typsa roads experience(rodoanel) ring road | 2012 - 2013 two sections of toll motorway (9 and 10 km...

38
TYPSA Roads experience 1. TRANSPORT studies and designs for 24.666 km construction supervision for 15.866 km

Upload: others

Post on 25-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

TYPSA Roads experience

1. TRANSPORT

studies and designs for 24.666 km construction supervision for 15.866 km

Page 2: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

1. TRANSPORT

studies and designs for 24.666 km construction supervision for 15.866 km

Studies andPlanning

Master plans

Feasibility studies

Environmental and mitigation studies

Social impact and public consultation

Economic and financial investment studies

PPP and concession analysis

Design andTender Support Services

Program and project management

Schematic / Conceptual / Preliminary designs

Final / Detailed designs

Preparation of tender documentation

Tender and contract support

Inspection andInfrastructure

Consulting engineering and inspection

Health and safety coordination

Construction project management

Maintenance and operation management

Roads

Page 3: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

I-15 Express Lanes ProjectSkanska-Ames JV (Riverside County Transportation Commission RCTC)

Detailed design | 2017 -2019

▪ D&B project. The project will improve traffic capacity on I-15 in Riverside County between Cajalco Road and State Route 60 (SR-60). Lead designer executing the final design for

11 bridges and freeway median widenings. Adding two tolled express lanes in each direction for a distance of 14.6 miles (23.5 km).

▪ Added Scope: D&B a new direct express lane connection form the SR91 freeway to I-15 freeway express lanes (including three additional ramp flyover bridges).

▪ Technical tasks: roadway geometrics, on/off-site drainage, maintenance of traffic, lighting, landscaping, environmental compliance, geotechnics, utilities, ands signing & marking.

▪ Investment budget: USD 550 M.

Riverside, California, USA

Transport – Roads

Page 4: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

SR-202L, South Mountain Freeway P3Connect 202 Partners (Fluor, Granite y Ames) / Arizona Department of Transportation (ADOT)

Detailed design | 2016 -2017

▪ This is the largest, most complex construction project in ADOT’s history.

▪ This fast-tracked P3 project includes the addition of a new 22-mile urban freeway to the regional freeway system, one HOV-managed lane (44 lane-miles) and three GPLs

(132 lane-miles) in each direction. Construction involves a section of I-10 to be built under significant live traffic conditions.

▪ Main tasks: managing project-wide efforts for all structures, environmental compliance, survey and utility locating activities (environmental activities are still active).

▪ Investment budget: USD 920 M.

Phoenix, Arizona, USA

Transport – Roads

Page 5: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

Interchange Highway l-10 with SR-303LArizona Department of Transportation (ADOT)

Detailed design (Phases 1 and 2) | 2009 - 2016

▪ Is the largest freeway to freeway Interchange in the state of Arizona. It is Arizona’s only five-level interchange which included fully-directional ramps.

▪ The Interchange is the anchor for the 40-mile Loop 303 and its completion opens a new corridor for West Valley economic development.

▪ Main tasks: Lead Designer for the Final Design for both phases.

▪ Investment budget: USD 233 M.

▪ Awards:

- Phase I: Grand Award American Council of Engineering Companies of Arizona (ACEC AZ); Award for New Highway Projects over USD 50 million AGC Arizona Chapter.

- Phase II: Grand Award American Council of Engineering Companies of Arizona (ACEC AZ); Best Project 2018 Engineering News Record (ENR) Southwest Region;

Partnering Excellence Award 2017 ADOT (Arizona Department of Transportation).

Maricopa County, Arizona, USA

Transport – Roads

Page 6: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

SR-303L, Happy Valley Road to Lake Pleasant ParkwayArizona Department of Transportation (ADOT)

Detailed design | 2010 - 2011

▪ Lead designer prime consultant (urban freeway design, structures, traffic, drainage, utility coordination & relocations, surveying) for the final design and environmental

compliance.

▪ New 7 miles freeway through native Upland Sonoran Desert.

▪ Traffic Interchanges (TIs) with five new overpass/underpass bridges, 12 new bridges over canals, rivers and desert washes, a series of complex drainage channels, basins, etc.

▪ 3.5 miles of new freeway with municipal utility design/relocations.

▪ USD 111 M investment.

