Page 1: UC Project - Town Hall Presentation 4-2-12 · » The decision to relocate the bookstore specifically took into consideration a number of factors ˃ Moving the bookstore from the east
Page 2: UC Project - Town Hall Presentation 4-2-12 · » The decision to relocate the bookstore specifically took into consideration a number of factors ˃ Moving the bookstore from the east

» Since SGA Approval in May 2011, the University Center Transformation Project contracted out for design and construction services.˃ Local firm WHR and national firm WTW are providing architectural design services 

for the project.  WHR employs a number of UH alumni, several of whom are working on this project.  WTW has been nationally recognized numerous times for their Student Union and University Center designs.

˃ Tellepsen, the construction firm, has been active in the Houston area for over 100 years.

» The UC Transformation Project has worked through a number of design options before deciding on one that decommissions the UC Underground and adds two additions—one featuring student organizations and other services, and one featuring a new ballroom, another large meeting room, and a 450‐seat theater.

The UC Transformation Project:A Brief Overview

Page 3: UC Project - Town Hall Presentation 4-2-12 · » The decision to relocate the bookstore specifically took into consideration a number of factors ˃ Moving the bookstore from the east

» The decision to relocate the bookstore specifically took into consideration a number of factors˃ Moving the bookstore from the east side to the west side will allow for a single unified 

loading dock, providing aesthetic and operational benefit to the University˃ The engergized ‘Cougar Boulevard’ will provide a  synergistic relationship between the 

New UC, the Library, and the Academic Core of Campus˃ Moving the bookstore will create a more robust multipurpose lounge space on the first 

floor of the building, greatly enhancing seating capacity and evening/weekend program options

˃ Saves considerable money due to only moving the bookstore once, and ensures the UC is able to maintain operation throughout the entire renovation process

» Preservation of the mural and the Arbor Statue have been paramount priorities throughout this process.

The UC Transformation Project:A Brief Overview

Page 4: UC Project - Town Hall Presentation 4-2-12 · » The decision to relocate the bookstore specifically took into consideration a number of factors ˃ Moving the bookstore from the east

» Key Dates˃ April 26, 2012 – University Center Transformation Project Ceremonial Groundbreaking – 10am, UC Front Lawn

˃ June 2012 – University Center Transformation Project Begins Construction

˃ December 2013 – First Phase of Transformed UC (including dining, the new bookstore, theater, and more) Complete

˃ December 2014  ‐ Second Phase of Transformed UC (including new meeting rooms, lounge space, Games Room, and more) Complete

˃ January 2015 – Grand Opening of The New UC

The UC Transformation Project:A Brief Overview

Page 5: UC Project - Town Hall Presentation 4-2-12 · » The decision to relocate the bookstore specifically took into consideration a number of factors ˃ Moving the bookstore from the east

The UC Transformation Project:Site and Location

Page 6: UC Project - Town Hall Presentation 4-2-12 · » The decision to relocate the bookstore specifically took into consideration a number of factors ˃ Moving the bookstore from the east

UH UC T R A N S F O R M A T I O N

View from southwest corner

Page 7: UC Project - Town Hall Presentation 4-2-12 · » The decision to relocate the bookstore specifically took into consideration a number of factors ˃ Moving the bookstore from the east

UH UC T R A N S F O R M A T I O N

View of south entry

Page 8: UC Project - Town Hall Presentation 4-2-12 · » The decision to relocate the bookstore specifically took into consideration a number of factors ˃ Moving the bookstore from the east

UH UC T R A N S F O R M A T I O N

View from south east

Page 9: UC Project - Town Hall Presentation 4-2-12 · » The decision to relocate the bookstore specifically took into consideration a number of factors ˃ Moving the bookstore from the east

UH UC T R A N S F O R M A T I O N

View of Cougar Lane looking south

Page 10: UC Project - Town Hall Presentation 4-2-12 · » The decision to relocate the bookstore specifically took into consideration a number of factors ˃ Moving the bookstore from the east

UH UC T R A N S F O R M A T I O N

View of west plaza

Page 11: UC Project - Town Hall Presentation 4-2-12 · » The decision to relocate the bookstore specifically took into consideration a number of factors ˃ Moving the bookstore from the east

UH UC T R A N S F O R M A T I O N

View from north_Option B

Page 12: UC Project - Town Hall Presentation 4-2-12 · » The decision to relocate the bookstore specifically took into consideration a number of factors ˃ Moving the bookstore from the east

UH UC T R A N S F O R M A T I O N

View from Melcher/CBB

Page 13: UC Project - Town Hall Presentation 4-2-12 · » The decision to relocate the bookstore specifically took into consideration a number of factors ˃ Moving the bookstore from the east

Overall Floor Plan – Level 2

Page 14: UC Project - Town Hall Presentation 4-2-12 · » The decision to relocate the bookstore specifically took into consideration a number of factors ˃ Moving the bookstore from the east

Overall Floor Plan – Level 2

SGA Offices

SGA Senate Chamber

Page 15: UC Project - Town Hall Presentation 4-2-12 · » The decision to relocate the bookstore specifically took into consideration a number of factors ˃ Moving the bookstore from the east

Overall Floor Plan – Level 1

Page 16: UC Project - Town Hall Presentation 4-2-12 · » The decision to relocate the bookstore specifically took into consideration a number of factors ˃ Moving the bookstore from the east

Overall Floor Plan – Level 1

104 Student Organization 

Carrels

Page 17: UC Project - Town Hall Presentation 4-2-12 · » The decision to relocate the bookstore specifically took into consideration a number of factors ˃ Moving the bookstore from the east

Overall Floor Plan – Level 1

Page 18: UC Project - Town Hall Presentation 4-2-12 · » The decision to relocate the bookstore specifically took into consideration a number of factors ˃ Moving the bookstore from the east

Overall Floor Plan – Level 0

Mural Location –Lounge Within Bookstore

Page 19: UC Project - Town Hall Presentation 4-2-12 · » The decision to relocate the bookstore specifically took into consideration a number of factors ˃ Moving the bookstore from the east

UH UC T R A N S F O R M A T I O N

Page 20: UC Project - Town Hall Presentation 4-2-12 · » The decision to relocate the bookstore specifically took into consideration a number of factors ˃ Moving the bookstore from the east

UH UC T R A N S F O R M A T I O N

Page 21: UC Project - Town Hall Presentation 4-2-12 · » The decision to relocate the bookstore specifically took into consideration a number of factors ˃ Moving the bookstore from the east

UH UC T R A N S F O R M A T I O N

Page 22: UC Project - Town Hall Presentation 4-2-12 · » The decision to relocate the bookstore specifically took into consideration a number of factors ˃ Moving the bookstore from the east

Questions &Answers