Download - Uemb building & civil works march 2011 usd
The Nation’s Infrastructure Partner
A member of UEM Group
www.uembuilders.com
Construction Arm of UEM Group
Wholly-owned by Khazanah Nasional Berhad
11 major operating companies with > 2,516 employees
Shareholders’ funds : > USD 163 million
Revenue : USD 431 million
Total assets : USD 1.3 billion(as at 30 Nov 2010
Engineering & Construction
Infrastructure
Maintenance
Toll Concession
Construction
Materials
Supply
Core Businesses
11 major engineering and construction companies
Synergize on 4 core businesses
Buildings
Infrastructure
Earthworks
- Roads
- Rail
- Drainage
- Bridges
- Utilities
- Landscaping
- Hospitals
- Airports
- Townships
- Stadiums
- Industrial Parks
- Residential & Commercial
- Earth cutting and filling
- Ground treatment
- Retaining wall system
* Listed on the London Stock Exchange
21.8%
*Costain Group plc
100%
Penang Bridge Sdn Bhd
100%
UEM Construction
Sdn Bhd
100%
Intria Bina Sdn Bhd
100%
PATI Sdn Bhd
100%
Kuari Pati Sdn Bhd
100%
PATI Technologies
Sdn Bhd
100%
PROPEL
100%
Soil Centralab Sdn Bhd
100%
Total Trade Sdn Bhd
100%
Buildcast Sdn Bhd
98%
HOTO Stainless Steel
Industries Sdn Bhd
100%
UEM Builders
(Singapore) Pte Ltd
Engineering & Construction
Infrastructure Maintenance & Facilities Management
Toll Concession
Direct Business Units
Investment Holdings
50%
UEM Builders-
Ansal API Pvt Ltd
100%
IBS Iconsis Sdn Bhd
100%
UEM Construction
(B) Sdn. Bhd
100%
UEM Builders
(Singapore) Pte Ltd
100%
UE Development
India Pte Ltd
100%
PT Karabha
Gryamandiri
80%
Matang Pagar
Sdn Bhd
0
100
200
300
400
500
600
700
2005 2006 2007 2008 2009 2010
Year
USD Million
40 years’ experience in engineering & construction
880 experienced professional staff (Engineers, Architects, QS,
Accountants)
USD 315 million paid up capital
USD 1.3 billion total assets
Machineries available for local and international projects
USD 80mil worth of equipment in India, Malaysia and Qatar
COMPLETED PROJECTS
www.uembuilders.com
NORTH SOUTH EXPRESSWAY
CENTRAL LINKConstruction and O&M of 45 km of tolled
expressway
PENANG BRIDGEOperation and Maintenance of 13.5 km bridge
NORTH SOUTH
EXPRESSWAY
MALAYSIA SINGAPORE SECOND CROSSINGConstruction and O&M of 44 km of highways including 2 km bridge
Construction and O&M of
955 km tolled Highway
EXPRESSWAYS
Construction of several packages amounting to 203 km dual
two lanes tolled expressway.
Involved in implementation of heavy repair works and
routine maintenance of the completed 848 km
expressway since 1994.
Completed in May 1995.
Project cost: USD 630 million.
NORTH-SOUTH EXPRESSWAY
Construction of 45 km of tolled expressway linking NKVE to
Nilai North Interchange at NSE. Gateway to KLIA airport and
Cyberjaya/Putrajaya.
Involved in implementation of heavy repair works and routine
maintenance of the completed 60 km expressway since 1997.
Completed in December 1997.
Project cost: USD 236 million.
NORTH SOUTH EXPRESSWAY CENTRAL LINK
Construction of 44 km of dual two/three lane tolled
expressway and 2 km of bridge linking Johor to Singapore
and to Johor City & NSE.
Involved in implementation of heavy repair works and
routine maintenance of the completed 44 km expressway
since 1997.
Completed in December 1997.
Project cost: USD 310 million.
MALAYSIA-SINGAPORE SECOND CROSSING BRIDGE
NORTH-SOUTH EXPRESSWAY- THIRD LANE WIDENING
North South Expressway – Proposed Third
Lane Widening and Modification for Non-
Stop Through Traffic for Packages 1, 2A,
2B, 3A, 3B, 4, 5 and 5A.
