Construction Arm of UEM Group

Wholly-owned by Khazanah Nasional Berhad

11 major operating companies with > 2,516 employees

Shareholders’ funds : > USD 163 million

Revenue : USD 431 million

Total assets : USD 1.3 billion(as at 30 Nov 2010

Page 3: Uemb building & civil works march 2011 usd

Engineering & Construction

Infrastructure

Maintenance

Toll Concession

Construction

Materials

Supply

Core Businesses

11 major engineering and construction companies

Synergize on 4 core businesses

Page 4: Uemb building & civil works march 2011 usd

Buildings

Infrastructure

Earthworks

- Roads

- Rail

- Drainage

- Bridges

- Utilities

- Landscaping

- Hospitals

- Airports

- Townships

- Stadiums

- Industrial Parks

- Residential & Commercial

- Earth cutting and filling

- Ground treatment

- Retaining wall system

Page 5: Uemb building & civil works march 2011 usd

* Listed on the London Stock Exchange

21.8%

*Costain Group plc

100%

Penang Bridge Sdn Bhd

100%

UEM Construction

Sdn Bhd

100%

Intria Bina Sdn Bhd

100%

PATI Sdn Bhd

100%

Kuari Pati Sdn Bhd

100%

PATI Technologies

Sdn Bhd

100%

PROPEL

100%

Soil Centralab Sdn Bhd

100%

Total Trade Sdn Bhd

100%

Buildcast Sdn Bhd

98%

HOTO Stainless Steel

Industries Sdn Bhd

100%

UEM Builders

(Singapore) Pte Ltd

Engineering & Construction

Infrastructure Maintenance & Facilities Management

Toll Concession

Direct Business Units

Investment Holdings

50%

UEM Builders-

Ansal API Pvt Ltd

100%

IBS Iconsis Sdn Bhd

100%

UEM Construction

(B) Sdn. Bhd

100%

UEM Builders

(Singapore) Pte Ltd

100%

UE Development

India Pte Ltd

100%

PT Karabha

Gryamandiri

80%

Matang Pagar

Sdn Bhd

Page 6: Uemb building & civil works march 2011 usd

0

100

200

300

400

500

600

700

2005 2006 2007 2008 2009 2010

Year

USD Million

Page 7: Uemb building & civil works march 2011 usd

40 years’ experience in engineering & construction

880 experienced professional staff (Engineers, Architects, QS,

Accountants)

USD 315 million paid up capital

USD 1.3 billion total assets

Machineries available for local and international projects

USD 80mil worth of equipment in India, Malaysia and Qatar

Page 8: Uemb building & civil works march 2011 usd

COMPLETED PROJECTS

www.uembuilders.com

Page 9: Uemb building & civil works march 2011 usd

NORTH SOUTH EXPRESSWAY

CENTRAL LINKConstruction and O&M of 45 km of tolled

expressway

PENANG BRIDGEOperation and Maintenance of 13.5 km bridge

NORTH SOUTH

EXPRESSWAY

MALAYSIA SINGAPORE SECOND CROSSINGConstruction and O&M of 44 km of highways including 2 km bridge

Construction and O&M of

955 km tolled Highway

EXPRESSWAYS

Page 10: Uemb building & civil works march 2011 usd

Construction of several packages amounting to 203 km dual

two lanes tolled expressway.

Involved in implementation of heavy repair works and

routine maintenance of the completed 848 km

expressway since 1994.

Completed in May 1995.

Project cost: USD 630 million.

NORTH-SOUTH EXPRESSWAY

Page 11: Uemb building & civil works march 2011 usd

Construction of 45 km of tolled expressway linking NKVE to

Nilai North Interchange at NSE. Gateway to KLIA airport and

Cyberjaya/Putrajaya.

Involved in implementation of heavy repair works and routine

maintenance of the completed 60 km expressway since 1997.

Completed in December 1997.

Project cost: USD 236 million.