▪ Awards: - Best project of the year 2011 in the category of transports for the Southwest granted by McGraw-Hill/ENR.

- “Excellence in engineering 2011” awarded by the American Association of Engineering Companies.

Arizona, USA

Transport – Roads

Page 7: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

SR-202L / US-60 “SuperRedTan” Traffic InterchangeADOT (Arizona Department of Transportation)

Detailed design | 2014 - 2016

▪ This multi-directional SR-202L/US-60 Interchange is the second largest freeway to freeway Interchange in the state of Arizona.

▪ 3-level, multi-directional TI, connecting three freeway: Superstition(US-60), Red mountain (SR-202L) and sanTan (SR-202L).

▪ It involved widening 3 miles and reconstructing 0.5 mile of US-60, constructing one mile of 6-lane freeway for the SR-202L, designing 12 bridges, etc.

▪ Prime Consultant: Geometrics & roadway, traffic, drainage, structures, survey & mapping, utility relocation.

▪ Investment budget: USD 200 M.

Arizona, USA

Transport – Roads

Page 8: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

Interstate I-69 in IndianaIndiana Department of Transportation / Isolux Corsan USA

Final design and construction engineering services | 2014 - 2016

▪ State route upgraded to full interstate standard with 3+3 and 2+2 lanes in each direction, grade-separated interchanges and fully controlled access.

▪ Total length: 34 km; 30 bridges.

▪ Availability payment concession near Bloomington (Indiana).

▪ Total construction cost: USD 325 M.

Indiana, USA

Transport – Roads

Page 9: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

Prosperity Highways (Autopistas para la Prosperidad)Agencia Nacional de Infraestructuras de Colombia – ANI

Studies and technical structuring road concessions as well as additional risk mitigation studies | 2012 - 2014

▪ Most important project in the country’s history.

▪ 900 km construction of new roads.

▪ 1,270 km operation and maintenance.

▪ More than100 tunnels (90 km) and more than 600 viaducts (60 km).

▪ Complex slope stability works.

▪ USD 6,700 M budget.

Medellín, Colombia

Transport – Roads

Page 10: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

Fourth Bridge over the Panama CanalDragados, S.A.

Tender design | 2016 - 2017

▪ Complex road system (total estimated length: 34 km approx.) including two interchanges and the cablestayed bridge of 510 m of main light. Bridge board: 51 m wide (road and

L3 metro).

▪ Bidders Maximum Technical Score.

▪ Towers of the pylons: 185 m high. Board with respect to level reference tide: 75 m of height. Access viaducts: 3.3 km in length.

▪ Total period of execution: 56 months. Useful life of the structure: 125 years.

▪ Investment budget: USD 1,812 M.

Panama city ,Panama

Transport – Roads

Page 11: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

Northern Transitional Highway (CLN) in El SalvadorFomilenio – El Salvador

Construction / rehabilitation management and supervisión | 2008 - 2012

▪ 290 km highway connecting northern El Salvador with the rest of the country.

▪ 20 construction and supervision contracts signed by the contracting entity.

▪ Two bridges over the Lempa River with post-tensioned concrete decks in 60 m spans.

▪ Investment budget: USD 250 M.

El Salvador, Central America

Transport – Roads

Page 12: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

Dominica East Coast RoadsMinistry of Environment, Climate Resilience, Disaster Management & Urban Renewal (Commonwealth of Dominica)

Detailed design and tender documents | 2018 - 2019

▪ Rehabilitation/Reconstruction of four road segments totaling 43 km, improving their resilience against natural disasters.

▪ 7 new bridges, 20 new major box culverts, 34 new retaining walls.

▪ Global improvement of the drainage system, including 250 new culverts.

▪ Road widening, pavement rehabilitation, road safety measures.

▪ Slopes stabilization and bioengineering.

▪ Investment budget: USD 60 M.

Dominica, Central America

Transport – Roads

Page 13: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

South Panamerican ExpresswayOdebrecht (Rutas Nuevas de Lima concession)

Feasibility Study,Preliminary design and detailed design | 2013 - 2017

▪ 54.4 km of urban highway included in the routes of Lima concession.

▪ Design for the remodelling of 5 high-capacity urban interchanges.

▪ Design of the widening and/or remodelling of carriageways and slip roads. Important traffic study

▪ Refurbishment and design of new bridges, viaducts, new urban tunnel (800 m), walls, pedestrian footbridges, new and rehabilitated pavements and signing .

