ua9 layout on sps
DESCRIPTION
UA9 layout on SPS. Gianluca Cavoto INFN Roma Crystal collimation workshop CERN 25/27 Oct 2010. UA9 @ SPS. Circumference : 6.9 km. UA9 collimation region. Data-taking during dedicated M achine D evelopment days with SPS beam in coast mode (~5 in a year). Collimation region. - PowerPoint PPT PresentationTRANSCRIPT
UA9 layout on SPS
Gianluca CavotoINFN Roma
Crystal collimation workshop CERN
25/27 Oct 2010
G.Cavoto 2
UA9 @ SPS
Circumference : 6.9 km UA9 collimation region
Oct 25th 2010
Data-taking during dedicated Machine Development days with SPS beam in coast mode (~5 in a year).
G.Cavoto 3
Collimation region
Oct 25th 2010
Protons hitting the crystal
✖
Intercepted by LHC collimator
Imaged byMedipix
Absorbed by secondary collimator(TAL)
BLM Cerenkov
BLM Scint
BLM Scint
65 m
Inelastic interaction of protons in the crystal
BLM GEM Deflected beam
G.Cavoto 4
Out of collimation region
Second TAL (TAL2 Al scatterer)
Oct 25th 2010
Scatterer + BLM (scint and Cerenkov) in highly dispersive regionMeasure the effect of inelastic and quasi elastic [diffractive] events
G.Cavoto 5
IHEP tank
Oct 25th 2010
IHEP gon.
Scint B & LCrystal 3 and 4
IHEP goniomenter
GEM1
G.Cavoto 6
Crystal in IHEP tank
Oct 25th 2010
Quasi mosaic crystal Strip crystal
Crystal 3Crystal 4
7
Ex-RD22 CERN tank
Oct 25th 2010
Scint C
Two goniometer (crystal 1 and 2)One W scattererOne Cerekov detector
G.Cavoto
GEM2
G.Cavoto 8
LHC collimator (phase 2)
• Instrumented with LHC-type BLM
Oct 25th 2010
G.Cavoto 9
Roman Pot 1
• Instrumented with Medipix on both horizontal pot
Oct 25th 2010
Online!
G.Cavoto 10
Roman pot 2
• Close to TAL, better place to see channeledbeam
• No detectors yet• 2 H and 2 V pots for
Medipix
• Relevant to measurechanneled beam direction (from centroid)and flux of proton of channeledbeam
Oct 25th 2010
G.Cavoto 11
TAL absorber
Oct 25th 2010
Monitored with scintillator (out of vacuum)And Cerenkov (on the W absorber)
G.Cavoto 12
TAL2 in missing magnet half-cell
Oct 25th 2010
Al scraper/scatterer
G.Cavoto 13
Alignment procedure
Crystal and all UA9 movable devices are aligned during each fill.
Now standard and fast procedure to find channeling configuration and collimation.
Oct 25th 2010
LHC collimation alignment
Rate increase: stop!
Several secondary channeling position
G.Cavoto 14
Summary
• UA9 layout is now well established• Need to instrument RP2 with 4 Medipix• Need to add our BLM scint close to SPS collimator
• Hardware and DAQ are working– No big failure but keep on eye on radiation
damage of Medipix
• Many more details in the following talks
Oct 25th 2010
G.Cavoto 15Oct 25th 2010