supports the Project Board Executive by carrying out objective and
independent project oversight and monitoring functions. The Project Manager and Project
Assurance roles should never be held by the same individual for the same project. The UNDP
Country Office, supported by UNDP/GEF, provide project assurance.
19. Project Manager: The Project Manager (PM) (“Enabling Activities Technical
Manager”) has the authority to run the project on a day-to-day basis on behalf of the
Implementing Partner within the constraints laid down by the Board. The Project Manager’s
prime responsibility is to ensure that the project produces the results specified in the project
document, to the required standard of quality and within the specified constraints of time and
cost.
20. Project Support: The Project Support role provides project administration, management
and technical support to the Project Manager as required by the needs of the individual project or
Project Manager.
21. Audit: Audit will be conducted according to UNDP Financial Regulations and Rules and
applicable Audit policies.
PART IV: Monitoring and Evaluation Plan and Budget
MONITORING AND REPORTING
22. At the initial stage of the project, the project Monitoring and Evaluation system,
composed of following components will be developed:
a) Monitoring plan, with defined benchmarks, indicators and targets, based on results and
resources framework to be developed by the PM/coordinator in consultation with relevant
UNDP programme staff;
b) Risk, issues and quality logs to be created by the PM and relevant program officer;
c) Quarterly project planning (with detailed activities and budget) and reporting to be
conducted by the PMU;
d) Quarterly project reporting and monitoring, conducted by the PMU and the Project Board
(also to include risk and issues monitoring and development of lessons learned reports);
e) Annual project planning (with general activities and budget) and reporting to be
conducted by the PMU;
f) Annual project review to be conducted by the Executive Board on the basis of monitoring
reports and products prepared by the project (also to include proposal for eventual
changes to the project strategy or even project revision)
23. All main reports will be complied by the PMU and endorsed by the Project Board.
Regular financial reports will be submitted to UNDP according to the UNDP financial rules and
regulations. The M&E System should include standardized formats (aligned with UNDP
procedures and formats) for the following documents:
PRODOC. v.220212 4844 GEF5 BD EA Botswana 12
- quarterly action plan
- quarterly progress report, including financial report
- quarterly monitoring report, including risk monitoring report
- quarterly lessons learned report
- annual action plan
- annual report, including financial report2
- the simplified Biodiversity Enabling Activities Annual Project Review / Project
Implementation Report (APR/PIR)
- PMU monthly workplans and progress reports
- task reports
- final report, including lessons learned
COMMUNICATIONS AND VISIBILITY REQUIREMENTS
24. Full compliance is required with UNDP’s Branding Guidelines. These can be accessed at
http://intra.undp.org/coa/branding.shtml, and specific guidelines on UNDP logo use can be
accessed at: http://intra.undp.org/branding/useOfLogo.html. Amongst other things, these
guidelines describe when and how the UNDP logo needs to be used, as well as how the logos of
donors to UNDP projects needs to be used. For the avoidance of any doubt, when logo use is
required, the UNDP logo needs to be used alongside the GEF logo. The GEF logo can be
accessed at: www.thegef.org/gef/GEF_logo. The UNDP logo can be accessed at
http://intra.undp.org/coa/branding.shtml.
25. Full compliance is also required with the GEF’s Communication and Visibility
Guidelines (the “GEF Guidelines”). The GEF Guidelines can be accessed at: www.thegef.org/gef/sites/thegef.org/files/documents/C.40.08_Branding_the_GEF%20final_0.pdf. Amongst other things, the GEF Guidelines describe when and how the GEF logo needs to be
used in project publications, vehicles, supplies and other project equipment. The GEF
Guidelines also describe other GEF promotional requirements regarding press releases, press
conferences, press visits, visits by Government officials, productions and other promotional
items.
26. Where other agencies and project partners have provided support through co-financing,
their branding policies and requirements should be similarly applied.
2 Biodiversity Enabling Activities use an abridged
PRODOC. v.220212 4844 GEF5 BD EA Botswana 13
PART V: Legal Context
27. This document together with the CPAP signed by the Government and UNDP which is
incorporated by reference constitute together a Project Document as referred to in the SBAA and
all CPAP provisions apply to this document.
28. Consistent with the Article III of the Standard Basic Assistance Agreement, the
responsibility for the safety and security of the implementing partner and its personnel and
property, and of UNDP’s property in the implementing partner’s custody, rests with the
implementing partner.
29. The implementing partner shall:
a) put in place an appropriate security plan and maintain the security plan, taking into
account the security situation in the country where the project is being carried;
b) assume all risks and liabilities related to the implementing partner’s security, and the
full implementation of the security plan.
30. UNDP reserves the right to verify whether such a plan is in place, and to suggest
modifications to the plan when necessary. Failure to maintain and implement an appropriate
security plan as required hereunder shall be deemed a breach of this agreement.
31. The implementing partner agrees to undertake all reasonable efforts to ensure that none
of the UNDP funds received pursuant to the Project Document are used to provide support to
individuals or entities associated with terrorism and that the recipients of any amounts provided
by UNDP hereunder do not appear on the list maintained by the Security Council Committee
established pursuant to resolution 1267 (1999). The list can be accessed via
www.un.org/Docs/sc/committees/1267/1267ListEng.htm. This provision must be included in all
sub-contracts or sub-agreements entered into under this Project Document.
PRODOC. v.220212 4844 GEF5 BD EA Botswana 14
SECTION II: STRATEGIC RESULTS FRAMEWORK (SRF) AND GEF INCREMENT
PART I: Strategic Results Framework, SRF (formerly GEF Logical Framework) Analysis
INDICATOR FRAMEWORK AS PART OF THE SRF
Objective/ Outcome Indicator Baseline End of Project target Source of
Information
Risks and
assumptions
Objective – To integrate
Botswana’s obligations
under the Convention on
Biological Diversity
(CBD) into its national
development and sectoral
planning frameworks
through a renewed and
participative ‘biodiversity
planning’ and strategizing
process, aligning the
results of the process to the
global guidance contained
in the CBD’s Strategic
Plan for 2011-2020.
The inclusion of measurable
biodiversity conservation and
sustainable use targets into the
following sectoral planning
frameworks:
Agriculture (livestock and arable)
Forestry
Wildlife
Trade
Tourism,
Energy
Mining
Transport
Development Planning & Finance
Water
Note: The above list makes corrections
to the choice of sectors that have been
indicatively mentioned in the GEF
approved EA Proposal (refer to Annex 1,
Part II, Section C, Activity III
(Developing the NBSAP, under
Component 2), sub-activity
‘Mainstreaming biodiversity into
development policies, plans and
practices and into sectoral plans and
strategies’)
During the stocktaking exercise,
the level of mainstreaming for
these specific sectors will be
assessed based on the following
criteria (answer “Y” or “N” and
justify: - Biodiversity considerations are
mentioned in sector policy
- Biodiversity considerations are
mentioned in sector policy through
specific legislation
- Regulations are in place to
implement the legislation
- The regulations are under
implementation
- The implementation of regulations
is enforced
- Enforcement of regulations is
monitored
[Results to be presented in matrix
form. Alternatively, the yes or no
answer may be substituted by a
numeric indicator for the degree of
mainstreaming’]
Target to be set during the
stocktaking exercise
Approved NBSAP
Annual budgets and
workplans
Approved
Assumptions:
The choice of
sectors and
development topic
are the most relevant
for Botswana.
Risks (applies to all
components):
Limited human and
technical capacity to
implement the
project.
Inability to reach
consensus among
the various
stakeholders on an
agreed strategy and
action plan.
Lack of willingness
to share available
biodiversity
conservation outside
environmental
ministries and
authorities.
The inclusion of measurable
biodiversity conservation and
sustainable use targets into the
following development frameworks:
During the stocktaking exercise,
the level of mainstreaming for
these specific development topics
will be assessed based on the
following criteria :
Target to be set during the
stocktaking exercise
Approved NBSAP
Annual budgets and
work plans
Approved
PRODOC. v.220212 4844 GEF5 BD EA Botswana 15
Objective/ Outcome Indicator Baseline End of Project target Source of
Information
Risks and
assumptions
Land-use management, including
spatial and infrastructural
development planning
Development finance
Poverty alleviation
Rural development and livelihoods
Food security
Local development and
decentralization
Gender
Climate change mainstreaming
Population & urban planning
Health provision, including traditional medicine
Note: The above list makes corrections
to the choice of sectors that have been
indicatively mentioned in the GEF
approved EA Proposal (refer to Annex 1,
Part II, Section C, Activity III
(Developing the NBSAP, under
Component 2), sub-activity
‘Mainstreaming biodiversity into
development policies, plans and
practices and into sectoral plans and
strategies’)
- Biodiversity considerations are part
and parcel in current policies and
practices pertaining to the
development topics in question
(answer “Y” or “N”)
- Explain how.
[Results to be presented in matrix
form. Alternatively, the yes or no
answer may be substituted by a
numeric indicator for the degree of
mainstreaming’]
Outcome 1 – A
participative stocktaking
exercise on biodiversity
planning takes place and
national biodiversity
targets are developed in
response to the global
Aichi Targets
Output 1.1 Review and stocktaking of products and results from previous biodiversity planning processes at the national level are carried out in
participative manner.
Output 1.2 In response to the global Aichi Targets, national biodiversity targets are developed in a manner that is attuned to Botswana’s reality.
Output 1.3 The achievement of national targets, developed in line with the global Aichi Targets, is duly monitored during the project duration and
beyond, and this is reported upon to the CBD through national reports and other means.
Output 1.4 In an iterative manner, Botswana taps into useful information on, and participates into, global networks and initiatives on biodiversity data
and indicators (such as the Biodiversity Indicators Partnership, Global Biodiversity Information Facility and the World Conservation
Monitoring Centre, the Global Environment Outlook portal, among other relevant ones).
Effective establishment of a multi-
sectoral/multi-stakeholder working
group (or Committee)
No working group /committee is
established
By end of 2012, a multi-
sectoral/multi-stakeholder
working group / committee is
established and it completes the
stocktaking exercise.
Project reports
CBD National
Reports
Assumptions:
The establishment
of a multi-
sectoral/multi-
stakeholder
working group will
be sustained
throughout the
lifetime of the
Development of a national targets in
response to the global Aichi Targets
No national targets have been
developed
By 2012, national targets in
response to the global Aichi
Targets are developed.
Project reports
CBD National
Reports
Official gazette (e.g.
on PA
PRODOC. v.220212 4844 GEF5 BD EA Botswana 16
Objective/ Outcome Indicator Baseline End of Project target Source of
Information
Risks and
assumptions
establishment) project.
Outcome 2 – The NBSAP
is revised/updated and it
fully integrates new
aspects of the CBD
strategic plan, such as
mainstreaming and
anchoring the
implementation of the plan
into national development
frameworks, valuing
ecosystem services and
promoting ecosystem-
based adaptation and
resilience
Output 2.1 A National Biodiversity Strategy and Action Plan (NBSAP) for Botswana, anchored into national development frameworks, is developed /
revised / updated, in a manner that is participative, widely disseminated and fully integrates new aspects of the CBD strategic plan, such as:
(i) mainstreaming; (ii) the valuing of ecosystem goods and services; and (iii) the incorporation of challenges and opportunities linked to
ecosystem-based adaptation and resilience.
Output 2.2 The updated and fully endorsed NBSAPs for (Botswana) is submitted to the CBD preferably within the deadline set by the COP.
Status of NBSAP vis-à-vis the
guidance in the CBD Strategic Plan
(2011-2020)
NBSAP is out of date and does not
consider newer guidance
By early 2014, the Botswana’s
NBSAP is fully updated, it is in
line with the guidance in the
CBD Strategic Plan (2011-
2020) and has been submitted
to the CBD COP
CBD Website. Assumption:
Botswana new
NBSAP will be the
country’s best
response to the
CBD’s Strategic
Plan (2011-2020)
and the Aichi
Targets.
Outcome 3 – National
frameworks for resource
mobilisation, Convention
reporting and exchange
mechanisms are
established and
strengthened
Output 3.1 National frameworks for NBSAP implementation is in place and includes: (i) institutional leadership for implementation is established and
strategic partnerships forged (nationally and internationally); (ii) a costed and prioritized Action Plan is appended to the NBS; (iii) needs
assessments on capacity, technology and finance are carried out; and (iv) a strategy for resource mobilization for the implementation of the
NBSAP is produced and includes a baseline assessment of existing biodiversity finance.
Output 3.2 An effective, user-friendly and easily updatable country-driven CHM site is developed; it is linked up to the CBD’s global CHM networks
and to other information and knowledge exchange network on biodiversity.
Output 3.3. Immediate CBD reporting obligations are met by Botswana in a timely manner: (1) The Second National Report to the Cartagena Protocol
by 30th September 2011; and (2) The Fifth National Report to the CBD by 31 March 2014.
Status of the national clearinghouse
mechanisms (CHM)
- CHM is not kept up to date
- It is not linked up to the CBD’s
global CHM networks
- It is not linked to other
information and knowledge
exchange network.