Commenced:
Package 1 -July 2005 (Completed)
Package 2A,2B,3A,3B & 4 –Aug 2005
(Completed)
Package 5 – August 2005 (Completed)
Package 5A –July 2005 (Completed)
Value : USD 253 million
PENANG BRIDGE WIDENING
Construction of widening of the existing Penang Bridge.
Involvement of rejuvenation of the existing east side
approach embankment foundations alongside extending
the existing substructure of the main viaduct and
providing longitudinal beams and construction of Uni-
Directional Ramps to mainland side.
Completed on August 2009.
Project cost: USD 143 million.
COMPLETED HIGHWAYS IN INDIA
MAJOR HIGHWAYS COMPLETED IN INDIA
Construction & Maintenance (for 15 years) of
Tuni - Anakapalli, NH 5, Andhra Pradesh
Length : 59 km.
Project Cost (@ EPC) : USD 48 mil.
Construction & Maintenance (for 15 years) of
Tambaram-Tindivanam,NH 45,Tamil Nadu
Length : 93 km.
Project Cost : USD 63 mil.
Tumkur–Haveri-NH4, Pkg. 2,4,5-Karnataka
Length : 200 km.
Project Cost (@ EPC) : USD 152.7 mil.
MAJOR HIGHWAYS COMPLETED IN INDIA
Etawah to Sikandra-NH 2, Uttar Pradesh – Pckg.1C
Length : 72km.
Project Cost : USD 63 mil.
Bhiwandi-Kalyan-Shil Phata, Maharastra
Length : 25 km.
Project Cost : USD 17 mil.
Kerala State Transport Project Phase-1
Length : 127 km.
Project Cost : USD 50 mil.
Upgrading of existing R1 Expressway
Length: 6.6km dual 3-lane highway
Completed: April 1998
Project cost: USD23 million
MANILA-CAVITE TOLL EXPRESSWAY PKG 1, PHILIPPINES
PROJECT IN QATAR
Qatar Primary Routes - Salwa Road Phase 1
Upgrading 81 km dual 4 lane highway linkingQatar-Saudi Border at Salwa to Doha
Total project cost: USD 265 million.
Completed: December 2008
LIGHT RAIL TRANSIT SYSTEMConstruction of total 29km elevated, underground and at
grade track including stations for the driverless automated
Light Rail Transit.
ELECTRIFIED DOUBLE TRACK Construction of total 182km of
Electrified Double Track Railway Lines
between two major cities
TRANSPORTATION
PUTRA LIGHT RAIL TRANSIT STATIONS, KUALA LUMPUR
Completed: 1999Value: USD 494.3 million
Project involved the construction of 29 km track way for Light Rail Transit System in Kuala Lumpur involving 22 km elevated track, 5 km underground tunnel and 2 km at-grade track.
Construction of 5 underground LRT stations, 17 above-ground and 2 at-grade stations throughout the LRT system.
Longest driverless automated LRT in the world.
Implemented in November 1994 and completed in June 1999.
Construction of 155 bridge crossings for the 182 km
electrified railway line linking Rawang to Ipoh.
Project Cost: USD 436 million.
31st March 2007
IPOH-RAWANG ELECTRIFIED DOUBLE TRACKING
NATIONAL SPORTS COMPLEXConstruction of National Stadium, aquatic centre and indoor stadium for the nation sport facilities.
KUALA LUMPUR INTERNATIONAL AIRPORT (KLIA)Construction of Satellite Building and ancillary works for the Malaysia’s largest airport.
BUILDINGS & FACILITIES
JSNACConstruction of Johor State New Administration Centre in Johor
MARDI Agriculture CentreConstruction of National Stadium, aquatic centre and indoor stadium for the nation sport facilities.
MINISTRY OF FINANCE II BUILDINGConstruction of Government Building for the Federal Government Administrative Centre in Putrajaya.
NATIONAL HEART INSTITUTEConstruction of new healthcare facilities for the extension of the National Heart Institute.
NATIONAL SPORTS COMPLEX, BUKIT JALIL, KUALA LUMPUR
Completed: June 1998Value: USD 263 million
100,000 capacity National Stadium (outdoor stadium), 3,700 seat National Aquatic Centre (swimming complex) and 16,000 seat Putra Stadium (indoor stadium).