▪ USD 200 M investment.

Lima, Peru

Transport – Roads

Page 14: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

Urban highway in Lima. Línea Amarilla (1/2)OAS (Brazil) / Concessionaire LAMSAC (Invepar, Brazil / VINCI Highways, France)

Detailed design and technical assistance on site | 2010-2017

▪ The Linea Amarilla urban highway links the southern area of Lima (Peru) with the district of El Callao, crossing the center and historic center of the city. The performance

consists of:

• Construction of 10 km approx. of road system in urban environment (highway of 2 lanes in each direction and service roads).

• Construction of a tunnel of 1,600 m approx. under the Rímac river.

• Construction of 11 viaducts (mixed structures and concrete structures), some of them with spans of more than 100 m.

• Construction of 4 toll areas.

Lima, Peru

Transport – Roads

Page 15: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

Urban highway in Lima. Línea Amarilla (2/2)OAS (Brazil) / Concessionaire LAMSAC (Invepar, Brazil / VINCI Highways, France)

Detailed design and technical assistance on site | 2010-2018

▪ Within these works is a tunnel of approximately 1,600 m under the bed of the Rímac River, with unique structures of great technical relevance, such as the transfer of cargo to

the Trujillo bridge (historic bridge of the seventeenth century), which allowed the execution of the tunnel under this existing structure.

▪ For the load transfer of the Trujillo bridge or "Puente de Piedra", 288 micropiles of 26 m depth were built in the Rímac channel and 35 hydraulic jacks of 400 t capacity were

used each to properly transfer the load of the bridge to the micropiles and the terrain.

▪ Investment budget: USD 500 M.

▪ Ground Engineering Awards 2019. Winner International Project of the Year.

Lima, Peru

Transport – Roads

Page 16: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

Americo Vespucio Norte Motorway. Stretch 6 enhancementVespucio Norte Express, S.A. Concessionaire

Detailed design | 2017 - 2019

▪ Americo Vespucio Norte (AVN) Route 40:

• Widening adding a 4th lane by each carriageway from Route 68 to Route 78 Interchanges (5.5 km length).

• It is also included Services Lanes and two new pedestrian bridges.

• Route 68 Interchange capacity improvement, including 10 new structures; Route 78 Interchange capacity improvement, including 3 new structures.

• Avenida Santa Elena Interchange improvement.

• New Interchange between Avenida El Rosal and the Route 78 Motorway.

▪ Investment budget: EUR 80 M.

Santiago de Chile, Chile

Transport – Roads

Page 17: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

National routes 2 and 7 in ParaguayConsorcio Rutas del Este (Concessionaire – Sacyr S.A., Mota- Engil, Ochoa)

Final design | 2017 - 2018

▪ Lead designer of this D&B.

▪ Total length 142 km; Project speed: 100 km/h.

▪ 21 viaducts, 4 overpasses.

▪ 120 km of existing carriageway extension, including one-side widening and two sides widening.

▪ 5 new construction sections to divert traffic out of crossed towns: Ypacaraí, Caacupé, Itacurubí, San José and Coronel Oviedo.

▪ 4 Interchanges at Ypacaraí, Caacupé, Coronel Oviedo and Caaguazú , 2 service areas (10 km of service roads in Caaguazú).

▪ Investment budget: USD 245 M.

Paraguay

Transport – Roads

Page 18: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

Local roads in ParaguayMinistry of Public Roads and Transport

Feasibility study, environmental impact assessment and detailed design | 2017-2018

▪ The MoPWT launched three packages of local roads. The Package 3 was the largest, with a total length of 1,000 km.

▪ Roads located in the Departments of Concepcion, San Pedro Icuamandiyú, Canindeyú, Caazapá and Paraguarí.

▪ 20 feasibilities studies; 5 environmental impact studies, indigenous communities studies, cost-benefit studies (HDM-4), 5 public audiences/consultation and 31 detailed design.

▪ 61 bridges.

▪ 606 unicellular and multicellular box culverts and 471 pipe/circular culvert.

▪ Investment budget: USD 400.

