Mark Bew MBEChairman – UK BIM Task Group

ICE BIM Conference 2016Mark Bew MBE

Chairman – Digital Built Britain

UK Government – Building A New World

Page 3: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Introduction

► Where did we start?► Where are we now?► Where are we going?

Page 4: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Introduction

► Where did we start?► Where are we now?► Where are we going?

Page 5: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

1934 1944 1994 1998 2015

1934

. Rea

chin

g fo

r

the s

kies.

Alfred

Bosso

m.

1944

. Sim

on R

epor

t,

Plac

ing

and

Manag

emen

t of B

uild

ing

Contra

cts.

1994

. The

Lat

ham

Repo

rt, C

onst

ruct

ing

the

Team

. 1998

. The

Ega

n

Repor

t, Re

thin

king

Const

ruct

ion.

201

5. G

eorg

e

Osbo

urne

Fixi

ng

the

foun

datio

ns:

Crea

ting

a m

ore

pros

pero

us n

atio

n

Since 1934 c70 reports have been issued on UK construction efficiency

2011

Constant Search for Improvement

2016

Leve

l 2 -

3

Page 6: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Level 2 BIM – Part of a Bigger Picture

► Benchmarking► Procurement Methods► Government Soft Landings► DfMA / Manufacturing► Intelligent Client► Fiscal Constraint► Increasing Productivity

Page 7: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Level 2 – Beginning of the Journey

Concept Design Build Operate Organisational Business Operation

Function 1

Function 2

Function 3

Function n

Social Outcomes

Organisational Performance Multiplied through portfolios

Social Performance Multiplied through society

Operations/Facilities

Management

Level 2

Level 3

Level 4

Design Build

Page 8: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Push & Pull

1

2

3

4

5

N

N

N

MC

LD

E

S

ME

ME

Tier 1Tier 2Tier 3Tier N

E

S

Portfolio Mgt

PPM

PUSH SIDE – SUPPLY CHAIN PULL SIDE - CLIENT

MAC1

MAC2

E

P

OPS

Push Pull

Page 9: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Level 2 – Beginning of the Journey

Concept Design Build Operate Organisational Business Operation

Function 1

Function 2

Function 3

Function n

Social Outcomes

Organisational Performance Multiplied through portfolios

Social Performance Multiplied through society

Operations/Facilities

Management

Level 2

Level 3

Level 4

Design Build

► PAS1192:2 Capital Delivery► PAS1192:3 Operational Delivery► BS1192:4 Data Structure► Data Classification► Digital Plan of Works (Levels of Data Detail)► PAS1192:5 Security► BIM Contract Protocol► Government Soft Landings

Page 10: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Level 2 - Manufacturing

www.bim-level2.org/en/guidancewww.constructionprducts.org.uk

Page 11: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Level 2 – BIM Toolkit

https://toolkit.thenbs.com/

Page 12: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Level 2 – Going Forward

Page 13: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Level 2 Achievements

Page 14: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Level 2 Achievements

Page 15: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

NBS Survey Suggested 48% of respondents said that were aware and using BIM

Everett Rogers’ standard adoption curve. This follows a normal distribution curve where the ‘Innovators’, ‘Early Adopters’ and ‘Early Majority’ rapidly move to a new innovative technology to a point where its use is found within half of the population. Adoption then slows for a while as the ‘Late Majority’ join, followed by the ‘Laggards’.

BIM Uptake

New Building Magazine Survey Now States c54% using BIM

Level 2 Achievements

Page 16: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Level 2 Achievements

“I am, for example, frankly astonished that all Departments got themselves “BIM ready” by this year’s deadline”

“I think the amount of progress made is nothing short of spectacular”

Page 17: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Level 3 – Functional Improvements

http://digital-built-britain.com/

Page 18: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

What is BIM?

Page 19: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)
Page 20: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)
Page 21: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)
Page 22: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)
Page 23: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)
Page 24: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)
Page 25: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Level 3 – Functional Improvements

► You cannot change an industry by exhortation and waving your arms around. Instead, change comes from changing the drivers of the businesses that make up the industry – and, even in an industry as reactive as construction, one of those drivers has to be the preferences and demands of customers.

► BIM expands from 3D modelling to genuine collaboration; from design and construction into operations; from individual buildings to cities and their systems; and onto wherever digitising the built environment may take us.

► Lack of a feedback loop by which lessons can be learned on one project and applied on the next, so that user experience is properly represented at the inception of a project.

Page 26: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Level 3 – Measurement & Feedback

Function 1

Function 2

Function 3

Function n

Organisational Performance Multiplied through portfolios

Social Performance Multiplied through society

Operations/Facilities

Management

Level 2

Level 3

Level 4

Design Build

Page 27: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Level 3 – The Next Steps

Concept Desig n Build Operate Organisational Business Operation

Function 1

Function 2

Function 3

Function n

Social Outcomes

Organisational Performance Multiplied through portfolios

Social Performance Multiplied through society

Operations/Facilities

Management

Level 2

Level 3

Level 4

Design Build

Page 28: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Level 3

► Provide more for less► Maximise availability► Reduce whole life cost and carbon► Enable significant domestic and international growth► Ensure the UK remains in the international vanguard► Ensure security

Culture Commercial

Technical

Page 29: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Level 2 – Data Management

Capital Delivery Operational Processing

1 2 3 4 5 N N N

Portfolio Mgt

PPM

IPData

OccData

Dependency Analytics

Building Information Modelling Asset Operations Management

© Bew 2013Open Data - data.gov

Design & Construction Operation & Maintenance

Portfolio Management

Smart City

Strategy

Portfolio Management

Smart Grid

Strategy

Level 2 – Data Management

Page 30: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Level 3 – Data Management

Page 31: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Level 3 – Hard LandingsLevel 3 – Data Management

Page 32: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Dependency Analytics

Asset Operations Management

Open Data - data.gov

Maintenance

Portfolio Management

Smart City

Strategy

Portfolio Management

Smart Grid

Strategy

InteroperableCross Sector Smart Cities &

Grids

Red titles indicate integration with existing sector “Industrial

Strategies”

Open Source & Data toEncourage innovation and

growth in the technology, HPC and Build Environment Markets

Performance Management

Operational Activity

Building Information Modelling

© Bew 2013

Design & Construction

Portfolio Management

Smart City

Strategy

Capital Delivery

5 N N N IPData

OccData

4 3 2 1 0

Asset Performance Management

Operation & Performance

X

Key

Formal Data Exchange

Key Business Driver(Decision)

Level 3 – Smart – BIG?

Page 33: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Applications

Page 34: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Applications

Page 35: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

Remote Patient Monitoring Market To Double By 2016

Page 36: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)
Page 37: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)
Page 38: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)
Page 39: UK Government - Building A New World | NBS Breakfast Seminar (January 2017)

www.Level2BIM.org www.bimtaskgroup.org www.digital-built-britain.com

Thank You