By 2013, the national CHM is
complete the kept up-to-date
and has been improved
CBD Website
CHM national site(s)
Assumptions:
Botswana will
develop the national
capacity to keep the
revamped CHM up-
to-date and to report
periodically to the
CBD. Status of the capacity, technology
and financial frameworks for
implementing the revised NBSAP
No framework exists By 2014, a complete plan for
implementing the NBSAP,
including capacity, technology
and finance needs assessment,
has been produced and
underpins NBSAP
implementation
Project APR/PIR
Biodiversity Support
Programme Website
(being revamped)
32. A detailed activity list and a chronogram of activities per output will be finalised / updated upon project inception.
PRODOC. v.220212 4844 GEF5 BD EA Botswana 17
CHRONOGRAMME OF ACTIVITIES (UPSTART IN 2012)
Comp Modules Guiding activities under each module 2012 2013 2014
Q1 Q2 COP 11
Q4 Q1 Q2 Q3 Q4 Q1 Q2 COP 12
Q4
1 I. Preparation 1. Rapid stocktaking and review of relevant plans, policies and
reports X X
2. Identification of stakeholders; consultations and awareness X X
3. Rapid assessment of the causes and consequences of biodiversity
loss highlighting the value of biodiversity and ecosystem services
and their contribution to human well-being
X X
II Setting national targets,
principles, & main priorities
of the strategy
4. Setting national targets, principles, & main priorities of the
strategy though national consultations X X D
2 III. Strategy and action plan
development
Completion before COP12
5. Developing the strategy and actions to implement the agreed
targets though national consultations X X X X
6. Application of the NBSAP to sub-national entities through sub-
national and local consultations X X X
7. Sectoral integration including mainstreaming into development,
poverty reduction and climate change plans through sectoral
consultations
X X X X D
3 IV. Development of
Implementation plans and
related activities
8. Development of a plan for capacity development for NBSAP
implementation. X X X X
9. Technology needs assessment X X X
10. Development of a communication and outreach strategy for the
NBSAP. X X X X X
11. Development of a plan for resource mobilization for NBSAP
implementation X X X X X
V. Institutional, monitoring,
reporting and exchange
12. Establishment/ strengthening of national coordination structures X X X X X X X X X X X
13. CHM development. X X X X X X X X X X X X
14. Development of indicators and monitoring approach X X X X X X X X X X X X
15. Fifth national report (deadline Mar 2014) X X X X X D
PRODOC. v.220212 4844 GEF5 BD EA Botswana 18
SECTION III: Total Budget and Workplan
Award ID: 00062664 Business Unit: BWA10
Project ID: 00080153 Project Title: National Biodiversity Planning to Support the implementation of the CBD
2011-2020 Strategic Plan in Botswana Award Title: PIMS 4844 GEF5 BD EA Botswana Executing Agency Department of Environmental Affairs
GEF
Component
(Outcome)
/Atlas
Activity
Impl.
Agent
Fund
ID Donor Name
ERP /
ATLAS
Budget
Code
Atlas Budget Description
TOTAL
Amount
(USD)
2012
(USD)
2013
(USD)
2014
(USD) Notes
Comp 1.
Stocktaking
and national
target setting
NEX 62000 GEF-10003 71400 Contractual Services - Individ 9,750 3,750 3,000 3,000 a
NEX 62000 GEF-10003 71600 Travel 12,500 12,500 0 0 b
NEX 62000 GEF-10003 72800 Information Technology Equip 7,000 5,000 1,000 1,000 c
NEX 62000 GEF-10003 74200 Audio Visual & Print Prod Costs 6,568 4,568 2,000 0 d
GEF Subtotal Atlas Activity 1 (Comp 1) 35,818 25,818 6,000 4,000
NEX 04000 UNDP TRAC - 00012 71200 International Consultants 35,000 10,000 18,000 7,000 e
NEX 04000 UNDP TRAC - 00012 71600 Travel 24,000 7,000 12,000 5,000 f
NEX 04000 UNDP TRAC - 00012 72300 Materials & Goods 45,324 12,000 17,000 16,324 g
NEX 00070 Progr Cost Sharing - 30071 71300 Local Consultants 24,800 8,000 6,000 10,800 h
NEX 00070 Progr Cost Sharing - 30071 74500 Miscellaneous Expenses 1,500 500 500 500 i
Cash Co-finance Subtotal Atlas Activity 1 (Comp 1) 130,624 37,500 53,500 39,624
TOTAL ACTIVITY 1 (Comp 1) 166,442 63,318 59,500 43,624
Comp 2.
NBSAP
update
NEX 62000 GEF-10003 71200 International Consultants 10,000 0 5,000 5,000 e
NEX 62000 GEF-10003 71300 Local Consultants 24,000 14,000 10,000 0 h,j
NEX 62000 GEF-10003 71400 Contractual Services - Individ 18,450 6,150 6,150 6,150 a
NEX 62000 GEF-10003 72100 Contractual Services-Companies 15,000 6,000 7,000 2,000 k
NEX 62000 GEF-10003 74100 Professional Services 10,000 0 5,000 5,000 l
NEX 62000 GEF-10003 74200 Audio Visual & Print Prod Costs 14,000 5,000 5,000 4,000 m
NEX 62000 GEF-10003 71600 Travel 15,000 0 15,000 0 f
NEX 62000 GEF-10003 74500 Miscellaneous Expenses 932 632 200 100 i
GEF Subtotal Atlas Activity 2 (Comp 2) 107,382 31,782 53,350 22,250
NEX 00070 Progr Cost Sharing - 30071 71200 International Consultants 20,000 0 10,000 10,000 e
NEX 00070 Progr Cost Sharing - 30071 71400 Contractual Services - Individ 24,000 8,000 8,000 8,000 a
NEX 00070 Progr Cost Sharing - 30071 71300 Local Consultants 29,200 7,200 11,000 11,000 h
NEX 00070 Progr Cost Sharing - 30071 71600 Travel 21,932 0 10,966 10,966 n
NEX 00070 Progr Cost Sharing - 30071 74100 Professional Services 12,000 0 6,000 6,000 o
Cash Co-finance Subtotal Atlas Activity 2 (Comp 2) 107,132 15,200 45,966 45,966
TOTAL ACTIVITY 2 (Comp 2) 214,514 46,982 99,316 68,216
Comp 3. NEX 62000 GEF-10003 71200 International Consultants 5,000 0 5,000 e
PRODOC. v.220212 4844 GEF5 BD EA Botswana 19
GEF
Component
(Outcome)
/Atlas
Activity
Impl.
Agent
Fund
ID Donor Name
ERP /
ATLAS
Budget
Code
Atlas Budget Description
TOTAL
Amount
(USD)
2012
(USD)
2013
(USD)
2014
(USD) Notes
National
frameworks
for NBSAP
implementatio
n, CDB
reporting and
exchange
mechanisms
NEX 62000 GEF-10003 71300 Local Consultants 21,000 4,000 7,000 10,000 h
NEX 62000 GEF-10003 71400 Contractual Services - Individ 7,800 7,800 a
NEX 62000 GEF-10003 71600 Travel 12,000 2,000 5,000 5,000 m
GEF Subtotal Atlas Activity 3 (Comp 3) 45,800 13,800 17,000 15,000
NEX 04000 UNDP TRAC - 00012 71300 Local Consultants 10,000 0 5,000 5,000 j
NEX 04000 UNDP TRAC - 00012 71600 Travel 30,000 0 15,000 15,000 n
NEX 04000 UNDP TRAC - 00012 72100 Contractual Services-Companies 8,000 0 4,000 4,000 p
NEX 04000 UNDP TRAC - 00012 72300 Materials & Goods 8,000 0 3,000 5,000 g
NEX 04000 UNDP TRAC - 00012 72400 Communic & Audio Visual Equip 4,000 0 4,000 0 q
NEX 00070 Progr Cost Sharing - 30071 74100 Professional Services 9,000 0 4,000 5,000 r
NEX 00070 Progr Cost Sharing - 30071 74200 Audio Visual &Print Prod Costs 10,876 0 5,876 5,000 o
NEX 00070 Progr Cost Sharing - 30071 74500 Miscellaneous Expenses 4,500 2,000 1,500 1,000 i
Cash Co-finance Subtotal Atlas Activity 3 (Comp 3) 84,376 2,000 42,376 40,000
TOTAL ACTIVITY 3 (Comp 3) 130,176 15,800 59,376 55,000
4. Project Mgt
NEX 62000 GEF-10003 71400 Contractual Services - Individ 18,000 9,000 5,000 4,000 a
GEF Subtotal Atlas Activity 4 (Proj Mgt) 18,000 9,000 5,000 4,000
NEX 00070 Progr Cost Sharing - 30071 71400 Contractual Services - Individ 73,200 23,068 25,000 25,132 a
NEX 00070 Progr Cost Sharing - 30071 71600 Travel 24,000 15,000 5,000 4,000 s
NEX 00070 Progr Cost Sharing - 30071 72100 Contractual Services-Companies 4,000 4,000 0 0 t
NEX 00070 Progr Cost Sharing - 30071 72500 Supplies 1,000 500 400 100 u
NEX 00070 Progr Cost Sharing - 30071 73200 Premises Alternations 5,000 0 0 5,000 v
NEX 04000 UNDP TRAC - 00012 74500 Miscellaneous Expenses 676 676 0 0 i
Cash Co-finance Subtotal Atlas Activity 4 (Proj Mgt) 107,876 43,244 30,400 34,232
TOTAL ACTIVITY 4 (Project Management) 125,876 52,244 35,400 38,232
.
SUB-TOTAL GEF 207,000 80,400 81,350 45,250
SUB-TOTAL CASH CO-FINANCE (GOVT & UNDP) 430,008 97,944 172,242 159,822
.
GRAND TOTAL (in cash) 637,008 178,344 253,592 205,072
PRODOC. v.220212 4844 GEF5 BD EA Botswana 20
Budget Notes a Project Support Staff over 3.2 years: (1) Enabling Activities Technical Manager @ US$600 per week (i.e. a total of US$100,800); and (2) Project Admin Assistant @ US$300
per week (i.e. a total of US$50,400). The 3.2 year duration corresponds to 168 weeks in total, of which 60 weeks are financed by GEF and the rest by the Programme Cost
Sharing. Both positions are full time and are budgeted for here under Contractual Services Individual budget lines combined. The GEF portion of the Project Admin Assistant
is budgeted for under GEF Management Costs.
b Air-Travel for International Consultant, with provision for DSA and local travel.
c 1 laptop computer for Project manager, printer and scanner to support documentation and upload onto CHM.
d Communicating the progress and results of the project to wider stakeholder body through print and electronic media.
e International Consultant on Technical Biodiversity and Mainstreaming Issues - US$69,000 ($15,000 of GEF funds) - total of 23 weeks @ US$3000 per week (from all
International Consultant budget lines combined).
f Local-Travel by road, DSA for participants attending district workshops.
g Workshop running costs (venue & meals) for workshop participants @ US$3,000 each.
h NBSAP Lead Consultant totalling US$90,000 financed by GEF ($36K) and Programme Cost-Sharing (from all Local Consultant budget lines combined).
i Bank charges, insurance and other miscellaneous expenses.
j Group of experts in biodiversity and economic and development sectors
k Upgrading Botswana's CHM: Satellite images, data sets, publications.
l Editorial & layout services for Final Report. Audit and translation to local languages.
m Printing services for the final report and the Country-study Reports.
n Travel DSA for district stakeholders workshops x 6 and a national validation workshop x 2 @ US$16,000
o Editorial, printing and publicity services
p Workshops and meetings, including facilitation and hosting services.
q Communication costs
r Web design
s International travel for Conference Participation
t Miscellaneous services to be defined.
u Cleaning products, office supplies, coffee and tea.
v Office upgrading
PRODOC. v.220212 4844 GEF5 BD EA Botswana 21
SECTION IV: ADDITIONAL INFORMATION
PART I: Other agreements
LETTERS OF ENDORSEMENT AND CO-FINANCING
[ -- Refer to separate file -- ]
Letters of Endorsement and Co-financing 4844 GEF5 BD EA Botswana.pdf
PART II: Terms of References for key project staff
TOR Background (standard for all posts)
The GEF approved funding for Biodiversity Enabling Activities in Botswana. UNDP is the GEF implementing
agency for the project, whose title is “National Biodiversity Planning to Support the implementation of the CBD
2011-2020 Strategic Plan in Botswana”
The project aims to integrate Botswana’s obligations under the Convention on Biological Diversity (CBD) into
its national development and sectoral planning frameworks through a renewed and participative “biodiversity
planning” and strategizing process, including revising the country’s NBSAP to reflect effectively the emerging
issues identified in the CBD Strategic Plan for 2011-2020.