NORTH SOUTH EXPRESSWAY CENTRAL LINK

Page 12: Uemb building & civil works march 2011 usd

Construction of 44 km of dual two/three lane tolled

expressway and 2 km of bridge linking Johor to Singapore

and to Johor City & NSE.

Involved in implementation of heavy repair works and

routine maintenance of the completed 44 km expressway

since 1997.

Completed in December 1997.

Project cost: USD 310 million.

MALAYSIA-SINGAPORE SECOND CROSSING BRIDGE

Page 13: Uemb building & civil works march 2011 usd

NORTH-SOUTH EXPRESSWAY- THIRD LANE WIDENING

North South Expressway – Proposed Third

Lane Widening and Modification for Non-

Stop Through Traffic for Packages 1, 2A,

2B, 3A, 3B, 4, 5 and 5A.

Commenced:

Package 1 -July 2005 (Completed)

Package 2A,2B,3A,3B & 4 –Aug 2005

(Completed)

Package 5 – August 2005 (Completed)

Package 5A –July 2005 (Completed)

Value : USD 253 million

Page 14: Uemb building & civil works march 2011 usd

PENANG BRIDGE WIDENING

Construction of widening of the existing Penang Bridge.

Involvement of rejuvenation of the existing east side

approach embankment foundations alongside extending

the existing substructure of the main viaduct and

providing longitudinal beams and construction of Uni-

Directional Ramps to mainland side.

Completed on August 2009.

Project cost: USD 143 million.

Page 15: Uemb building & civil works march 2011 usd

COMPLETED HIGHWAYS IN INDIA

Page 16: Uemb building & civil works march 2011 usd

MAJOR HIGHWAYS COMPLETED IN INDIA

Construction & Maintenance (for 15 years) of

Tuni - Anakapalli, NH 5, Andhra Pradesh

Length : 59 km.

Project Cost (@ EPC) : USD 48 mil.

Construction & Maintenance (for 15 years) of

Tambaram-Tindivanam,NH 45,Tamil Nadu

Length : 93 km.

Project Cost : USD 63 mil.

Tumkur–Haveri-NH4, Pkg. 2,4,5-Karnataka

Length : 200 km.

Project Cost (@ EPC) : USD 152.7 mil.

Page 17: Uemb building & civil works march 2011 usd

MAJOR HIGHWAYS COMPLETED IN INDIA

Etawah to Sikandra-NH 2, Uttar Pradesh – Pckg.1C

Length : 72km.

Project Cost : USD 63 mil.

Bhiwandi-Kalyan-Shil Phata, Maharastra

Length : 25 km.

Project Cost : USD 17 mil.

Kerala State Transport Project Phase-1

Length : 127 km.

Project Cost : USD 50 mil.

Page 18: Uemb building & civil works march 2011 usd

Upgrading of existing R1 Expressway

Length: 6.6km dual 3-lane highway

Completed: April 1998

Project cost: USD23 million

MANILA-CAVITE TOLL EXPRESSWAY PKG 1, PHILIPPINES

Page 19: Uemb building & civil works march 2011 usd

PROJECT IN QATAR

Qatar Primary Routes - Salwa Road Phase 1

Upgrading 81 km dual 4 lane highway linkingQatar-Saudi Border at Salwa to Doha

Total project cost: USD 265 million.

Completed: December 2008

Page 20: Uemb building & civil works march 2011 usd

LIGHT RAIL TRANSIT SYSTEMConstruction of total 29km elevated, underground and at

grade track including stations for the driverless automated

Light Rail Transit.

ELECTRIFIED DOUBLE TRACK Construction of total 182km of

Electrified Double Track Railway Lines

between two major cities

TRANSPORTATION

Page 21: Uemb building & civil works march 2011 usd

PUTRA LIGHT RAIL TRANSIT STATIONS, KUALA LUMPUR

Completed: 1999Value: USD 494.3 million

Project involved the construction of 29 km track way for Light Rail Transit System in Kuala Lumpur involving 22 km elevated track, 5 km underground tunnel and 2 km at-grade track.