Paraguay

Transport – Roads

Page 19: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

Sao Paulo RingroadDERSA (Deselvolvimiento Rodoviário S/A, Sao Paulo State Government)

Preliminary design, final design and construction engineering and inspection for all the viaducts and bridges in lots 14 and 15 of the São Paulo Mario Covas

(Rodoanel) ring road | 2012 - 2013

▪ Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section.

▪ More than 40 bridges and viaducts.

▪ Two tunnels (270 m and 1,130 m long).

▪ Investment budget: USD 1,250 M.

São Paulo, Brazil

Transport – Roads

Page 20: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

Modjo - Hawasa highway project (Batu (Zeway) - Arsi Negele section)SBI INTERNATIONAL HOLDING AG

Detailed design | 2018 - 2019

▪ Design a new 57.1 km 4-lane dual carriageway highway from Batu (Zeway) to Arsi Negele.

▪ Two bridges for crossing Bulbula and Hora Kelo rivers and some crossing structures: 13 vehicular overpasses, 17 pedestrian overpasses and some cattle underpasses.

▪ Two interchanges.

▪ Conducting hydrologic and hydraulic analysis to obtain available information so that flood plains and probable flood plain impacts can be identified.

▪ Environmental and Social Management Plan (ESMP).

▪ Updated Resettlement Action Plan (RAP)

▪ Investment budget: USD 135.5 M.

Zeway (Oromia Region), Ethiopia, Africa

Transport – Roads

Page 21: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

Nekemte-Bure Road UpgradingEthiopian Roads Authority

Detailed design | 2016 - 2019

▪ The Detailed Design is developed within an Output and Performance Road Contract (OPRC).

▪ 86.1 km of gravel road classified as Link road B32 as per ERA classification with variable width (5.5 – 7.0 m).

▪ Design of the roadway meeting the requirements of ERA to DC5 paved road standards.

▪ New layout running through the existing road and optimized alignments according to the necessary requirements of a DC5 paved road.

▪ 18 urban areas crossed by the road.

▪ 6 existing bridges identified along the trace of the road. In addition, a major drainage structure is required to be replaced by a new bridge.

Nekemte-Andhode, Ethiopia, Africa

Transport – Roads

Page 22: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

Access road to the International Airport of AntananarivoEuropean Union Delegation in Madagascar

Preliminary design | 2014 - 2016

▪ Current traffic jam problems to access to Ivato International Airport.

▪ 4 alternatives were considered for the design of a new route.

▪ The selected alternative: 13.70 km of a new suburban road; 100 km/h as maximum speed; 8 m 35 s of journey time; 1.82 km along urban areas; 7 bridges.

▪ Investment budget: EUR 38.60 M.

Antananarivo, Madagascar, Africa

Transport – Roads

Page 23: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

Highways on Lines 4, 5 and 6 of the Riyadh Metro ProjectFAST Consortium (FCC, SAMSUNG, STRUCKTON, FREYSSINET, ALSTOM)

Conceptual, preliminary and detailed design | 2014 - 2018

▪ D&B Contract. 64.7 km length, 30 km elevated, 9 km at-grade, 25.7 km underground, 25 stations, 2 depots, 4 park&ride.

▪ DJV: WS ATKINS & TYPSA.

▪ Among others, TYPSA carried out: design of highways, landscaping, utilities (temporary and permanent), traffic studies and coordination of all the disciplines involved in the

project (project-wide)

▪ Investment budget: USD 8.0 bn.

Riyadh, Kingdom of Saudi Arabia

Transport – Roads

Page 24: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

Salerno - Reggio Calabria MotorwayAnas S.p.A.

Preliminary and detailed design | 2010-2011

▪ 12 km upgrading motorway, 2 interchanges, 7 viaducts and 5 overpasses.

▪ 1 thee-line tunnel 3.2 km long (New Pizzo tunnel) and 2 cut & cover tunnels 0.5 km length each.

▪ Pizzo Viaduct disassembly.

▪ Total construction cost: USD 737 M.

Italy

Transport – Roads

Page 25: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

Engineering design services for Dublin BusConnects. Project DAnas S.p.A.

Detailed design | 2019 – on going

▪ BusConnects is a major investment programme to improve public transport. It aims to overhaul the current bus system in Dublin through a 10 year programme of integrated

actions to deliver a more efficient, reliable and better bus system for more people.