This will be achieved through three inter-related outcomes:
Outcome 1) A participative stocktaking exercise on biodiversity planning takes place and national
biodiversity targets are developed in response to the global Aichi Targets
Outcome 2 ) The NBSAP is revised/updated and it fully integrates new aspects of the CBD strategic
plan, such as mainstreaming and anchoring the implementation of the plan into national development
frameworks, valuing ecosystem services and promoting ecosystem-based adaptation and resilience
Outcome 3) National frameworks for resource mobilization, Convention reporting and exchange
mechanisms are established and strengthened
UNDP, in close collaboration with the national implementing agency, the Department of Environmental Affairs,
under the Ministry of Environment, Wildlife and Tourism, would like to contract a qualified candidate for the
above mentioned post for rendering services to the project.
The contract will be performance-based. Terms and conditions of service linked to type of proposed contract
will apply for the specific position.
PRODOC. v.220212 4844 GEF5 BD EA Botswana 22
NATIONAL PROJECT COORDINATOR (ENABLING ACTIVITIES TECHNICAL MANAGER)
Location: Gaborone, Botswana
Application Deadline: [30 days after publication]
Category Environment and Energy
Type of Contract: [Will depend on which institution issues the contract]
Languages Required: Written English; good oral command of [second
language, if applicable] is a plus
Starting Date (date when the selected candidate is
expected to start):
[date]
Duration of Initial Contract: 1 year renewable
Expected Duration of Assignment: Up to 3.2 years
Duties and Responsibilities
Managerial responsibilities (funded by co-financing covering approx 81 weeks):
- Be responsible for the all general administrative requirements of the project, including those related to
project management and funding.
Technical responsibilities (60 weeks funded by GEF and the rest by co-financing):
- Ensure that project Objective, Outcomes, Outputs and Activities are executed in a timely and appropriate
manner.
- Develop annual work plans and budgets, and submit these to the Steering Committee and to the UNDP
Country Office for approval.
- Develop TORs for Consultants for technical services, consultants, experts, and specifications of materials as
required by the project, in consultation with the Project Director/UNDP.
- Facilitate, guide and monitor the work of consultants, and approve their deliverables in association with the
Project Committee.
- Organize and assist in project related activities, where required. These may include planning for meetings,
local and national consultations, trips, and other project related activities.
- Establish and maintain linkages with national and international organizations and persons which/who can be
of assistance to the objectives of the Project.
- Provide timely reporting of project status as required by the Project Committee and the UNDP.
- Maintain records of Project Committee meetings, decisions, actions etc.
- Coordinate with other initiatives and programs whose outcomes and outputs are relevant to this project’s
objectives.
- Any other duties assigned by the Project Committee that have direct relevance to the project.
Competencies
- Writes clearly and convincingly.
- Focuses on achieving results
- Sets priorities, produces quality outputs, meets deadlines and manages time efficiently
- Shares knowledge and is willing to provide support to others who request advice or help
- Works toward creative solutions by analyzing problems carefully and logically
- Demonstrates sufficient technical knowledge to perform effectively in own specialty
- Leads and supports team decisions
- Maintains strong relationships with partners and clients
- Facilitates meetings effectively and efficiently and to resolve conflicts as they arise.
PRODOC. v.220212 4844 GEF5 BD EA Botswana 23
Required Skills and Experience
Core skills:
- Ability to communicate effectively orally and in writing in order to communicate complex, technical
information to technical and general audiences
- Skills in negotiating effectively in sensitive situations
- Skills in achieving results through persuading, influencing and working with others
- Skills in facilitating meetings effectively and efficiently and to resolve conflicts as they arise.
Required experience:
- Bachelor’s degree in management, administration, environmental management or related field
- with a minimum of 5 years management experience at a senior level, or an advanced degree with 3 years
management experience.
Knowledge and understanding of the relevant UN Convention, environmental issues in Botswana, good
leadership, coordination, communication, and facilitation skills are essential.
- Strong skills in monitoring and evaluation, and experience in implementing environmental projects;
- Previous experience with GEF projects is an added plus;
- Ability to effectively coordinate a large, multidisciplinary team of experts and consultants;
- Be an effective negotiator with excellent oral and presentation skills;
- Excellent writing skills in English.
PROJECT ASSISTANT
Duties and Responsibilities
- Provide support on the general administrative requirements of the project, including those related to project
management and funding.
- Assist in ensuring that project Objective, Outcomes, Outputs and Activities are executed in a timely and
appropriate manner.
- Facilitate, guide and monitor the work of consultants, and approve their deliverables in association with the
Project Committee.
- Assist in project related activities, where required. These may include planning for meetings, local and
national consultations, trips, and other project related activities.
- Maintain linkages with national and international organizations and persons which/who can be of assistance
to the objectives of the Project.
- Maintain records of Project Committee meetings, decisions, actions etc.
- Any other duties assigned by the Project Manager that have direct relevance to the project.
Competencies
- Writes clearly professional correspondence adequately.
- Is a highly organized person (with filing, tidiness, time and “self” management)
- Sets priorities, produces quality outputs, meets deadlines and manages time efficiently
- Shares knowledge and is willing to provide support to others who request advice or help
- Works toward creative solutions by analyzing problems carefully and logically
- Demonstrates sufficient technical knowledge to perform effectively in own specialty
- Supports team decisions
- Maintains professional relationships with supervisors, co-workers and clients
Required Skills and Experience
Required experience:
- Bachelor’s degree in management, administration, environmental management or related field with a
PRODOC. v.220212 4844 GEF5 BD EA Botswana 24
minimum of 2 years project management experience.
- Knowledge and understanding of environmental issues in Botswana.
- Excellent writing skills in English.
PROJECT CONSULTANTS
Consultant Number of
weeks Deliverables
National NBSAP Lead Consultant 36
Refer to Annex 1 A for details, upon which
publishable TOR will be prepared by the
Group of national experts in biodiversity and
economic and development sectors 18
International Consultant on Technical
Biodiversity and Mainstreaming Issues 23
PRODOC. v.220212 4844 GEF5 BD EA Botswana 25
Project Annexes
Annex 1. Approved GEF proposal for BD EA (Headings Overview on page 3)
PART I: PROJECT IDENTIFIERS
EA Title: National Biodiversity Planning to Support the implementation of the CBD 2011-2020 Strategic
Plan in Botswana
Country(ies): Botswana GEF Project ID: 4705
GEF Agency(ies): UNDP GEF Agency Project ID: 4844
Other Executing
Partner(s):
Department of Environmental Affairs (Ministry
of Environment, Wildlife and Tourism)
Submission Date: October 19, 2011
GEF Focal Area (s): Biodiversity Project Duration (Months) 42
Check if applicable: NCSA NAPA Agency Fee ($): 20,700
A: EA FRAMEWORK
EA Objective: To integrate Botswana’s obligations under the Convention on Biological Diversity (CBD) into its national
development and sectoral planning frameworks through a renewed and participative “biodiversity planning” and strategizing process,
including revising the country’s NBSAP to reflect effectively the emerging issues identified in the CBD Strategic Plan for 2011-2020
EA COMPONENT
GRAN
T
TYPE
EXPECTED
OUTCOMES EXPECTED OUTPUTS
GRANT
AMOUNT
($)
CONFIRME
D CO-
FINANCING
($)
1) Stocktaking
and national
target setting
TA - By end of 2012, a
multi-
sectoral/multi-
stakeholder
working group is
established and it
completes the
stock-taking
exercise.
- By 2012, national
targets in
response to the
global Aichi
Targets are
developed.
1.1 Review and stocktaking of products and results from
previous biodiversity planning processes at the national
level are carried out in a participative manner.
1.2 In response to the global Aichi Targets, national
biodiversity targets are developed in a manner that is
attuned to Botswana’s reality.
1.3 The achievement of national targets, developed in line
with the global Aichi Targets, is duly monitored during the
project duration and beyond, and this is reported upon to the
CBD through national reports and other means.
1.4 In an iterative manner, Botswana taps into useful
information on, and participates into, global networks and
initiatives on biodiversity data and indicators (such as the
Biodiversity Indicators Partnership3, Global Biodiversity
Information Facility4 and the World Conservation
Monitoring Centre5, the Global Environment Outlook
portal6, among other relevant ones).
35,818 130,624
2) NBSAP TA - By early 2014, the 2.1 A National Biodiversity Strategy and Action Plan 107,382 167,132
3 www.bipindicators.net 4 www.gbif.org 5 www.unep-wcmc.org 6 geodata.rrcap.unep.org
REQUEST FOR BIODIVERSITY ENABLING ACTIVITY PROPOSAL FOR FUNDING UNDER THE GEF TRUST FUND
PRODOC. v.220212 4844 GEF5 BD EA Botswana 26
EA COMPONENT
GRAN
T
TYPE
EXPECTED
OUTCOMES EXPECTED OUTPUTS
GRANT
AMOUNT
($)
CONFIRME
D CO-
FINANCING
($)
update Botswana’s
NBSAP is fully
updated, it is in
line with the
guidance in the
CBD Strategic
Plan (2011-2020)
and has been
submitted to the
CBD COP
(NBSAP) for Botswana becomes ‘anchored’ into national
development frameworks; it is revised and updated, in a
manner that is participative, widely disseminated and fully
integrates new aspects of the CBD strategic plan, such as:
(i) mainstreaming; (ii) the valuing of ecosystem goods and
services; and (iii) the incorporation of challenges and
opportunities linked to ecosystem-based adaptation and
resilience.
2.2 The updated and fully endorsed NBSAP for Botswana is
submitted to the CBD within the deadline set by the COP.
3) National
frameworks for
NBSAP
implementation,
CDB reporting
and exchange
mechanisms
- By 2013,
complete the
updating and
improvement of
national clearing-
house
mechanisms
- By 2014,
complete plan for
implementing the
NBSAP,
including
capacity,
technology and
finance needs
assessment
3.1 National framework for NBSAP implementation is in
place and includes: (i) institutional leadership for
implementation is established and strategic partnerships
forged (nationally and internationally); (ii) a costed and
prioritized Action Plan is appended to the NBS; (iii) needs
assessments on capacity, technology and finance are carried
out; and (iv) a strategy for resource mobilization for the
implementation of the NBSAP is produced and includes a
baseline assessment of existing biodiversity finance.
3.2 A CHM section of the National Environmental
Information System (www.eis.gov.bw) website is created
according to guidance on CHMs; it is linked up to the
CBD’s global CHM networks and to other information and
knowledge exchange network on biodiversity and it is kept
up-to-date.
3.3. Immediate CBD reporting obligations are met by
Botswana in a timely manner: the Fifth National Report is
sent to the CBD by 31 March 2014.
45,800 144,376
Subtotal 189,000 442,132
EA Management Cost7 18,000 107,876
Total EA Cost 207,000 550,008
a
List the $ by EA components.
B: CO-FINANCING FOR THE EA BY SOURCE AND BY NAME
Sources of Co-
financing Name of Co-financier Type of Co-financing Amount ($)
National Government
Ministry of Environment Wildlife & Tourism,
Department of Environmental Affairs (Programme
Cost-Sharing under the UN Operational Programme)*
Grant 265,008
National Government Ministry of Environment Wildlife & Tourism In-Kind 120,000
GEF Agency UNDP Country Office Gaborone with own core funds* Grant 165,000
Total Co-financing 550,008
* Both the Programme Cost-Sharing amount and the UNDP core funds (TRAC) have been budgeted for and will be managed
together with the GEF contribution under the same budgetary award. Refer to Annex C for details. Refer also to co-financing
letters in a separate file.
7 This is the cost associated with the unit executing the project on the ground and could be financed out of trust fund or co-financing sources.
PRODOC. v.220212 4844 GEF5 BD EA Botswana 27
C: GRANT RESOURCES REQUESTED BY AGENCY, FOCAL AREA AND COUNTRY
GEF
Agency
Type of
Trust Fund Focal Area
Country
Name/Global
EA Amount
(a) Agency Fee (b)
Total
(c)=(a)+(b)
UNDP GEF TF Biodiversity (Focal
Area Set Aside) Botswana 207,000 20,700 227,700
Total Grant Resources 207,000 20,700 227,700
D: EA MANAGEMENT COST
COST ITEMS [GEF ONLY] TOTAL
ESTIMATED
PERSON WEEKS
GRANT
AMOUNT
($)
CO-
FINANCING
($)
EA
TOTAL
($)
LOCAL CONSULTANTS* 60 18,000 73,200 91,200
INTERNATIONAL CONSULTANTS* 0 0 0 0
OFFICE FACILITIES, EQUIPMENT, VEHICLES AND
COMMUNICATIONS* 0 10,676 10,676
TRAVEL* 0 24,000 24,000
OTHERS** 0 0 0
Total 18,000 107,876 125,876
* Details to be provided in Annex A. ** Other items to be clearly specified.