Implemented in January 1994 and completed in July 1998 for the XVI Commonwealth Games.
COMMONWEALTH GAMES VILLAGE, BUKIT JALIL, KUALA LUMPUR
Completed: June 1998Value: USD 109 millionGross Floor Area: 198,774 m²
Construction of multi storey apartment blocks complete with recreational facilities.
1,500 units were built in total.
KUALA LUMPUR INTERNATIONAL AIRPORT, SATELLITE BUILDING, SEPANG
Completed: December 1998Value: USD 141 millionGross Floor Area: 148,000 m².
Design and construction of the satellite building and its ancillary works as part of the Kuala Lumpur International Airport Complex.
Project implementation in joint venture with international construction companies as consortium partners.
EAST MALAYSIA HOSPITALS
The planning, design, construction, equipping, commissioningand maintenance of six hospitals with a combined total of976 beds were delivered to the Ministry of Health Malaysia instages from 2002 till 2005. Five of the hospitals are located inthe state of Sabah in East Malaysia, namely Lahad Datu,Keningau, Kuala Penyu, Pitas and Kunak. One more hospital islocated in the state of Sarawak, also in East Malaysia, inSarikei.
Completed: 2004Value: USD 234 million
UNIVERSITY OF TECHNOLOGY PETRONAS (UTP) MOSQUE, TRONOH, PERAK
Completed: October 2005Value: USD 7.7 millionGross Floor Area: 5,659 m²
The construction and completion of thisuniquely designed ‘floating’ mosque atBandar Seri Iskandar, Perak has a capacityto accommodate 4,000 people.
The enclosed main prayer area is air-conditioned and can accommodate 1,000people. The covered prayer area,accommodating 3,000 people, which waspreviously ventilated naturally, has beenchanged into an air-conditioned system.
• Commenced: 10 September 2004• Completion: 6 November 2005• Value: USD90.5 million
Construction and completion of 64 units of 3-storey link home and sewerage pump, Danau Villa Link Home, Taman Desa, Kuala Lumpur.
DANAU VILLA LINK HOME, TAMAN DESA, KUALA LUMPUR
MINISTRY OF FINANCE BUILDING 2, PUTRAJAYA
Commenced: 4 December 2002Completed: 30 April 2007Value: USD 60 millionGross Floor Area: 67,108 m²
Design, construction and completion of office buildings to house agencies under the Ministry of Finance at the New Federal Government Administrative Centre in Putrajaya.
2 office blocks, 8 and 10-storey high with each housing two levels of basement car parks.
Scope of works include interior design works.
CASA DESA CONDOMINIUM, KUALA LUMPUR
Commenced: 11 July 2005Completed : 31 March 2008Value: USD 24 millionGross Floor Area: 9,794 m2
For the 410-unit Casa Desa Condominium, the contract package consists of substructure works and superstructure works.
Project involves construction of 7 blocks of condominium buildings including earthworks, bored piling and pile caps.
Project : Agriculture Exposition Centre (Phase 2) –
MARDI, Serdang
Commenced : 27 November 2007
Completed : 30 June 2008
Value : USD 64 million
Gross Floor Area: 25,000 m²
AGRICULTURE EXPOSITION CENTRE (PHASE 2)-MARDI, SERDANG
JOHOR STATE NEW ADMINISTRATIVE CENTRE (JSNAC), PHASE 1, JOHOR
Commenced: November 2005Completed: August 2008Value: USD 62 million
The development of the JSNAC on a 320-acre sitelocated at Bandar Nusajaya, 25 km from JohorBahru, Johor is divided into three precinctscomprising the Government precinct (273 acres), VIPresidences and Istana reserve (17 acres) andgovernment housing reserve (30 acres).
Phase 1 of this development is divided into five packages where three packages, has been awarded. Project involves the construction of office buildings for the new state administrative centre in Johor.
UEM GROUP NEW CORPORATE OFFICE, KUALA LUMPUR
Commenced: 1 June 2005Completed: December 2008Value: USD 45 million Gross Floor Area: 35,000 m²
This project involves the design and construction of a 29-storey office building with an 8-storey annex building at KL Sentral. The scope of works involves interior design.