▪ The project aims to provide continuous bus along 4 corridors in Dublin. Optimum road layout intended includes footpath, segregated cycle track, dedicated bus lane and

general traffic lane in each direction. Traffic signals management and rearrangement of problematic junctions are also studied to facilitate reliable Bus service, along with some

Urban Realm developments and cycle facilities along the corridors.

▪ TYPSA & ROD (Roughan & O'Donovan) design the following corridors:

• CBC3 - Ballymun to City Centre: 6 km

• CBC4 - Finglas to Phibsborough: 4 km

• CBC11 - Kimmage to City Centre: 4 km

• CBC16 - Ringsend to City centre: 5 km

▪ Investment: EUR 100 M.

Dublin, Ireland

Transport – Roads

Page 26: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

E-6 tendering processes in NorwayNye Veier / FCC & ITINERA

Tender designs | 2018 – on going

▪ E-6 Kvithammer, Norway (Client: Nye Veier / Contractor: FCC)

• Report and analysis of civil works including: road design, structures, tunnel design, ground treatments, drainage, landscaping, signing & signalling, landscaping. Collaboration

in zoning plan process assessment, tender documents including performance documents, risk assessment, work schedules and organization plans.

• Estimated CAPEX: $ 447 M.

▪ E-6 Ranheim – Værnes, Norway (Client: Nye Veier / Contractor: FCC & ITINERA)

• Report and analysis of civil works including: road design, structures, tunnel design, ground treatments, drainage, landscaping, signing & signalling. Collaboration in tender

documents including performance documents, risk assessment, work schedules and organization plans.

• Estimated CAPEX: $ 470 M.

Norway

Transport – Roads

Page 27: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

velocidad de oscilación en el entorno de la excavación en un plano vertical de corte

South A-31 Motorway, ValdatiscoAutopista Brescia Verona Vicenza Padova

Preliminary and detailed design, environmental impact assessment and tender documentation | 2000 - 2004

▪ 54 km long motorway.

▪ TYPSA is part of a large consortium responsible for the design of 3 tunnels in cut and cover of 360 m, 330 m and 130 m each.

▪ Investment budget: EUR 1200 M.

Italy

Transport – Roads

Page 28: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

AP-6 Highway. Toll Section: Valle de los Caídos Bypass - San RafaelCastellana de Autopistas S.A.C.E. (Abertis Group)

Preliminary design, final design and construction supervision | 2003 - 2007

▪ New third carriageway 13 km long and updating of the current carriageways.

▪ New third thee-line tunnel 3.2 km long connecting to the two existing tunnels thanks to 14 escape galleries (2,300 m).

▪ Updating (utilities and installations) of 2 existing tunnels (one of them operating in reversible system).

▪ USD 180 M Investment.

▪ Spanish Institution of Civil Engineers in Madrid Awards 2010. Special Mention.

Madrid - Segovia, Spain

Transport – Roads

Page 29: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

Underground section of the M-30 RingroadMadrid City Council

Detailed design | 2003 – 2004

▪ Total length of the underground section: 14.6 km.

▪ Urban tunnel, construction method: EPB type TBM.

▪ Excavation with a tunnel-boring machine of 15.12 m external diameter. wWrld record in 2003

▪ Investment budget: EUR 1,279 M.

▪ FIDIC Outstanding Project of the Year Award 2014.

Madrid, Spain

Transport – Roads

Page 30: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

New M-61 Ringroad (North closure of the M-50)MINTRA (Comunidad de Madrid Road Directorate)

Feasibility study and preliminary design | 2007 - 2008

▪ Ring road 34 km long.

▪ Project speed = 100 km/h

▪ A tunnel (Túnel de El Pardo) of two tubes of 11 km long, 15 m in exterior diameter excavated with TBM system.

▪ 7 interchanges.

▪ Environmental impact assessment (main environmental constrictions).

▪ Investment budget: EUR 2,400 M.

Madrid, Spain

2. Practice areas

Transport – Roads

Page 31: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

AP-46 Toll Motorway Alto de las Pedrizas - MálagaSacyr Vallehermoso S.A. (Concessionaire)

Tender and final design | 2006-2008

▪ Total length 28 km.

▪ Project speed: 120 km/h.

▪ 17 viaducts; 6 overpasses and 9 underpasses.

▪ 6 tunnels.

▪ 2 interchanges, 2 rest areas and 1 toll area.