ADDITIONAL INFORMATION FOR TABLE D, IF APPLICABLE:
If costs for office facilities, equipment, vehicles and communications, travels are requesting for GEF financing, please provide
justification here:
n/a
PART II: ENABLING ACTIVITY JUSTIFICATION
A. ENABLING ACTIVITY BACKGROUND AND CONTEXT
Botswana is a landlocked semi arid country of 582,000 square kilometres, and it shares a border with South Africa, Zimbabwe,
Namibia and Zambia. The country is relatively flat, at 900 metres above sea level with occasional rocky outcrops. The bio-physical
and natural resource endowments and their distribution partly account for the varied population density. The population of Botswana
was estimated to be 1.7 million during the last census of 2001, and is concentrated in the eastern part of the country where extensive
arable farming is practised, on account of the relatively more favourable climatic and soil conditions. Botswana’s major towns and
villages are also found in this part of the country. The eastern part has relatively better infrastructure and economic development as
compared to other parts of the country which explains the higher population densities. Botswana’s climate is semi-arid with seasonal
and highly variable rainfall. The mean annual rainfall varies from less than 250 mm in the extreme south-western part of the country to
over 650 mm in the north. The rains fall mostly in summer between October and March. Winter rainfall, though a rare phenomenon,
has been recorded during some years between May and September.
Botswana has achieved significant economic growth rates, which are amongst the highest in the world. Real economic growth
averaged 13% in the twenty years after political independence. The high growth rates reflect the low resources at independence and
the transformation of the economy from a primarily agrarian economy to a mineral dominant one. However, in recent years, the
tourism sector of Botswana, which is largely biodiversity dependent, has grown significant in its contribution to the country’s
economy. Still, the remarkable economic growth rates conceal social inequalities. The proportion of people living below the poverty
datum line fell from 49% in 1993/4 to 30% in 2002/03 and is estimated to have reduced further to 23% by 2009. Poverty and
unemployment remain major issues. These problems are further compounded by the declining rural economy, the narrow base of the
non-mining productive sector and the inadequacy of human resources and entrepreneurial talent. The Government of Botswana
continues to address these issues by delivering programmes on agriculture and manufacturing mostly targeted at the rural poor.
Botswana’s major comparative advantage, as far as economic growth is concerned, is its diverse abundant wildlife and unique
habitats. These resources are sought after by tourists globally and are a significant contributor to all developments that take place
within the country. The tourism sector holds major potential for sustainable economic growth and job creation. Direct employment in
the sector is estimated at between 10 000 and 15 000 employees, i.e. between 3% and 4% of the formally employed labour force.
PRODOC. v.220212 4844 GEF5 BD EA Botswana 28
Tourist arrivals into the country have increased at a higher rate during the past six years, it is estimated that the sector’s contribution to
GDP has grown to more than 4.5% while tourist arrivals grew from 794 544 to 1 036 558 at an average rate of 6.7 % during the same
period.
Though much of the country is characterized by nutrient-poor sandy soils, fossil river valleys and pans, with sporadic rainfall,
Botswana harbours significant biodiversity, and it is counted among the 50 most species-rich countries in the world8. The country is an
in situ conservation front-runner, having established an impressive PA estate which incorporates some 40% of the total land territory
or approximately 243,000 km, of which about 7.7% constitutes national parks, 10.3% game reserves, and 24% Wildlife Management
Areas.
An area of important biodiversity is the Okavango Delta and associated wetlands in Northern Botswana. The Okavango, a perennial
river flowing into Botswana through Namibia from the Angolan highlands, drains into the Kalahari Desert to form a large complex of
permanent and seasonal wetlands. These wetlands support viable populations of many threatened or endangered species of mammal
and bird. They form a major part of the Zambezian Flooded Savannah ecoregion, one of WWF’s top 200 ecoregions of global
significance. The Okavango Delta is one of the largest Ramsar sites in the world. Also part of this ecoregion is the Chobe-Kwando-
Linyanti ecosystem in the north-east. Its variable flood regime and complex mosaic landforms all combine to create unusually high
beta diversity. The ecosystem is home to huge herds of elephant, buffalo, and Burchell's zebra and high densities of predators such as
Lion, Leopard, Spotted hyena and Cheetah; rare antelope species like Roan and Sable, Puku, Tsessebe, Eland, Red Lechwe,
Waterbuck, and about 440 species of birds. The area is also listed as one of the 12 Important Bird Areas (IBA) in Botswana.
In spite of this impressive endowment, Botswana’s biodiversity is under threat from a variety of factors. Threats include climate
change, pollution and overexploitation. Botswana is a dry country with a fragile ecosystem and at a threat of being affected by climate.
Botswana is expected to be faced with increased temperatures accompanied by unpredictable rainfall therefore affecting the
biodiversity of the country as it will change the prevalent vegetation and vegetation cover, in turn affecting species types, composition
and distribution. It is also projected that Botswana will experience decreased rainfall which could lead to water scarcity, and that
climate change is likely to affect the Okavango delta (Botswana Environmental and Climate Change analysis, 2008). Water scarcity
for an extended period would results in drought which leads to devastating effects on agriculture and biodiversity. Okavango delta
faces a threat of reduced inflow from upstream and rainfall over the delta and the lower envelope of flooding is expected to be reduced
by 68% (Okavango delta Management Plan, 2008).
Pollution to water and air threatens biodiversity in Botswana. Air pollution occurs as a result of various human activities such as
mining (sulphur and heavy metals), and agricultural (spraying of insecticides for control of tsetse fly in the Okavango delta). Water
pollution, both surface and underground occur due to poor disposal of hazardous chemical from mines, industrial sites and human
waste which contaminate the water sources. Leaching of toxic chemicals as a result of agricultural activities pollutes the underground
water reducing its quality for consumption and other purposes.
Overexploitation of natural resources leads to loss of biodiversity. Veld products such as phane, grapple plant and thatching grass are
faced with a threat of being exploited and in Botswana these resources are essential for subsistence and thus buffers for poor people. A
survey conducted in villages around Makgadikgadi area showed that natural resources used for subsistence purposes are firewood,
grass and wild fruits/berries. It also indicated that 86.5% of all households use wood for purposes of cooking and lighting which could
lead to their depletion (Makgadikgadi Framework Management Plan, 2010). Population pressure has led to exploitation of the natural
resources thereby affecting biodiversity. Land area under pastoral farming has increased rapidly creating pressure on the rangelands. It
has being shown that bush encroachment is likely to occur within several years and there is clear evidence of vegetation changes
around livestock watering points and settlements (Biodiversity Analysis and Technical support team, 2008).
The Department of Environmental Affairs (DEA) in the Ministry of Environment, Wildlife and Tourism (MEWT) is the national focal
point for the CBD and for most of MEAs. The department is responsible for coordination of environmental issues to ensure
environmental sustainability. It works on CBD issues in partnership with relevant stakeholders nationally. Key among the stakeholders
is the Department of Wildlife and National Parks (DWNP) which deals with the fauna aspect, the Department of Forestry and Range
Resources (DFRR) dealing with flora, and the Ministry of Agriculture (MoA) on issues relating to agro-biodiversity. In ensuring
sustained stakeholder engagement and more enhanced decision making processes as well the provision of overall guidance in the
management of biodiversity is the National Biodiversity Authority (NBDA). It is multi-stakeholder committee that works with the
national focal point on all national issues that concern the management of biodiversity.
The management of biodiversity in Botswana continues to improve as mechanisms have been put in place to provide support to
NGOs/CBOs. MEWT has the Community Conservation Fund, Community Trust Fund and the NGO Assistance Fund. Through these
modalities, community organisations continue to benefit financially and technically. This greatly assists in terms of biodiversity
management at the grassroots level. In terms of sustainability in the availability of financial mechanisms for biodiversity related
8 World Conservation Monitoring Center (1994) Priorities for conserving global species richness and endemism. Caldecott, J.O., Jenkins, M.D.,
Johnson, T. and Groombridge, B. World Conservation Press, Cambridge, UK. 36 pp
PRODOC. v.220212 4844 GEF5 BD EA Botswana 29
activity, the MEWT has recently established the National Environment Fund (NEF) which will be used to Fund biodiversity related
activities and other environmental management proposed by all stakeholders. It will be used to also tap on the willingness of the
private sector to engage financially and output wise on the environmental agenda. It is a structure that will enhance the achievement of
convention objectives.
The current challenges in attaining visible impact in biodiversity management in Botswana speak mainly to disparate biodiversity
planning and the low integration of biodiversity concerns and targets in other sectors, especially production sectors. Pilot work done
through the University of Botswana’s Okavango Research Centre, UNDP and the GEF has provided some of the impetus to increase
visibility of biodiversity management.
The current planning in Botswana cascades from the 11 District Development Plans to the National Development Plan. The challenge
is to reflect enough of the community-level development issues which include the management of biological resources and production
inputs, and their conservation requirements; as well as review of sectoral plans and policies to identify potential threats to biodiversity.
The NDP has been a sector-based plan but changed the current one (NDP-10) to focus on themes that cover multiple sectors. This
presents a better opportunity for integrating biodiversity into planning. An additional challenge to biodiversity planning is the lack of
evidence on economic benefits of biodiversity mainstreaming into the various production sectors. Work through the UNDP/UNEP
Poverty and Environment Initiative is only starting but presents an opportunity for generating the economic evidence to link
agriculture, tourism and water sectors to biodiversity.
1) National Reporting to CBD
Reports Date of Submission
to CBD Secretariat Current
Status*
Comments
National Biodiversity
Strategy and Action
Plan
5th
May 1998 Final Was under implementation for approximately 6-7 years. It became
outdated sometime in the mid 2000s.
Revision of NBSAP 14th
October
2010
Final The strategy was finalised in 2007 and covers the period 2006-2011. It
was implemented but was only formally submitted to the CBD in 2010. It
is now due for updating again, to address new guidance from the
Convention, as well as a number of emerging threats to biodiversity and
new opportunities for integrating biodiversity into national development
planning.
1st National Report 5
th May 1998 Final Submitted to the CBD.
2nd
National Report 16th
May 2001 Final Submitted to the CBD.
3rd
National Report 14th
May 2005 Final Submitted to the CBD.
4th
National Report 19th
May 2009 Final Submitted to the CBD.
2) Capacity Needs Assessments carried out YES NO
Start Date: 2004 End Date: 2009 Please list all of the CBD Program of Work and cross-cutting themes that were addressed in
the Biodiversity Enabling Activities Capacity Needs Assessments: Dates
Assessment of Capacity Building Needs in biodiversity monitoring programmes, including taxonomy 2004-2008
National Capacity Self- Assessment: Cross-cutting capacity needs assessments for the implementation of the Rio
Conventions This was conducted, with a focus on government institutions with mandates for implementation of
CBD, UNFCCC, and UNCCD.
2004- 2009
3) Clearing House Mechanism (CHM) established? YES NO
CHM link(s): The Department has completed the groundwork necessary for establishing a national CHM website as part of the
National Environmental Information System (www.eis.gov.bw). As part of this project, the architecture will be
created to complete the process, establishing the CHM facility online and linking it to the CBD’s global CHM
networks to enable reporting and information and knowledge exchange on biodiversity.
Is the CHM website maintained up to date? YES NO How many people currently operate and maintain the national CHM? n/a
How many people visited the national CHM website in the past 12 months? n/a
B. ENABLING ACTIVITY GOALS AND OBJECTIVES
PRODOC. v.220212 4844 GEF5 BD EA Botswana 30
The Baseline Project: The Current NBSAP and the new CBD Strategic Plan The new CBD Strategic Plan, adopted at CoP-10 in 2010 in Nagoya, clearly addresses the need for updating NBSAPs, stating in
Target 17 that “By 2015, each Party has developed, adopted as a policy instrument, and has commenced implementing an effective,
participatory and updated national biodiversity strategy and action plan.” The strategic plan also covers a range of issues that will need
to be incorporated into the revised NBSAPs, including guidance to countries to: a) fully realise the value of biodiversity and
ecosystem services, and incorporate these values into national and local development and poverty reduction strategies (Targets 1 and
2); b) increase the global terrestrial protected area estate from 12% to 17% and the marine estate from 6% to 10% (Target 11); c)
restore and safeguard key ecosystem services, especially for water, health and livelihoods (Target 14); and d) strengthen ecosystem
resilience to climate change and promote ecosystem-based approaches to climate change adaptation and mitigation (Target 15).
Although the 2nd
NBSAP for Botswana was concluded in 2007, and implementation of some elements began at that time, it was
formally submitted and accepted by the CBD only at a late stage – in October in 2010. The 2nd
NBSAP was prepared to cover
approximately a 5 year period, although some activites have a longer time frame. Although many of the strategy’s elements are under
implementation, its time span is reaching the end.
A number of new factors are now in operation, necessitating the development of a revised NBSAP for the period 2012 - 2016. Firstly,
there are a number of new policies, frameworks and laws that have been put in place since 2007, including the Framework
Management Plan for Makgadikgadi Wetlands Systems, the Okavango Delta Management Plan, the Environmental Management Bill,
the Draft Forest Policy and the Draft Wildlife Conservation Act. Secondly, the picture has changed since the last revision of the threats
to biodiversity, with new knowledge on the threats posed by climate change, and emerging threats from increased poaching and
wildfires, which need to be addressed in innovative ways. Finally, there are exciting new opportunities for mainstreaming biodiversity
into local, district and national development planning, using the new structure of the National Development Plan. This includes
ensuring that biodiversity objectives are taken up in development programmes, such as Botswana’s Poverty Eradication Drive, food
production initiatives under Agriculture, Rural Development and Economic Diversification Drive.
