relocate roadside ditch
TRANSCRIPT
PLAN1:250
N
EXISTING 43m-1800Ø CSP CULVERT #18
N
PROPOSED 9m-600Ø
HDPE CULVERT
PROPOSED 10m-600Ø
HDPE CULVERT
PROPOSED ALIGNMENT ℄
INSTALL 60m 690 HIGH
CONCRETE ROADSIDE BARRIER
PROPOSED 1.4m HIGH SAFETY
HANDRAIL ON TOP OF SLOPE
RELOCATE ROADSIDE DITCH
PROTECT NEW SLOPE WITH
EROSION CONTROL MATTING
EXISTING AIRPORT ⅊
EXISTING ESOWISTA
INDIAN RESERVE ⅊
PLACE CLASS 10kg RIP RAP-300mm
THICK ALONG TOE OF FILL C/W
NONWOVEN GEOTEXTILE
PROPOSED 200Ø
HDPE SWALE DRAIN
RELOCATE ROADSIDE DITCH
KEY PLANN.T.S.
W-3.1
OF
Sheet/
Description/Description Date/Date
Drawn by/Dessine par
Consultant Signature Only
Designed by/Concept par
Drawing title/Titre du dessin
Client/client
Project title/Titre du projet
Revision/Revision
FeuilleLa Révisionno.
Project No./No. duprojet
Revision no./
Parks Canada
Agency
L'Agence Parcs
Canada
PCA Project Manager/Technical AuthorityAdministrateur de Projets APC
-
2
4
W-3.1
PCA #1522
JACKIE HICKS
JACKIE TAN / 2017-02
DON CHALMERS / 2016-11
SITE C - FILL SLOPE
PLAN (CULVERT #18)
HIGHWAY 4 STA H17+060
ʔapsciik tasii (Ups-cheek
ta-shee)
“Going in the right direction on the
trail”
TRAIL DESIGN
TOFINO
PACIFIC RIM
ʔapsciik tasii
(Ups-cheek ta-shee)
“Going in the right
direction on the trail”
NATIONAL PARK RESERVE
ELE
VATION
9
10
11
12
13
14
15
16
17
18
19
20
21
22
9
10
11
12
13
14
15
16
17
18
19
20
21
22
5+040 5+050 5+060 5+070 0+010 0+020 0+030 0+040 0+050 0+060 0+070 0+080 0+090 0+100 0+110 0+1200+120
PROFILE1:250H & 1:25V
N
OG (SURVEY) AT TRAIL CENTERLINE
PROPOSED PROFILE OF FINISHED
TOP OF ASPHALT PAVEMENT
EXISTING HIGHWAY EOP
PROPOSED 9m-600Ø
HDPE CULVERT
PROPOSED 10m-600Ø
HDPE CULVERT
EXISTING 43m-1800Ø
CSP CULVERT #18
LOCAL STATIONING: 0+000
PROPOSED 200Ø
SWALE DRAIN KEY PLANN.T.S.
W-3.2
OF
Sheet/
Description/Description Date/Date
Drawn by/Dessine par
Consultant Signature Only
Designed by/Concept par
Drawing title/Titre du dessin
Client/client
Project title/Titre du projet
Revision/Revision
FeuilleLa Révisionno.
Project No./No. duprojet
Revision no./
Parks Canada
Agency
L'Agence Parcs
Canada
PCA Project Manager/Technical AuthorityAdministrateur de Projets APC
-
1
4
W-3.2
PCA #1522
JACKIE HICKS
JACKIE TAN / 2017-02
DON CHALMERS / 2016-11
SITE C - FILL SLOPE
PROFILE
ʔapsciik tasii (Ups-cheek
ta-shee)
“Going in the right direction on the
trail”
TRAIL DESIGN
TOFINO
PACIFIC RIM
ʔapsciik tasii
(Ups-cheek ta-shee)
“Going in the right
direction on the trail”
NATIONAL PARK RESERVE
0+010
18.73
13.46
0+020
0.40
TR
AIL E
P
0.40
TR
AIL E
P
0.40
0.20
0.30m OF
10kg RIPRAP
MIN. 300mm THICK
DRAIN ROCKS
N
SECTIONS1:100
OG (SURVEY), TYP.
PROPOSED 3.0m TRAIL, TYP.
PROPOSED FILL, TYP.
TYPICAL FILL SECTION1:25
PROPOSED 1.4m HIGH
SAFETY HANDRAIL
PROPOSED TRAIL
ORIGINAL GROUND
PROTECT EXPOSED SLOPES WITH
EROSION CONTROL MATTING
PROTECT TOE OF SLOPE
WITH RIP RAP IN AREAS
WITH FLOWING WATER
PROPOSED BARRIER, TYP.
REMOVE ORGANICS
1
2
KEY IN SLOPE.
SUITABLE EXCAVATED MATERIAL
TO BE USED AS EMBANKMENT FILL
RIP RAP
300mm SUBBASE
100mmØ PERF PVC DRAINAGE PIPE C/W GEOTEXTILE WRAP
100mm BASE
HIGH SURVIVABILITY
NON-WOVEN GEOTEXTILE
1
2 2
1
KEY PLANN.T.S.
W-3.3
OF
Sheet/
Description/Description Date/Date
Drawn by/Dessine par
Consultant Signature Only
Designed by/Concept par
Drawing title/Titre du dessin
Client/client
Project title/Titre du projet
Revision/Revision
FeuilleLa Révisionno.
Project No./No. duprojet
Revision no./
Parks Canada
Agency
L'Agence Parcs
Canada
PCA Project Manager/Technical AuthorityAdministrateur de Projets APC
-
1
4
W-3.3
PCA #1522
JACKIE HICKS
JACKIE TAN / 2017-02
DON CHALMERS / 2016-11
SITE C - FILL SLOPE
SECTIONS
ʔapsciik tasii (Ups-cheek
ta-shee)
“Going in the right direction on the
trail”
TRAIL DESIGN
TOFINO
PACIFIC RIM
ʔapsciik tasii
(Ups-cheek ta-shee)
“Going in the right
direction on the trail”
NATIONAL PARK RESERVE
12.92
13.81
16.45
11.87
0+030
0+034
0+040
0+050
0+060
0+070
N
SECTIONS1:100
OG (SURVEY), TYP.
EXISTING 43m-1800Ø
CSP CULVERT #18
PROPOSED 3.0m TRAIL, TYP.
PROPOSED FILL, TYP.
PROPOSED 1.4m HIGH RAILING, TYP.
PROPOSED FILL SLOPE, TYP.
PROPOSED BARRIER, TYP.
KEY PLANN.T.S.
W-3.4
OF
Sheet/
Description/Description Date/Date
Drawn by/Dessine par
Consultant Signature Only
Designed by/Concept par
Drawing title/Titre du dessin
Client/client
Project title/Titre du projet
Revision/Revision
FeuilleLa Révisionno.
Project No./No. duprojet
Revision no./
Parks Canada
Agency
L'Agence Parcs
Canada
PCA Project Manager/Technical AuthorityAdministrateur de Projets APC
-
1
4
W-3.4
PCA #1522
JACKIE HICKS
JACKIE TAN / 2017-02
DON CHALMERS / 2016-11
SITE C - FILL SLOPE
SECTIONS
ʔapsciik tasii (Ups-cheek
ta-shee)
“Going in the right direction on the
trail”
TRAIL DESIGN
TOFINO
PACIFIC RIM
ʔapsciik tasii
(Ups-cheek ta-shee)
“Going in the right
direction on the trail”
NATIONAL PARK RESERVE