Construction of 5 underground LRT stations, 17 above-ground and 2 at-grade stations throughout the LRT system.

Longest driverless automated LRT in the world.

Implemented in November 1994 and completed in June 1999.

Page 22: Uemb building & civil works march 2011 usd

Construction of 155 bridge crossings for the 182 km

electrified railway line linking Rawang to Ipoh.

Project Cost: USD 436 million.

31st March 2007

IPOH-RAWANG ELECTRIFIED DOUBLE TRACKING

Page 23: Uemb building & civil works march 2011 usd

NATIONAL SPORTS COMPLEXConstruction of National Stadium, aquatic centre and indoor stadium for the nation sport facilities.

KUALA LUMPUR INTERNATIONAL AIRPORT (KLIA)Construction of Satellite Building and ancillary works for the Malaysia’s largest airport.

BUILDINGS & FACILITIES

JSNACConstruction of Johor State New Administration Centre in Johor

MARDI Agriculture CentreConstruction of National Stadium, aquatic centre and indoor stadium for the nation sport facilities.

MINISTRY OF FINANCE II BUILDINGConstruction of Government Building for the Federal Government Administrative Centre in Putrajaya.

NATIONAL HEART INSTITUTEConstruction of new healthcare facilities for the extension of the National Heart Institute.

Page 24: Uemb building & civil works march 2011 usd

NATIONAL SPORTS COMPLEX, BUKIT JALIL, KUALA LUMPUR

Completed: June 1998Value: USD 263 million

100,000 capacity National Stadium (outdoor stadium), 3,700 seat National Aquatic Centre (swimming complex) and 16,000 seat Putra Stadium (indoor stadium).

Implemented in January 1994 and completed in July 1998 for the XVI Commonwealth Games.

Page 25: Uemb building & civil works march 2011 usd

COMMONWEALTH GAMES VILLAGE, BUKIT JALIL, KUALA LUMPUR

Completed: June 1998Value: USD 109 millionGross Floor Area: 198,774 m²

Construction of multi storey apartment blocks complete with recreational facilities.

1,500 units were built in total.

Page 26: Uemb building & civil works march 2011 usd

KUALA LUMPUR INTERNATIONAL AIRPORT, SATELLITE BUILDING, SEPANG

Completed: December 1998Value: USD 141 millionGross Floor Area: 148,000 m².

Design and construction of the satellite building and its ancillary works as part of the Kuala Lumpur International Airport Complex.

Project implementation in joint venture with international construction companies as consortium partners.

Page 27: Uemb building & civil works march 2011 usd

EAST MALAYSIA HOSPITALS

The planning, design, construction, equipping, commissioningand maintenance of six hospitals with a combined total of976 beds were delivered to the Ministry of Health Malaysia instages from 2002 till 2005. Five of the hospitals are located inthe state of Sabah in East Malaysia, namely Lahad Datu,Keningau, Kuala Penyu, Pitas and Kunak. One more hospital islocated in the state of Sarawak, also in East Malaysia, inSarikei.

Completed: 2004Value: USD 234 million

Page 28: Uemb building & civil works march 2011 usd

UNIVERSITY OF TECHNOLOGY PETRONAS (UTP) MOSQUE, TRONOH, PERAK

Completed: October 2005Value: USD 7.7 millionGross Floor Area: 5,659 m²

The construction and completion of thisuniquely designed ‘floating’ mosque atBandar Seri Iskandar, Perak has a capacityto accommodate 4,000 people.

The enclosed main prayer area is air-conditioned and can accommodate 1,000people. The covered prayer area,accommodating 3,000 people, which waspreviously ventilated naturally, has beenchanged into an air-conditioned system.