A particular opportunity exists for this enabling activities project to draw on and add value to the GEF-funded project on “Strategic
Partnerships to Improve the Financial And Operational Sustainability of Protected Areas” currently under implementation, which aims
to develop a strategy and implementation plan for PA financing, as this is an important element of the overall plan to resource strategic
priorities for biodiversity conservation nationally.
Synergy with existing tools will also be ensured, with a new emphasis on economic valuation, in line with the outcomes of the 10th
Conference of the Parties to the CBD. The NBSAP will create the framework through which biodiversity concerns can be
incorporated into plans, programmes and projects using Strategic Environmental Assessment and Environmental Impact Assessment,
Natural Resources Accounts (water, minerals and livestock), Economic Valuation of some key resources (Okavango Delta Ramsar
Site and Makgadikgadi Wetland Systems) and the Botswana Environment Outlook and State of the Environment Report.
Finally, there is a need to ensure better synergy between the NBSAP and the country’s approach in terms of the other major
Conventions - to adaptation to climate change and sustainable land management. The adoption of the CBD Strategic Plan sets a higher
bar for biodiversity management worldwide and the Government of Botwana sees the need to step up its efforts to help meet global
targets.
Much of the importance of the 3rd NBSAP will lie in its ability to catalyze active stakeholder participation in the process, rather than
simply emphasizing the production of a document. This enabling activities project is designed in such a way as to draw stakeholders
into the process of tackling the key elements of the CBD Strategic Plan’s Aichi Targets, setting appropriate national targets, drawing
out the implications for stakeholder mandates and budgets, and keeping the targets and mechanisms to achieve them top of mind at all
times. The new NBSAP will include:
A plan for integrating the value of biodiversity into national and local development and poverty reduction strategies and planning
processes, and natural resources accounting process (undertaken for minerals, livestock and water) and reporting systems, as
appropriate (Target 2)
A plan for creating incentives and removing harmful subsidies (Target 3)
A plan for developing landscapes that have sustainable production and consumption and ensure the use of natural resources falls
well within safe ecological limits. (Target 4)
A plan for fully implementing the Programme of Work on Protected Areas, including increased protection and landscape/seascape
connectivity (Target 11)
A plan for restoring and safeguarding ecosystems that provide essential services, including services related to water, and
contribute to health, livelihoods and well-being (Target 14)
A plan for strengthening ecosystem resilience and the contribution of biodiversity to carbon stocks, including the restoration of at
least 15 per cent of degraded ecosystems (Target 16)
A plan for the mobilization of financial resources for effectively implementing the Strategic Plan for Biodiversity 2011-2020 from
all sources (Target 20).
PRODOC. v.220212 4844 GEF5 BD EA Botswana 31
Proposed Response and Rationale: The new generation of BD EA. This project seeks to fully incorporate the above issues into the
NBSAP. This ‘new generation’ of NBSAP will help set a regional standard of excellence by creating a national road map for
achieving the Aichi Targets. Special emphasis will be placed on mainstreaming biodiversity into development plans, incorporating
protected area networks and sustainable production systems into ecosystem-based climate adaptation and resilience plans, and creating
sustainable finance for biodiversity conservation through the full valuation of key ecosystem services.
Alignment with GEF Focal Area Outcome(s):
BD5 Objective: Integrate CBD Obligations into National Planning Processes through Enabling Activities (herein serving as the
‘Project Development Goal’):
Focal Area Outcome 5.1: Development and sectoral planning frameworks at country level integrate measurable biodiversity
conservation and sustainable use targets.
The Project Objective is:
To integrate Botswana’s obligations under the Convention on Biological Diversity (CBD) into its national development and sectoral
planning frameworks through a renewed and participative ‘biodiversity planning’ and strategizing process, in a manner that is in line
with the global guidance contained in the CBD’s Strategic Plan for 2011-2020.
This will be achieved through the following Outcomes (corresponding to components described in detail below):
Outcome 1 – A participative stocktaking exercise on biodiversity planning takes place and national biodiversity targets are
developed in response to the global Aichi Targets
Outcome 2 – The NBSAP is revised/updated and it fully integrates new aspects of the CBD strategic plan, such as
mainstreaming and anchoring the implementation of the plan into national development frameworks, valuing ecosystem
services and promoting ecosystem-based adaptation and resilience
Outcome 3 – National frameworks for resource mobilization, Convention reporting and exchange mechanisms are established
and strengthened
Refer to Part I, Table A and to the next section for more details.
How the project plans to build national capacity
Botswana has previously undertaken assessments of existing capacity, including through the National Capacity Self-Assessment
process and the National Biodiversity Support Programme. It has also completed activities to build capacity for the implementation of
the UNCCD, UNFCCC and CBD as well as in related specialised areas such as environmental impact assessment. Despite these
efforts, the impressive qualifications of staff in some departments, as well as the institutional mechanisms that have been established,
individual, institutional and systemic capacity constraints are still perceived. These constraints include:
lack of technical skills in specialised areas (e.g. operating climate change models and interpreting results)
lack of specific competencies, such as environmental law, intellectual property or reviewing EIA reports
the absence or inadequacy of holistic thinking within the different disciplines involved in environmental management, which is
increased by limited team work
lack of prioritisation of issues that should be addressed, given limited capacity in some departments
fragmented responsibilities across institutions (for biodiversity management)
insufficient coordination between government institutions
inadequate financial and technical capacity within community organisations
absence of measures of the impact of environmental interventions
lack of negotiation skills
discontinuous and inadequate engagement with the secretariats of the MEAs between the meetings of the Conference of Parties.
A number of these areas will be addressed through the project, which aims to develop capacity in Botswana at the individual level, the
organizational level and the systemic level. Examples of each of these in elation the gaps identified above are outlined in the table
below.
Individual It is anticipated that all the individuals participating in the process of undertaking biodiversity planning to support the
implementation of the CBD Strategic Plan 2011 – 2020 will develop their capacity significantly through the process.
This includes local project staff and consultants, as well as the member of the multi-stakeholder working group and the
specialist sub-group of the working group. The specialist group, in particular, will benefit from being part of the
national target setting exercise, guided by the experience of the international consultant. The process of taking stock of
biodiversity planning efforts until now will develop participants’ evaluative capacity, while participating in defining
strategic priorities will develop their analytical capacity. The teamwork involved and the broad, interdisciplinary
nature of the exercise will contribute towards the development of holistic thinking within the different disciplines
PRODOC. v.220212 4844 GEF5 BD EA Botswana 32
involved in environmental management. This will be further enhanced by the widening of the discussion to include
mainstreaming into national development planning – examining the links between biodiversity conservation and socio-economic development, and the implications for different economic sectors and national development trajectories.
Organizational UNDP’s approach to Biodiversity Enabling activities in GEF-5 goes beyond the production of documents and the
development of a website. Much of the importance of the 3rd NBSAP will lie in its ability to draw various levels and
sectors of government into the process of tackling the key elements of the CBD Strategic Plan’s Aichi Targets,
contributing to the achievement of national targets. The involvement of these role-players in this enabling activities
project will develop their capacity by actively involving them in drawing out the implications of the targets for their
mandates and approaches to resource allocation. Organizational capacity will also be built through the process of
developing a permanent framework for reporting to the CBD and for maintaining the CHM with vital, up-to-date
information. Specifically, organizational capacity will be built through taking stock of the existing NBSAP and
identifying barriers to its implementation, setting targets and priorities, developing implementation plans for the
revised NBSAP, working out how to develop capacity further, developing the clearing-house mechanism, and developing a permanent framework for reporting to the CBD.
Systemic The approach that UNDP has developed for Biodiversity Enabling Activities in GEF5 is transformational with respect
to systemic capacity elements (i.e. policy, economic, regulatory, and accountability frameworks within which
organizations and individuals operate). The aim is to ensure that the objectives, targets and guidance from the CBD
Strategic Plan (2011-2020) become fully anchored into national development frameworks. This will be achieved by
the development of the following new aspects of the CBD strategic plan: (i) the valuing of ecosystem goods and
services; (ii) mainstreaming; and (iii) the incorporation of challenges and opportunities linked to ecosystem-based
adaptation and resilience. The knowledge developed through these activities will become part of Botswana’s new
NBSAP and will have a greater chance of influencing and even becoming policy. In particular, the following activities
are specially targeted at building systemic capacity:
assessing and integrating ecosystem services through economic valuation
mainstreaming biodiversity into development policies, plans and practices and into sectoral plans and strategies
incorporating climate change issues into NBSAPs
integrating the NBSAP implementation plan with the CBD Programme of Work on Protected Areas
implementation plan
securing sustainable finance for NBSAP implementation monitoring and reporting on the status of biodiversity under climate change scenarios.
C. DESCRIBE THE ENABLING ACTIVITY AND INSTITUTIONAL FRAMEWORK FOR PROJECT IMPLEMENTATION
Detailed Description of Activities per Project Component / Outcome
The description that follows indicates precisely how the project will develop national capacity and how the project will ensure the
sustainability of its outcomes. This description has been organized in five modules (I -V), following the GEF’s guidance, but which
for the sake of simplicity were grouped within the three already mentioned Components / Outcomes. The following are the modules:
Component Outline of modules for NBSAP Revision and Related Activities
Indicative percentage of total
GEF funding in the proposal
1 I. Preparation 10%
II. Setting national targets, principles, & main priorities of the strategy 10%
2 III. Strategy and action plan development 55%
3 IV. Development of implementation plans and related activities 10%
V. Institutional, monitoring, reporting and exchange 15%
Component 1. Stocktaking and national target setting
Key outputs expected under this component includes the following:
1.1 Review and stocktaking of products and results from previous biodiversity planning processes at the national level are carried out
in participative manner.
1.2 In response to the global Aichi Targets, national biodiversity targets are developed in a manner that is attuned to Botswana’s
reality.
1.3 The achievement of national targets, developed in line with the global Aichi Targets, is duly monitored during the project
duration and beyond, and this is reported upon to the CBD through national reports and other means.
1.4 In an iterative manner, Botswana taps into useful information on, and participates into, global networks and initiatives on
biodiversity data and indicators (such as the Biodiversity Indicators Partnership, Global Biodiversity Information Facility and the
PRODOC. v.220212 4844 GEF5 BD EA Botswana 33
World Conservation Monitoring Centre, the Global Environment Outlook portal, among other relevant ones).
Key products or publications (may be combined into one):
Brief Review of the Biodiversity Planning Process in Botswana
Biodiversity Targets for Botswana as part of national efforts to implement the CBD’s Strategic Plan for 2011-2020
In connection with the above outputs and deliverables, and as a result of the activities outlined below, Botswana will strive to
achieve the following outcomes vis-à-vis its CBD obligation and related processes:
- By end of 2012, a multi-sectoral/multi-stakeholder working group is established and it completes the stock-taking exercise.
- By 2012, national targets in response to the global Aichi Targets are developed.
Key activities (I-II):
I. Preparing for the NBSAP revision
• Taking stock of the NBSAP and identifying barriers to its implementation: This activity will involve the Group of experts in
biodiversity and economic and development sectors in Botswana. Under the leadership of the Enabling Activities Technical
Manager and with support from the NBSAP Lead Consultant, they will undertake a rapid stock-take of existing plans,
policies and practices, and of the root causes of biodiversity loss. The aim of the stock-take is not only to identify key threats,
but to understand the drivers behind these threats, as well as the key aspects of the policy environment that are barriers and
challenges to effective conservation/sustainable use. Based on existing studies and analyses, the emphasis of this activity will
be on identifying key gaps in the existing Botswana NBSAP, understanding the primary drivers and root causes, and
identifying the means of overcoming existing barriers and challenges. Because of the emphasis in this new NBSAP on
mainstreaming into national development planning, the scope of the stock-taking exercise will be broad.
• Stakeholder consultation and participation: Beyond the Group of experts in biodiversity and economic and development
sectors, which is a more restricted, the Enabling Activities Technical Manager will establish and convene a wider working
group (or several thematic working groups to be defined) to oversee a robust consultative process that engages
representatives from key sectors, administrative leaders, and traditionally under-represented groups. Within this working
group, the specialist sub-group will work more closely with the lead NBSAP consultant to support the development of
specific products under this project and ensure the broad participation (TOR are in Annex A.) The aim is to develop and
sustain a participatory process in order to increase the likelihood of successful implementation of the NBSAP. This is
especially important relative to the goals of mainstreaming biodiversity into national development plans, and promoting
resilient landscapes that include production sectors.