PLUS HEADQUARTERS, SUBANG
Development of one block of 10-storey
office tower at Subang Toll, Petaling Jaya,
Selangor Darul Ehsan
Commenced : 15 January 2007
Completed : December 2008
Value : USD 29 million
STATE DEPARTMENT COMPLEX (JSNAC), NUSAJAYA
Commenced: November 2005Completed: February 2009Value: USD 63 million
NATIONAL HEART INSTITUTE, KUALA LUMPUR
Commenced: 5 September 2005Completed: March 2009Value: USD 64.6 millionGross Floor Area: 32,840 m²
Design, construction, supply and commissioning and maintenance of new healthcare facilities for the extension of the National Heart Institute.
This project is divided into four phases and worksentail the renovating and refurbishing of existingfacilities.
COLLEGE OF TECHNOLOGY (COT), DOHA, QATAR
Construction of 21 multidisciplinary buildings comprising classrooms, workshops/labs, cafeterias, recreation facilities, auditorium and administration buildings with a total area of 63,000 m2 and external infrastructure for campus area of 300,000 m2.
Project cost: USD 100 million.
Completed: October 2006
Project : 548 Units (5 Blocks) Apartment
Using Industrialised Building System (IBS) Method
Commenced : September 2006
Exp. Completion : March 2008
Value : USD 39 million
Gross Floor Area: 60,500 m²
GOVERNMENT APARTMENTS, PUTRAJAYA
Proposed Basement Structural Works for
Universal Studio
Commenced: March 2008
Completed: July 2008
Value: USD 4.5 million
Gross Floor Area: 65,800 m²
RESORTS WORLD AT SENTOSA, SINGAPORE
MC04-F1
ON-GOING PROJECTS
www.uembuilders.com
BANK KERJASAMA RAKYAT HEADQUARTERS, KUALA LUMPUR
Design, construction and completion of 2 office
towers (32 and 38-storeys), 1 block of 8-storey
annex comprises of car parks and 1 unit PPU
Commenced : 1 June 2009
Exp. Completion : December 2011
Value : USD 26 million
Gross Floor Area: 188,000 m²
PENANG SECOND BRIDGE
Project : Design, Construction and Completion of the Penang Second Bridge. Package 2 : Super-structure Works of Approach Spans. • Overall length - 24 km• Length over water - 17 km,• Main span : Length - 250 meters• Height clearance (above water) – 30 meters• Number of vehicle lanes – 2 + 1 for motorcycles (each
direction) Commenced : June 2009 Exp. Completion : March 2013 Value : USD 473 million
PHG’-S’GOR RAW WATER TRANSFER PROJECT
Pahang - Selangor Raw Water Transfer
Project Lot 1-1, Water Transfers
Tunnel & Related Works (2,260 Mld.)
Commenced : June 2009
Exp. Completion : May 2014
Value : USD 400 million
Length: 44.6km ; Diameter: 5.2m
1,765-acre Sushant Golf City Project in Lucknow, Uttar Pradesh
Project : Construction of various
building and engineering works at
Sushant Golf City, Lucknow U.P. India.
Commenced : 1 April 2008
Exp. Completion : February 2012
Value : USD 497 million
Total Development Area : 1,765 acre
Project : 4000 units Housing Project for the
National Housing Scheme, Brunei.
Commenced : 2 February 2010
Exp. Completion : February 2014
Value : USD 290 million
Total Development Area: 309 hectares
4000 UNITS HOUSING PROJECT, BRUNEI
NEW LCC TERMINAL AT KLIA, SEPANG
Project : Design, Construction and Completion,
Testing, Commissioning and Maintenance of Main
Terminal Building, Satellite Building, Sky Bridge
and Piers.
Commenced : 16 August 2010
Exp. Completion : April 2012
Value : USD 316 million
Thank You
This document is the property of United Engineers (Malaysia) Berhad. Neither the whole nor any part of this document may be reproduced, stored or transmitted in any forms or by any means without
written permission of United Engineers (Malaysia) Berhad.
This document is designed to provide information in relation to the subject matter covered for this presentation and should not be used for any other purpose. Whilst every care has been taken in its
preparation, no person should draw conclusions purely on the basis of the material contained herein. If assistance is required, reference should be made to the relevant professional of United Engineers
(Malaysia) Berhad.
A member of UEM Group
www.uembuilders.com