Page 29: Uemb building & civil works march 2011 usd

• Commenced: 10 September 2004• Completion: 6 November 2005• Value: USD90.5 million

Construction and completion of 64 units of 3-storey link home and sewerage pump, Danau Villa Link Home, Taman Desa, Kuala Lumpur.

DANAU VILLA LINK HOME, TAMAN DESA, KUALA LUMPUR

Page 30: Uemb building & civil works march 2011 usd

MINISTRY OF FINANCE BUILDING 2, PUTRAJAYA

Commenced: 4 December 2002Completed: 30 April 2007Value: USD 60 millionGross Floor Area: 67,108 m²

Design, construction and completion of office buildings to house agencies under the Ministry of Finance at the New Federal Government Administrative Centre in Putrajaya.

2 office blocks, 8 and 10-storey high with each housing two levels of basement car parks.

Scope of works include interior design works.

Page 31: Uemb building & civil works march 2011 usd

CASA DESA CONDOMINIUM, KUALA LUMPUR

Commenced: 11 July 2005Completed : 31 March 2008Value: USD 24 millionGross Floor Area: 9,794 m2

For the 410-unit Casa Desa Condominium, the contract package consists of substructure works and superstructure works.

Project involves construction of 7 blocks of condominium buildings including earthworks, bored piling and pile caps.

Page 32: Uemb building & civil works march 2011 usd

Project : Agriculture Exposition Centre (Phase 2) –

MARDI, Serdang

Commenced : 27 November 2007

Completed : 30 June 2008

Value : USD 64 million

Gross Floor Area: 25,000 m²

AGRICULTURE EXPOSITION CENTRE (PHASE 2)-MARDI, SERDANG

Page 33: Uemb building & civil works march 2011 usd

JOHOR STATE NEW ADMINISTRATIVE CENTRE (JSNAC), PHASE 1, JOHOR

Commenced: November 2005Completed: August 2008Value: USD 62 million

The development of the JSNAC on a 320-acre sitelocated at Bandar Nusajaya, 25 km from JohorBahru, Johor is divided into three precinctscomprising the Government precinct (273 acres), VIPresidences and Istana reserve (17 acres) andgovernment housing reserve (30 acres).

Phase 1 of this development is divided into five packages where three packages, has been awarded. Project involves the construction of office buildings for the new state administrative centre in Johor.

Page 34: Uemb building & civil works march 2011 usd

UEM GROUP NEW CORPORATE OFFICE, KUALA LUMPUR

Commenced: 1 June 2005Completed: December 2008Value: USD 45 million Gross Floor Area: 35,000 m²

This project involves the design and construction of a 29-storey office building with an 8-storey annex building at KL Sentral. The scope of works involves interior design.

Page 35: Uemb building & civil works march 2011 usd

PLUS HEADQUARTERS, SUBANG

Development of one block of 10-storey

office tower at Subang Toll, Petaling Jaya,

Selangor Darul Ehsan

Commenced : 15 January 2007

Completed : December 2008

Value : USD 29 million

Page 36: Uemb building & civil works march 2011 usd

STATE DEPARTMENT COMPLEX (JSNAC), NUSAJAYA

Commenced: November 2005Completed: February 2009Value: USD 63 million

Page 37: Uemb building & civil works march 2011 usd

NATIONAL HEART INSTITUTE, KUALA LUMPUR

Commenced: 5 September 2005Completed: March 2009Value: USD 64.6 millionGross Floor Area: 32,840 m²

Design, construction, supply and commissioning and maintenance of new healthcare facilities for the extension of the National Heart Institute.

This project is divided into four phases and worksentail the renovating and refurbishing of existingfacilities.

Page 38: Uemb building & civil works march 2011 usd

COLLEGE OF TECHNOLOGY (COT), DOHA, QATAR

Construction of 21 multidisciplinary buildings comprising classrooms, workshops/labs, cafeterias, recreation facilities, auditorium and administration buildings with a total area of 63,000 m2 and external infrastructure for campus area of 300,000 m2.