Specific steps in this process will include:
Establishing a multi-stakeholder working group involving relevant stakeholders interested in biodiversity
conservation and development issues to oversee the enabling activity project and development of the NBSAP
Explicitly identifying key stakeholders’ interests, and desired outcomes
Identifying potential conflicts and trade-offs, and work towards mutually acceptable solutions, including strategies
that serve mutually beneficial interests and achieve mutually beneficial outcomes
Embedding and institutionalizing these strategies in the institutions, policies, agreements, programs and mechanisms
of each sector.
II. Setting targets
• Setting targets and priorities: This activity will be overseen by the specialist group within the working group, guided by the
Project Steering Committee, and supported by an international consultant with technical expertise in biodiversity target
setting. The process will focus on setting specific, measurable, achievable and time-bound targets for the 3rd
NBSAP, based
on the global Aichi Targets, including targets on restoration of ecosystems, protected area coverage, overall biodiversity loss,
and other aspects of the Strategic Plan. Botswana’s target setting, which will be linked to priority setting among different
aspects within the NBSAP, will be completed by CoP-11.
Component 2. NBSAP Update
Key outputs expected under this component includes the following:
2.1 A National Biodiversity Strategy and Action Plan (NBSAP) for Botswana becomes ‘anchored’ into national development
frameworks; it is revised and updated, in a manner that is participative, widely disseminated and fully integrates new aspects of
the CBD strategic plan, such as: (i) mainstreaming; (ii) the valuing of ecosystem goods and services; and (iii) the incorporation of
challenges and opportunities linked to ecosystem-based adaptation and resilience. .
This is supported by consultations and the following specific studies:
Integrating the challenges to Protected Areas in the 21st Century into the NBSAP and the national implementation of the
CBD’s Programme of Work on Protected Areas (PoWPA)
PRODOC. v.220212 4844 GEF5 BD EA Botswana 34
“Localisation” of the TEEB (The Economics of Ecosystems and Biodiversity9): Assessing and capturing value in
ecosystems’ goods and services in Botswana
Exploring and costing options for ecosystem-based adaptation to climate change in Botswana
2.2 The updated and fully endorsed NBSAP for Botswana is submitted to the CBD within the deadline set by the COP.
Key products or publications:
Third National Biodiversity Strategy and Action Plan for Botswana
Sub-product 1: Challenges and Opportunities for Botswana’s Protected Areas in the 21st Century
Sub-product 2: Study on Ecosystem Valuation and Sectoral Mainstreaming of Biodiversity in Botswana
Sub-product 3: Study on the Incorporation of Challenges and Opportunities linked to Ecosystem-Based Adaptation and Resilience
in Botswana
In connection with the above outputs and deliverables, and as a result of the activities outlined below, Botswana will strive to
achieve the following outcome vis-à-vis its CBD obligations:
- By early 2014, the Botswana NBSAP is fully updated, it is in line with the guidance in the CBD Strategic Plan (2011-2020) and
has been submitted to the CBD COP.
Key Activity (III):
III. Developing the NBSAP
This step will seek to achieve the following: (i) Developing the strategy and actions to implement the agreed targets though
national consultations; (ii) Application of the NBSAP to sub-national entities through sub-national and local consultations; and
(iii) Sectoral integration including mainstreaming into development, poverty reduction and climate change plans through sectoral
consultations.
While the project will focus on updating all aspects of NBSAP, it will place particular emphasis on those aspects that are
highlighted in the 2011-2020 CBD Strategic Plan. These include the following:
• Assessing the implementation of the CBD’s Programme of Work on Protected Areas (PoWPA) in light of emerging trends
affecting Protected Areas in the 21st Century: During the CBD COP10, UNDP launched in collaboration with the GEF and
the CBD Secretariat, a seminal publication on the lessons and it has learned from its GEF portfolio with respect to protected
areas.10
Following the methods outlined in the publication, Botswana’s performance will be evaluated in relation to these
lessons about the management of protected areas, especially in light of key challenges that these will face in the 21st century,
such as increased competition for land and water, climate change and scarcity of public funding. This study will be part and
parcel of the sub-products that will corroborate to Botswana new NBSAP. The following themes will be touched upon:
Enabling Policy Environment for Protected Areas
Management Planning, Research, Monitoring and Assessment
Assessment of Threats to Protected Areas and of ecosystem restoration needs
Protected Area Governance and Participation
Protected Area Capacity
Sustainable Finance
Protected Area Networks and Ecological Gap Assessments (including in scenarios of climate change)
Connectivity Corridors and Transboundary Protected Areas
• Assessing and integrating ecosystem services through economic valuation: The study on The Economics of Ecosystems and
Biodiversity (TEEB) has drawn attention to the global economic benefits of biodiversity and ecosystem services and to the
growing costs of biodiversity loss and degradation. Botswana has done some valuable groundwork through the UNEP-UNDP
Poverty Environment Initiative (PEI), which needs to be built on through this enabling activities project. However, Botswana
has not yet explicitly linked the value of biodiversity and ecosystem services to its own national development goals, including
poverty eradication and sustainable livelihoods. Through this activity, the project will be able to demonstrate the benefits and
values of ecosystems and biodiversity at a national level, and better link ecosystems and priority sectors in national
development plans, in order to guide allocation of resources. The aim is to strengthen the point that biodiversity not only
underpins human well-being, but that biodiversity and associated ecosystem services can make a significant contribution to
poverty reduction and economic development. By engaging national specialists and providing support from global specialists,
hard economic data will be collected and processed at the country level to demonstrate the costs and benefits of investing in
biodiversity management. Capacity to carry out the assessments and make important links to priority economic sectors will
be simultaneously built within the country. The local consultant will access the relevant data and the international consultant
will provide support on analysing the data to “make the case” for biodiversity and facilitate the process of mainstreaming
9 www.teebweb.org 10 Ervin, J., N. Sekhran, A. Dinu. S. Gidda, M. Vergeichik and J. Mee. 2010. Protected Areas for the 21st Century: Lessons from UNDP/GEF’s
Portfolio. New York: United Nations Development Programme and Montreal: Convention on Biological Diversity.
PRODOC. v.220212 4844 GEF5 BD EA Botswana 35
biodiversity into sectoral planning through concrete biodiversity valuation examples.
Specific steps in this process include:
a. Identify and assess the full range of values of key ecosystem services within the country, based on
existing local, national, regional and global studies on the value of ecosystems and biodiversity,
including: the national TEEB valuation results, the valuation of protected areas, any other national
ecosystem services studies that have been conducted (e.g., water, carbon), and existing global and
regional maps and overlays of key ecosystem services
b. Identify the implications of these services for different stakeholder groups within the country,
including those who benefit from, and pay for, the maintenance of these ecosystem services, and
those that degrade ecosystems through unsustainable use.
c. Estimate and demonstrate the value of key ecosystem services (using methods appropriate to each
service), including the value of the ecosystem service in contributing to climate resilience,
adaptation and mitigation; reducing poverty, and sustaining livelihoods.
d. Where appropriate, this activity will also identify potential means of capturing the value of
targeted ecosystem services including through policies such as payments for ecosystem services
and other positive incentives.
• Mainstreaming biodiversity into development policies, plans and practices and into sectoral plans and strategies:
Mainstreaming has been defined as the internalization of biodiversity conservation goals into economic and development
sectors, policies and programs, such that they become an integral part of their functioning of these sectors.11
The Project Steering Committee, guided by the NBSAP lead consultant, will make a selection of 4-5
priority sectors to focus on for the proposed Biodiversity Planning process, selecting from the following
list:
Agriculture
Forestry
Wildlife
Livestock
Tourism,
Trade
Transport
Energy
Mining
Development Planning & Finance
Water
The Project Steering Committee, guided by the NBSAP lead consultant, will make a selection of 4-5
priority development areas / topics to focus on in the project, selecting from the following list:
Land-use management, including spatial and infrastructural development planning
Development finance
Poverty alleviation
Rural development and livelihoods
Food security
Local development and decentralization
Rights of indigenous groups
Gender
Climate change mainstreaming
Population & urban planning
Health provision, including traditional medicine
• Incorporating climate change issues into NBSAP: The previous NBSAP did not adequately address aspects of climate
change. Botswana already has a gap analysis completed in 2009 of the protected area estate in relation to biodiversity
conservation priorities. This will be updated through this activity, taking into account the following additional factors, and
feeding the results into the NBSAP:
a) identifying, protecting and appropriately managing areas important for carbon sequestration;
b) updating the country’s ecological gap assessment to include predicted future distribution of biodiversity under climate
change scenarios;
c) assessing the impact of climate change on the functioning of ecosystem services, such as water;
d) identifying areas important for improving nature’s ability to adapt to climate change, such as altitudinal gradients and
conservation corridors
11 Petersen, C and B. Huntley. 2005. Mainstreaming Biodiversity in Productive Landscapes. Working Paper 20. Washington DC: GEF.
PRODOC. v.220212 4844 GEF5 BD EA Botswana 36
e) identifying areas of particular importance for restoration in order to improve climate resilience, adaptation and
mitigation.
Component 3. National frameworks for NBSAP implementation, CDB reporting and exchange mechanisms
Key outputs expected under this component includes the following:
3.1 National frameworks for NBSAP implementation is in place and includes: (i) institutional leadership for implementation is
established and strategic partnerships forged (nationally and internationally); (ii) a costed and prioritized Action Plan is appended
to the NBSAP; (iii) needs assessments on capacity, technology and finance are carried out; and (iv) a strategy for resource
mobilization for the implementation of the NBSAP is produced and includes a baseline assessment of existing biodiversity
finance.
3.2 A CHM section of the National Environmental Information System (www.eis.gov.bw) website is created according to guidance
on CHMs; it is linked up to the CBD’s global CHM networks and to other information and knowledge exchange network on
biodiversity and it is kept up-to-date..
3.3 Immediate CBD reporting obligations are met by Botswana in a timely manner: the Fifth National Report to the CBD by is due
by 31 March 2014.
Key products or publications (first two may be combined into one):
Straightforward and feasible NBSAP implementation plan, which ensures the effective implementation of the Action Plan
contained in the NBSAP
Fully functional CHM for Botswana, based on best international practice on the matter
Fifth National Report
In connection with the above outputs and deliverables, and as a result of the activities outlined below, Botswana will strive to
achieve the following outcomes vis-à-vis its CBD obligation and related processes:
- By 2013, complete the updating and improvement of national clearing-house mechanisms
- By 2014, complete plan for implementing the NBSAP, including capacity, technology and finance needs assessment
Key Activities (IV-V):
IV. Developing implementation plans
This activity will focus on developing an overall plan for implementing the NBSAP. This implementation plan will include
the following components:
a) Developing an overall implementation plan: The primary output of this activity is an overall implementation plan that
delineates major steps, responsible parties, costs for main activities, expected outcomes and a timeline
b) Integrating the NBSAP implementation plan with the CBD Programme of Work on Protected Areas implementation plan:
Botswana will place particular emphasis on those aspects of Target 11 from the CBD Strategic Plan, including our plans for
improving management effectiveness, sustainably financing protected areas and integrating protected areas into the wider
landscape.
c) Securing sustainable finance for NBSAP implementation: Article 20 of the Convention mentions the need for Parties “to
provide, in accordance with its capabilities, financial support and incentives in respect of those national activities which are
intended to achieve the objectives of this Convention.” In the past few years, there has been a wide proliferation of innovative
biodiversity finance mechanisms, such as payments for ecosystem services, conservation trust funds, biodiversity offsets and
bio-carbon funding, among many others. We are still in the early stages of exploring these mechanisms. This activity is
critical in ensuring that resources are in place to implement the NBSAP. It will focus on the following:
Identifying the existing financial gap for implementing the NBSAP
Identifying potential sources of revenue for filling these gaps
Assessing the feasibility for these revenue sources
Developing a detailed plan for operationalizing these revenue sources
d) Assessing and strengthening capacity needs: One of the primary areas of enabling activities is the assessment of capacity
needs. The decisions at CoP-10 place new and ambitious demands on countries, including requirements to protect and
sustainably manage their lands and water, to develop comprehensive plans that integrate climate change into their land use,
development and sectoral plans and strategies, and to develop appropriate biodiversity and climate policies, laws and
incentives. This activity will ensure that Botswana develops a road map for strengthening these specific capacities. As per the
PRODOC. v.220212 4844 GEF5 BD EA Botswana 37
NCSA report, Botswana is currently faced with a number of challenges on prevailing capacity needs. The ‘Needs
Assessment’ will be incorporated into the NBSAP Implementation Plans. The critical components vary from systemic,
institutional down to individual capacity. Building on existing capacity needs assessment, and using existing guidance, the
Enabling Activities Technical Manager, with support from the Working Group and the Lead NBSAP Consultant, will identify
the following gaps inter alia, along with capacity-building strategies to fill those gaps:
Development of relevant and specific biological diversity (BD) regulatory framework under overarching national
environmental polices including development of ABS legislation: policy, regulations and guidelines
Development of district specific biodiversity action plans for purposes of role clarity and implementation and prioritise
biodiversity projects based on specific needs of respective districts
Designation of various NFP across the economy for the programmes of work under the CBD and operationalize the
obligations and regulations of the convention.