▪ Investment budget: USD 395 M.

Málaga, Spain

Transport – Roads

Page 32: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

A-63 Motorway, sections: Oviedo - La Espina and Salas - La EspinaSpanish Ministry of Public Works

Preliminary and detailed design | 2003 - 2006

▪ Total length 12.9 km.

▪ 3 interchanges.

▪ 8 viaducts.

▪ Investment budget: USD 130 M.

Asturias, Spain

Transport – Roads

Page 33: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

Cartagena-Vera Toll MotorwaySpanish Ministry of Public Works

Feasibility study, environmental impact assessment and preliminary design | 2000-2004

▪ Total length: 116 km.

▪ 4 tunnels and 200 bridges.

▪ 14 interchanges.

▪ 9 toll areas; 9 service areas.

▪ USD 730 M investment.

Murcia and Almería, Spain

Transport – Roads

Page 34: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

New bridge over the Miño River. Connections N-VI, LU-612 and N-543Spanish Ministry of Public Works

Preliminary and detailed design| 2007 - 2009

▪ Bridge type bow – string arch with steel – concrete composite deck.

▪ Total length: 195 m and main span: 95 m.

▪ A tinterchange with N-Vi road with upper roundabout and two-level roundabouts.

▪ Investment budget: USD 34 M.

▪ Potencia Outstanding Project of the Year Award 2009.

Lugo, Galicia, Spain

Transport – Roads

Page 35: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

Aragón Motorway (A-2) from km 5.9 to km 62.0; Section: Madrid – R-2.Autovía de Aragón (OHL Concessions)

Detailed design, construction supervision and O&M (supporting PPP management) | 2007-2009

▪ 56 km partly urban motorway, 82 km of service roads (31 km new) and 27 km of new third lane each carriageway.

▪ 24 interchanges (16 remodelled).

▪ 21 new bridges and 44 rehabilitations.

▪ Reinforcement of pavement (including concrete slabs) and renewal and upgrading of all road elements and its facilities.

▪ New toll O&M Centre.

▪ USD 195 M construction budget.

Madrid and Guadalajara, Spain

Transport – Roads

Page 36: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

Rande Bridge. AP-9 capacity expansionAUDASA

Detailed design, construction supervision and technical support | 2015 - 2018

▪ Motorway widening adding a third lane by each carriageway in the AP-9, including the Rande Bridge. Length: 6 km.

▪ Modification of “O Morrazo” Interchange, to enhance the capacity and adjust to the new third lanes.

▪ The Rande Bridge is 706 m total length with a 400 m main span.

▪ First cable-stayed bridge to be widened in the world.

▪ Investment budget: EUR 140 M.

▪ Awards: - Acueducto de Segovia Award 2018. Infrastructure and Environment.

- The International Association for Bridge and Structural Engineering (IABSE) Awards 2019: Finalist 2019

- FIDIC 2019 Outstandig Project of the Year.

Pontevedra, Galicia, Spain

Transport – Roads

Page 37: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

Nokian Tyres Technology CenterNokian Tyres plc (Finland)

Concept design, Preliminary design and detailed design | 2016 - 2017

▪ Technological Center of 250 ha for the testing of tires of the finnish company Nokian Tyres.

▪ 9 tracks for testing: high speed, dry grip, wet grip, braking (4 different surfaces), longitudinal aquaplaning, lateral aquaplaning, noise, wear, comfort. Approximate total length of

the test tracks: 20 km.

▪ High speed oval (V = 200 km/h) of 7 km, with maximum parabolic slope of 88 % in curves.

▪ Specific design of the pavements of each test track and the wet test irrigation system.

▪ Office buildings, warehouse, garages and water treatment facilities.

▪ Investment budget: EUR 50 M.

Santa Cruz de la Zarza, Toledo, Spain

Transport – Roads

Page 38: TYPSA Roads experience(Rodoanel) ring road | 2012 - 2013 Two sections of toll motorway (9 and 10 km long) and a 7.93 km connecting section. More than 40 bridges and viaducts. Two tunnels

Global Head of Roads Division

Francisco Silvestre Álvarez

[email protected]

TYPSA – Headquarters

C/ Gomera, 9 - San Sebastián de los Reyes - 28703 Madrid

Tel. +34 917 227 300 - Fax. +34 916 517 588

www.typsa.com