Project cost: USD 100 million.

Completed: October 2006

Page 39: Uemb building & civil works march 2011 usd

Project : 548 Units (5 Blocks) Apartment

Using Industrialised Building System (IBS) Method

Commenced : September 2006

Exp. Completion : March 2008

Value : USD 39 million

Gross Floor Area: 60,500 m²

GOVERNMENT APARTMENTS, PUTRAJAYA

Page 40: Uemb building & civil works march 2011 usd

Proposed Basement Structural Works for

Universal Studio

Commenced: March 2008

Completed: July 2008

Value: USD 4.5 million

Gross Floor Area: 65,800 m²

RESORTS WORLD AT SENTOSA, SINGAPORE

MC04-F1

Page 41: Uemb building & civil works march 2011 usd

ON-GOING PROJECTS

www.uembuilders.com

Page 42: Uemb building & civil works march 2011 usd

BANK KERJASAMA RAKYAT HEADQUARTERS, KUALA LUMPUR

Design, construction and completion of 2 office

towers (32 and 38-storeys), 1 block of 8-storey

annex comprises of car parks and 1 unit PPU

Commenced : 1 June 2009

Exp. Completion : December 2011

Value : USD 26 million

Gross Floor Area: 188,000 m²

Page 43: Uemb building & civil works march 2011 usd

PENANG SECOND BRIDGE

Project : Design, Construction and Completion of the Penang Second Bridge. Package 2 : Super-structure Works of Approach Spans. • Overall length - 24 km• Length over water - 17 km,• Main span : Length - 250 meters• Height clearance (above water) – 30 meters• Number of vehicle lanes – 2 + 1 for motorcycles (each

direction) Commenced : June 2009 Exp. Completion : March 2013 Value : USD 473 million

Page 44: Uemb building & civil works march 2011 usd

PHG’-S’GOR RAW WATER TRANSFER PROJECT

Pahang - Selangor Raw Water Transfer

Project Lot 1-1, Water Transfers

Tunnel & Related Works (2,260 Mld.)

Commenced : June 2009

Exp. Completion : May 2014

Value : USD 400 million

Length: 44.6km ; Diameter: 5.2m

Page 45: Uemb building & civil works march 2011 usd

1,765-acre Sushant Golf City Project in Lucknow, Uttar Pradesh

Project : Construction of various

building and engineering works at

Sushant Golf City, Lucknow U.P. India.

Commenced : 1 April 2008

Exp. Completion : February 2012

Value : USD 497 million

Total Development Area : 1,765 acre

Page 46: Uemb building & civil works march 2011 usd

Project : 4000 units Housing Project for the

National Housing Scheme, Brunei.

Commenced : 2 February 2010

Exp. Completion : February 2014

Value : USD 290 million

Total Development Area: 309 hectares

4000 UNITS HOUSING PROJECT, BRUNEI

Page 47: Uemb building & civil works march 2011 usd

NEW LCC TERMINAL AT KLIA, SEPANG

Project : Design, Construction and Completion,

Testing, Commissioning and Maintenance of Main

Terminal Building, Satellite Building, Sky Bridge

and Piers.

Commenced : 16 August 2010

Exp. Completion : April 2012

Value : USD 316 million

Page 48: Uemb building & civil works march 2011 usd

Thank You

This document is the property of United Engineers (Malaysia) Berhad. Neither the whole nor any part of this document may be reproduced, stored or transmitted in any forms or by any means without

written permission of United Engineers (Malaysia) Berhad.

This document is designed to provide information in relation to the subject matter covered for this presentation and should not be used for any other purpose. Whilst every care has been taken in its

preparation, no person should draw conclusions purely on the basis of the material contained herein. If assistance is required, reference should be made to the relevant professional of United Engineers

(Malaysia) Berhad.

A member of UEM Group

www.uembuilders.com