There is need for skills that implementers within and outside government need including Environmental law, Ecology,
Biotechnology. The staff from different implementing departments need skills on raising awareness and implementation
of the CBD including budgeting and financial management and Project management
V. Institutionalizing, monitoring and reporting
• Monitoring and reporting on the status of biodiversity under climate change scenarios: Monitoring and reporting on the status
of biodiversity is a key aspect of several Programmes of Work within the CBD. To date, efforts to monitor and report on the
status of biodiversity have been sporadic and have typically not taken into full account the status and trends of biodiversity,
the status of effective conservation, the contribution of ecosystem services (such as water and carbon), and the likely impacts
of climate change on biodiversity and ecosystem services. Through this project, we will ensure that future monitoring and
reporting on the status of biodiversity and ecosystem services is comprehensive, and fully incorporates climate change issues.
• Developing clearinghouse mechanisms (CHM): Botswana has a done the groundwork to gather information for an up-to-date
CHM which captures not only biodiversity information but includes all thematic areas within the environment domain. This
project will enable this information to be made available online through the National Environmental Information System
(www.eis.gov.bw) and to link to the CBD network and other international networks.
• Developing a permanent framework for reporting to the CBD: Parties to the CBD committed to submitting a fifth national
report by 2014. In this project, Botswana will submit a 5th
National Report that fully covers the NBSAP, key changes in the
status and trends in biodiversity status, threats and conservation, and will develop a long-term reporting framework that will
enable us to better track changes over time. This framework touches three aspects, which will be strengthened by a number of
different activities under this project: (i) the abovementioned setting up of the CHM for Botswana; (ii) the strengthening of
national capacity and leadership for managing biodiversity planning in the country; and (iii) the availability of national
finance on a recurrent basis for the purpose of CBD reporting, so that GEF and other mechanisms become gradually
complementary in this respect.
Project consistency with national strategies and plans or reports and assessments relevant for the CBD, as well as other cross-
cutting assessments and priority setting exercises
Botswana ratified the UN Convention of Biological Diversity in 1995 and it is making important efforts to fulfil its obligations under
it, as well as to implement the Convention at the national level, including several of its Programmes of Work. Yet, there are gaps
linked to national capacity and which Botswana needs external assistance to address.
Part II, Section A in this proposal contains a matrix listing different reports and assessments relevant for the CBD, as well as other
cross-cutting assessments and priority setting exercises. This proposal fits well with the progress presented in the matrix, including the
several gaps that need to be fulfilled in connection with this progress so far.
This proposed enabling activities project is consistent with the following national policy, legislation, plans and strategies:
- National Biodiversity Strategy and Action Plan (2007), although now outdated
- Framework Management Plan for Makgadikgadi Wetlands Systems
- Okavango Delta Management Plan
- Wetlands Inventory Report
- Emerging legislation: Environmental Management Bill, Draft Forest Policy, Draft Wildlife Conservation Act
Project implementation arrangement:
The project will be implemented over a period of 3.2 years. The Department of Environmental Affairs (DEA) under the Ministry of
Environment, Wildlife and Tourism (MEWT) is the government institution responsible for the implementation of the project and will
act as the Executing Agency. UNDP is the GEF Agency for the project and accountable to the GEF for the use of funds. The project is
nationally executed (NEX), in line with the Standard Basic Assistance Agreement (SBAA, 15-Feb-1982) between the UNDP and the
PRODOC. v.220212 4844 GEF5 BD EA Botswana 38
Government of Botswana (GoB).
The overall responsibility for the project implementation by DEA implies the timely and verifiable attainment of project objectives
and outcomes. The DEA will provide support to, and inputs for, the implementation of all project activities. The DEA will nominate a
high level official who will serve as the National Project Director (NPD) for the project implementation. The NPD will chair the
Project Steering Committee (PSC) as well as the working group and specialist sub-group set up to drive the stock-taking and target
setting work in Component 1, and will be responsible for providing government oversight and guidance to the project implementation.
The NPD will not be paid from the project funds, but will represent a Government in kind contribution to the Project. The NPD will be
technically supported by the Enabling Activities Technical Manager and his/her team, as well as by the UNDP’s technical
backstopping provided by the UNDP/GEF Regional Technical Advisor responsible for the project and the UNDP Environment Focal
Point at the Country Office.
All consultants hired by the project will be recruited using standard recruitment procedures of the Executing Agency (Department of
Environmental Affairs) and will report directly to the Enabling Activities Technical Manager and indirectly to the NPD. Some of the
first tasks of the Enabling Activities Technical Manager with respect implementation are to: (1) refine the TORs for project
consultants assigning clear responsibility for specific products in accordance with the profiles of the selected candidates; (2) prepare
detailed workplans for the project; and (3) ensure that consultants complete time sheets detailing activities. It is possible that technical
expertise and support to implementation can be sourced from the University of Botswana, particularly from the Okavango Research
Institute.
Working closely with the DEA, the UNDP Country Office (UNDP-CO) will be responsible for: (i) providing financial and audit
services to the project; (ii) recruitment of specialised consultants and service providers (when requested by DEA); (iii) overseeing
financial expenditures against project budgets approved by PSC; (iv) appointment of independent financial auditors; and (iv) ensuring
that all activities, including procurement and financial services, are carried out in strict compliance with UNDP/GEF procedures. A
UNDP staff member will be assigned with the responsibility for the day-to-day management and control over project finance.
The existing National Biodiversity Authority (NBDA) will serve as the Project Steering Committee (PSC) and will be convened by the
DEA, and will serve as the project’s coordination and decision-making body. The PSC will include representation of all the key
project stakeholders. It will meet according to the necessity, but not less than once in 6 months, to review project progress, approve
project work plans and approve major project deliverables. The PSC is responsible for ensuring that the project remains on course to
deliver products of the required quality to meet the outcomes defined in the project document.
The day-to-day administration of the project will be carried out by a dedicated Project Coordinating Unit (PCU), comprising a
Enabling Activities Technical Manager and Project Assistant, who will be located within the DEA offices. The Enabling Activities
Technical Manager will liaise and work closely with all partner institutions to link the project with complementary national programs
and initiatives. The Enabling Activities Technical Manager is accountable to the DEA, and the PSC for the quality, timeliness and
effectiveness of the activities carried out, as well as for the use of funds.
UNDP’s comparative advantage for Biodiversity Enabling Activities
UNDP has historically been the largest GEF implementing agency in terms of assisting countries in undertaking biodiversity enabling
activities, having assisted more than 100 countries with it through several projects. These projects helped countries prepare their
original Biodiversity Strategy and Action Plans, prepare their reports to the CBD COP, from the first to the fourth, and assess capacity
needs in a number of countries. UNDP supported Botswana with its first generation of Biodiversity Enabling Activities. The project
was financially closed in 2005 and produced all of its expected results. Botswana accessed funding for its fourth national report
through the GEF UNDP-UNEP project in 2008 and also produced the expected report. The monitoring of this global project was
carried out by the Botswana Country Office. Furthermore, UNDP has a large and active GEF biodiversity portfolio in Botswana and
two professional staff dedicated to monitoring it.
These synergies will be created primarily with the following projects, but not restricted to them:
- The newly approved UNDP/GEF project under development “Improved Management Effectiveness of the Chobe-Kwando-
Linyanti Matrix of Protected Areas”
- The UNDP/GEF BiOkavango Project “Building Local Capacity for Conservation and Sustainable Use of Biodiversity in the
Okavango Delta”
- The UNDP/GEF Project “Strategic Partnerships to Improve the Financial and Operational Sustainability of Protected
Areas”
- The WB/GEF project “Human-Wildlife-Coexistence Management Project in Northern Botswana”
The UNDP Country Office in Gaborone, Botswana includes an Energy and Environment Programme, with a dedicated Environmental
Focal Point (EFP) supported by technical and administrative staff. The EFP is also supported by the Regional Technical Advisor for
Ecosystems and Biodiversity for Eastern and Southern Africa, based at the Regional Services Centre in Pretoria, South Africa.
PRODOC. v.220212 4844 GEF5 BD EA Botswana 39
Successful implementation of this proposed enabling activities project will also rely on UNDP's country-level coordination experience
in integrated policy development, human resources development, gender issues, institutional strengthening, and non-governmental and
community participation. All of these elements are all part of UNDP’s programme in Botswana.
Project’s alignment with UNDP’s programme for Botswana
This project is in line with the objectives of the United Nations Development Assistance Framework (UNDAF) for 2010 - 2016, which
prioritises the environment and the fight against poverty.
The UN-GoB Programme & Operational Plan of 2010-2014 places special focus on environmental matters and the protection of the
Botswana’s biodiversity endowment as a key to its successful development.
The relevant Environment Outputs identified by the Country Programme with respect to this project are:
Global environmental concerns and commitments integrated in national planning and policy
Improved awareness and understanding among decision makers and the public of linkages between environmental sustainability
and human poverty and well-being
Improved national capacity to negotiate and implement global benefits.
Stakeholder involvement in the implementation of the project
NGO Fund under MEWT to assist NGOS in implementation of biodiversity related projects - allocated $500,000 during NDP 9 (2003-
2009) Creation of Environment Fund to fund environmental reclamation projects by Community Based Organizations (CBOs)
The stakeholder involvement element is embedded in the description of several activities within this proposal which will have a
consultative and participatory character. A full stakeholder involvement plan will be developed in connection with the preparation of
the UNDP Project Document that will operationalise this proposal at the level of UNDP, allowing Botswana to access the funding.
The following is an indicative and non-exhaustive list of stakeholders to be involved:
21 Community Trusts in Okavango region
Community Trusts in Chobe-Linyanti region, e.g. the Chobe Enclave Conservation Trust-CECT,Kazungula Lesoma
Pandamatenga Community Trust-KALIPA
Ngamiland District CBNRM Forum
CBNRM Forum and support programme
People and Nature Trust
CARACAL
Ditshwanelo-Human Rights
Botswana Community Based Organisation Network
Botswana Council of Non-Governmental Network
Trust for Okavango Cultural and Development Initiatives
Birdlife Botswana
Kalahari Conservation Society
Private sector, especially game lodges, trophy hunting and safari companies
University of Botswana
Botswana College of Agriculture
Okavango Research Institute
Department of Environmental Affairs
Department of Wildlife and National Parks
District Land Use Planning Unit
Makgadikgadi Pans Wetland System
Ministry of Communications, Science and Technology
Ministry of Environment, Wildlife and Tourism
Ministry of Finance and Development Planning
National Liaison Committee
These stakeholders will be consulted in the establishment of a multi-stakeholder working group, and where appropriate will be directly
involved in the working group, which will drive the stock-taking and target-setting work to be undertaken in Component 1. They will
equally be involved in the implementation of the remainder components.
PRODOC. v.220212 4844 GEF5 BD EA Botswana 40
It will be important at this early stage of the project to draw on the wide range of expertise represented by these stakeholder groupings
which includes:
tertiary and research institutions with extensive local scientific, technical and research capacity
government departments and non-governmental organisations with experience in policy formulation and implementation
NGOs and community-based organizations with experience in implementing biodiversity conservation and sustainable
development work on the ground, as well as an understanding of the needs of local communities whose livelihoods are directly
dependent on biodiversity, and who are vulnerable in specific ways to climate change
private sector role-players who are currently investing in biodiversity conservation and tourism, and have the potential to
contribute further to closing the biodiversity “funding gap”
sectors of government at various levels whose mandate influences or is influenced by biodiversity conservation and who have the
potential to contribute to mainstreaming biodiversity conservation into development planning and resource allocation.
Gender marking
Gender equality is enshrined in Botswana's constitution, and women have the same civil rights as men. The Botswana government has,
however, identified the need to ensure that all legislation fully supports this principle. This is a complex undertaking because the
country has a dual legal system in which common law and customary law exist side by side, as well as a long history of traditional
laws, upheld by tribal structures and customary courts.
As a result, the position of women in rural areas can be affected by restrictions on women’s property rights and economic
opportunities.
UNDP works with national and local partners in the region to accelerate the integration of gender sensitive policies in all sectors,
including the environment, creating more an inclusive environment for both women and men.
More specifically, this project will explore the nexus gender-biodiversity in Botswana through the different studies that will contribute
to the country's new NBSAP.
During the project inception the mandatory UNDP gender marker will be applied. This requires that each project in UNDP's ATLAS
system be rated for gender relevance. This will for example include a brief analysis of how the project plans to achieve its
environmental objective by addressing the differences in the roles and needs of women and men.
Furthermore, gender marking implies the production of the following data by the project's year 2 and by its end:
- Total number of full-time project staff that are women
- Total number of full-time project staff that are men
- Total number of Project Steering Committee members that are women
- Total number of Project Steering Committee members that are men
- The number of jobs created by the project that are held by women
- The number of jobs created by the project that are held by men
D. DESCRIBE, IF POSSIBLE, THE EXPECTED COST-EFFECTIVENESS OF THE PROJECT:
Botswana has achieved an economic growth which is amongst the highest in the world, partly through transformation of the economy
from a totally agricultural to a mineral-dominant economy.
However, in recent years, the tourism sector of Botswana, which is largely biodiversity-dependent, has grown and contributed to the
country’s economy. Government recognizes the importance of the biodiversity and tourism sector to the economy, but this has not yet
been reflected fully in budgeting and planning processes, partly because the links between conservation and development have not
been made clear.
The proposed GEF project will ensure that a national strategy and action plan guides all stakeholders and partners in the conservation
of these precious resources, in order to avoid duplication and to ensure the application of resources in the most critical areas.
The cost-effectiveness of the proposed activities will further be ensured by combining government internal, national and international
experience in implementing similar projects.
Consultation costs financed by GEF will be kept to a minimum, as government and UNDP can finance much of it from co-financing
resources.
PRODOC. v.220212 4844 GEF5 BD EA Botswana 41
Other options were considered, e.g. the sub-contracting of an NGO or a management consultancy to carry the Enabling Activity on
behalf of government. This was considered costly and also not effective with respect to stakeholder ownership and capacity building.
It could also create a risk of bias in the development of what is to be a veritable national strategy.
E. DESCRIBE THE BUDGETED M&E PLAN:
These costs are part and parcel of the project’s budget.They may be funded by either GEF or UNDP funds, including the
Programme Cost-Sharing.
Type of M&E activity Responsible
Parties
Budget US$
Excluding project team staff
time
Time frame
Measurement of Means of Verification
for Project Purpose Indicators, Project
Progress and Performance (measured
on an annual basis)
Oversight by Project Manager
Project team
To be finalized during the
inception phase and determined
as part of the Annual Work
Plan's preparation.
Annually prior to ARR/PIR
and to the definition of
annual work plans
Simplified Biodiversity Enabling
Activities Annual Project Review /
Project Implementation Report
(APR/PIR)
Project Team
UNDP-CO
UNDP-GEF
None Annually
Quarterly progress reports (QOR) Project team None Quarterly
Terminal Report Project team
UNDP-CO
local consultant
$1,000 for printing costs
At least one month before
the end of the project
Lessons learned Project team
UNDP-GEF Regional
Coordinating Unit (suggested
formats for documenting best
practices, etc.)
To be determined as part of the
Annual Work Plan's
preparation.
Yearly
Audit UNDP-CO
Project team
$2,000 in total
To be included in the CO audit
plan.
Yearly
TOTAL indicative COST
Excluding project team staff time and UNDP staff and travel expenses ~ US$ 3,000
F. EXPLAIN THE DEVIATIONS FROM TYPICAL COST RANGES (WHERE APPLICABLE):
-- n/a--
PART III: APPROVAL/ENDORSEMENT BY GEF OPERATIONAL FOCAL POINT(S) AND GEF
AGENCY(IES)
A. RECORD OF ENDORSEMENT OF GEF OPERATIONAL FOCAL POINT(S) ON BEHALF OF THE GOVERNMENT(S): (Please attach the country endorsement letter(s) with this template).
NAME POSITION MINISTRY DATE Ingrid Mpundu Otukile Chief Natural Resources Officer Environment, Wildlife and Tourism 09-29-2011
B. GEF AGENCY(IES) CERTIFICATION
This request has been prepared in accordance with GEF policies and procedures and meets the standards of the GEF Project Review
Criteria for Biodiversity Enabling Activity approval.
Agency Coordinator,
Agency name Signature
Date
(Month, day,
year)
Project Contact Person Telephone E-mail Address
Yannick Glemarec,
UNDP/GEF Executive
Coordinator
October 19,
2011
Alice Ruhweza, Regional
Technical Advisor, EBD
Africa.
+27123548120 [email protected]
PRODOC. v.220212 4844 GEF5 BD EA Botswana 42
ANNEX A [TO THE GEF EA PROPOSAL]. CONSULTANTS TO BE HIRED FOR THE ENABLING ACTIVITY
Position Titles
$ / Person
Week
[GEF only]
Estimated
Person
Weeks
[GEF
only]
Tasks to be Performed
For EA Management
Local
Project Assistant
(3.2 years or 168
weeks in total, of
which 60 weeks are
financed by GEF and
the rest by the
Programme Cost
Sharing)
300 60
- Provide support on the general administrative requirements of the project, including those related to
project management and funding.
- Assist in ensuring that project Objective, Outcomes, Outputs and Activities are executed in a timely
and appropriate manner.
- Facilitate, guide and monitor the work of consultants, and approve their deliverables in association
with the Project Committee.
- Assist in project related activities, where required. These may include planning for meetings, local
and national consultations, trips, and other project related activities.
- Maintain linkages with national and international organizations and persons which/who can be of
assistance to the objectives of the Project.
- Maintain records of Project Committee meetings, decisions, actions etc.
- Any other duties assigned by the Project Manager that have direct relevance to the project.
Selection criteria: should have a Bachelor’s degree in management, administration, environmental
management or related field with a minimum of 2 years project management experience. Knowledge and
understanding of the relevant UN Convention, environmental issues in Botswana, good leadership,
coordination, communication, and facilitation skills are essential.
For Technical Assistance
Local
Enabling Activities
Technical Manager
(3.2 years or 168
weeks in total, of
which 60 weeks are
financed by GEF and
the rest by the
Programme Cost
Sharing)
600 60
Managerial responsibilities (funded by co-financing covering approx 81 weeks):
- Be responsible for the all general administrative requirements of the project, including those related to
project management and funding.
Technical responsibilities (60 weeks funded by GEF and the rest by co-financing):
- Ensure that project Objective, Outcomes, Outputs and Activities are executed in a timely and
appropriate manner.
- Develop annual work plans and budgets, and submit these to the Steering Committee and to the
UNDP Country Office for approval.
- Develop TORs for Consultants for technical services, consultants, experts, and specifications of
PRODOC. v.220212 4844 GEF5 BD EA Botswana 43
Position Titles
$ / Person
Week
[GEF only]
Estimated
Person
Weeks
[GEF
only]
Tasks to be Performed
materials as required by the project, in consultation with the Project Director/UNDP.
- Facilitate, guide and monitor the work of consultants, and approve their deliverables in association
with the Project Committee.
- Organize and assist in project related activities, where required. These may include planning for
meetings, local and national consultations, trips, and other project related activities.
- Establish and maintain linkages with national and international organizations and persons which/who
can be of assistance to the objectives of the Project.
- Provide timely reporting of project status as required by the Project Committee and the UNDP.
- Maintain records of Project Committee meetings, decisions, actions etc.
- Coordinate with other initiatives and programs whose outcomes and outputs are relevant to this
project’s objectives.
- Any other duties assigned by the Project Committee that have direct relevance to the project.
Selection criteria: should have a Bachelor’s degree in management, administration, environmental
management or related field with a minimum of 5 years management experience at a senior level, or an
advanced degree with 3 years management experience. Knowledge and understanding of the relevant UN
Convention, environmental issues in Botswana, good leadership, coordination, communication, and
facilitation skills are essential.
NBSAP Lead
Consultant ($90K over
3 years, of which $36K
are financed by GEF
and the rest by the
Programme Cost
Sharing).
1000 36
- Review and stocktaking of products and results from previous biodiversity planning processes at the
national level and are carried out in participative manner.
- Develop national biodiversity targets are developed in a manner that is attuned to Botswana’s reality.
- Revise and update the National Biodiversity Strategy and Action Plan (NBSAP) for Botswana in a
manner that is participative, widely disseminated and fully integrates new aspects of the CBD
strategic plan, such as: (i) mainstreaming; (ii) the valuing of ecosystem goods and services; and (iii)
the incorporation of challenges and opportunities linked to ecosystem-based adaptation and resilience.
- Develop national frameworks for NBSAP implementation and this includes: (i) institutional
leadership for implementation is established and strategic partnerships forged (nationally and
internationally); (ii) a costed and prioritized Action Plan is appended to the NBS; (iii) needs
assessments on capacity, technology and finance are carried out; and (iv) a strategy for resource
mobilization for the implementation of the NBSAP is produced and includes a baseline assessment of
existing biodiversity finance.
- Develop an effective, user-friendly and easily updatable country-driven CHM site; it is linked up to
the CBD’s global CHM networks and to other information and knowledge exchange network on
biodiversity.
Key Deliverables:
PRODOC. v.220212 4844 GEF5 BD EA Botswana 44
Position Titles
$ / Person
Week
[GEF only]
Estimated
Person
Weeks
[GEF
only]
Tasks to be Performed
Botswana’s NBSAP finalised and Validated after due national consultation (will be produced with
the assistance of other consultants)
Set of ‘straight-forward’ and feasible NBSAP implementation plans, which ensure the effective
implementation of the Action Plan contained in the NBSAP
Contributions to:
Fully functional CHM for Botswana, based on best international practice on the matter
Sub-product 1: Challenges and Opportunities for Botswana’s Protected Areas in the 21st Century
Sub-product 2: Study on Ecosystem Valuation and Sectoral Mainstreaming of Biodiversity in
Botswana
Sub-product 3: Study on the Incorporation of Challenges and Opportunities linked to Ecosystem-
Based Adaptation and Resilience in Botswana
Group of experts in
biodiversity and
economic and
development sectors
500 18
To assist the Enabling Activities Technical Manager and the NBSAP Lead Consultant in taking stock of
the success of the existing NBSAP, developing national targets in line with the global Aichi Targets and
updating Botswana’s NBSAP. The experts will cover the main sectors and areas linked to biodiversity
conservation (Agriculture, Economics, Forestry, Tourism, Trade, Travel and Transport, Fishery, Land-
use management, including spatial and infrastructural development planning, Food security, Gender,
Climate change mainstreaming, Population & urban planning). The group will be formed by 4-5
specialists in key domains. The key tasks of the group related to all described areas and sectors are:
Stocking of existing plans, policies and practices in Botswana that result in biodiversity conservation
or loss.
Identify the root causes of biodiversity loss in Botswana by first identifying the threat and then the
drivers behind the threats.
Identify the key barriers and challenges in the policy environment to effective biodiversity
conservation/sustainable use.
Based on existing studies and analyses, identify key gaps in the existing NBSAP in each sector or
area.
Identify the means to overcome existing barriers and challenges.
Submit all required information by team leaders for finalizing the NBSAP activities.
The group of experts will work extensively with all consultants responsible for specific products.
Contribution to the following deliverables:
Brief Review of the Biodiversity Planning Process in Botswana
Second National Biodiversity Strategy and Action Plan for Botswana
Sub-product 1: Challenges and Opportunities for Botswana’s Protected Areas in the 21st Century
Sub-product 2: Study on Ecosystem Valuation and Sectoral Mainstreaming of Biodiversity in
Botswana
PRODOC. v.220212 4844 GEF5 BD EA Botswana 45
Position Titles
$ / Person
Week
[GEF only]
Estimated
Person
Weeks
[GEF
only]
Tasks to be Performed
Sub-product 3: Study on the Incorporation of Challenges and Opportunities linked to Ecosystem-
Based Adaptation and Resilience in Botswana
Set of ‘straight-forward’ and feasible NBSAP implementation plans, which ensure the effective
implementation of the Action Plan contained in the NBSAP
Fully functional CHM for Botswana, based on best international practice on the matter
International
Consultant on
Technical Biodiversity
and Mainstreaming
Issues (23 weeks, of
which 5 weeks are
financed by GEF and
the rest from UNDP
TRAC funds and the
Programme Cost
Sharing)
3000 5
- Provide assistance on technical issues where international experience is of particular relevance. This
list and key deliverables under this consultancy will be more fully developed during project
implementation, but is likely to include the following:
- Analysing data and technical information to set biodiversity targets
- Incorporating climate change adaptation factors into the gap analysis of protected areas
- Collating and analysing conservation and development data, particularly economic valuation
data on key ecosystem services in Botswana in relation to socio-economic development
- Crafting simple and powerful messages that make the case for biodiversity conservation as a
key strategy for achieving national economic development and poverty reduction goals
- Supporting the biodiversity sector within government and the EA Project Manager in liaising
directly with senior government officials and politicians in other sectors, in making the case
for mainstreaming biodiversity into local, district and national development planning and for
increasing resource allocation to strategic biodiversity conservation priorities highlighted in
the NBSAP.
Note: Annexes B and C to the GEF EA Proposal, containing the TBW and the Chronogramme, are now included directly into the
PRODOC.
PRODOC. v.220212 4844 GEF5 BD EA Botswana 46
Annex 2. GEF CEO Approval Letter
PRODOC. v.220212 4844 GEF5 BD EA Botswana 47
Annex 3. Minutes of the Local Project Appraisal Committee (LPAC) Meeting
[Refer to separate file]
PRODOC. v.220212 4844 GEF5 BD EA Botswana 48