    Innovative Technologies, Creative Solutions

    Turret Mooring Design Some Challenges and Solutions

    FPSO Forum 2004 NUS, Singapore

    Arun Duggal

    FMC SOFEC Floating Systems

    www.sofec.com31 March 2004

  • 8/10/2019 Turret Mooring Design - Some Challenges and Solutions

    2/17

    Innovative Technologies, Creative Solutions

    FPSOs are a Mature & Versatile FPS Technology Over 100 units in operation worldwide FPSO total > than all other FPS combined Water depth range 20 m to > 1,400 meters 1 to 100+ risers 10,000 bbl 250,000 bbls/day Up to 2,000,000+ bbls storage Benign (West Africa) to Extreme Environments (North

    Atlantic) Various flavors:

    Turret-moored Spread-moored Yoke-moored Hawser-moored

  • 8/10/2019 Turret Mooring Design - Some Challenges and Solutions

    3/17

    Innovative Technologies, Creative Solutions

    Typical Permanent Internal Turret System

    Bearing (only upper in this case)

    Turret Shaft / Riser Guide Tubes

    Chain Table (Hawse Pipes/Chain Supports)

    6 Anchor Legs + 34 Risers

    Barracuda FPSO: Campos Basin

    834m, 34 RisersSwivel Stack (Product/Lift/Controls)

    Anchor Leg + Riser Pull-In Equipment

    Manifolds + Pig Launching/Receiving

  • 8/10/2019 Turret Mooring Design - Some Challenges and Solutions

    4/17

    Innovative Technologies, Creative Solutions

    Design Considerations

    Mooring System Anchor Legs Anchors Risers Thrusters & DP

    Control

    Environment Water Depth Waves Wind Current

    Vessel Particulars Storage / Tonnage Topsides Layout Vessel Motions

    Turret Design Configuration Size Location Loads

    Turret Mooring ofProduction Vessels

    Fluid-Transfer Requirements Well Heads

    Subsea Manifolding Risers Turret Manifolding Swivels Offloading Pigging

  • 8/10/2019 Turret Mooring Design - Some Challenges and Solutions

    5/17

    Innovative Technologies, Creative Solutions

    Some Current Turret Mooring Challenges

    More Complex Turret Systems Large number of risers Increased requirements for turret mounted equipment High pressures

    Riser Systems for very Shallow or Deep Water Project Schedule

    Short, fast-track schedules Project Design Basis not well defined Interfaces and Communication

    Installation in Deepwater Installation engineering, equipment, costs

  • 8/10/2019 Turret Mooring Design - Some Challenges and Solutions

    6/17

    Innovative Technologies, Creative Solutions

    Example 1: Fast-Track FPSO for Shallow Water

    Su Tu Den FPSO, Vietnam MODEC, Inc + FMC SOFEC + ConocoPhillips

    Newbuild FPSO (80,000 bbl oil/day)

    Schedule: Contact to First Oil 19 months Turret Delivery Schedule 12 months

    Shallow Water (48m water depth)

    Harsh Environment (100-yr wave of 8.1m Hs) Large Number of Risers (12)

  • 8/10/2019 Turret Mooring Design - Some Challenges and Solutions

    7/17

    Innovative Technologies, Creative Solutions

    Project Milestones 2002 Mar. Contract Award (LOI)(2002/03/21) 2002 Apr. Order Long Lead Items bearing, forgings, process 2002 Jun. Mooring Design Complete 2002 Aug. Turret Fabrication Begins (MSE) 2002 Oct. Hull Fabrication Begins (Samsung) 2002 Nov. Preliminary Riser Design Complete 2002 Dec. Topside Fabrication Begins 2003 Mar. Drydock Block Assembly Begins 2003 Apr. Start Topside Module and Turret Installation 2003 May Launching 2003 Jul. Start Shipyard Commissioning 2003 Sep. Tow Out 2003 Oct. Offshore Installation 2003 Oct. 1st Oil (2003/10/29)

  • 8/10/2019 Turret Mooring Design - Some Challenges and Solutions

    8/17

    Innovative Technologies, Creative Solutions

    STD Turret Mooring Design & Fabrication

    Use Standard Components & Design SOFEC Large External Turret Design

    Bearing Capacity exceeds anticipated Design Loads Allows order of main components before final loads

    derived Design Riser Configuration Flexibility in Chain

    Table Design/Fabrication

    Clearly Define all Structural and Fluid transferInterfaces at Turret Support Structure

    Parallel Design and Fabrication Effort

    Easy / Quick Integration with Vessel

  • 8/10/2019 Turret Mooring Design - Some Challenges and Solutions

    9/17

    Innovative Technologies, Creative Solutions

    Riser & Mooring Design in Shallow Water

  • 8/10/2019 Turret Mooring Design - Some Challenges and Solutions

    10/17

    Innovative Technologies, Creative Solutions

    Mooring and Riser Design 2

  • 8/10/2019 Turret Mooring Design - Some Challenges and Solutions

    11/17

    Innovative Technologies, Creative Solutions

    Integration of Turret & Vessel

  • 8/10/2019 Turret Mooring Design - Some Challenges and Solutions

    12/17

    Innovative Technologies, Creative Solutions

    First Oil: November 2003

  • 8/10/2019 Turret Mooring Design - Some Challenges and Solutions

    13/17

    Innovative Technologies, Creative Solutions

    Application

    FPSO weathervaning SPM Large field (>100,000 bbld) 50 to 100+ risers Deep to ultra deep water Worldwide

    Weathervaning advantages Mooring tensions Tandem offloading

    Simplified turret structure Allows for simple interface with vessel

    Robust bearing system

    Large Decks for Flowline Manifolding,and other Equipment Efficient Mooring & Riser Installation

    Equipment

    Example 2: Very Large Turret

  • 8/10/2019 Turret Mooring Design - Some Challenges and Solutions

    14/17

    Innovative Technologies, Creative Solutions

    ChainTable

    I-Tubes

    Support Columns

    Chain Supports

    MainDeck

    TorqueArm

    Vertical Bearing

    Radial

    Bearing

    Swivel Stack &Torque Tube

    Piping /Manifolding

    Riser Hang-Off

    Pull-InDeck

    Anchor Legs Risers & Bend Stiffeners

    VLT: Deep Water, Large Capacity Internal Turret

  • 8/10/2019 Turret Mooring Design - Some Challenges and Solutions

    15/17

    Innovative Technologies, Creative Solutions

    VLT Chain Table 3x3 mooring provides 3

    riser corridors Riser quantity defines

    chain table (and turret)diameter

    60 risers - 22 m dia 90 risers - 31 m dia 120 risers - 40 m dia

    2 riser rows maximum No shadowing to allow

    inner row installation andreplacement

  • 8/10/2019 Turret Mooring Design - Some Challenges and Solutions

    16/17

  • 8/10/2019 Turret Mooring Design - Some Challenges and Solutions

    17/17

    Innovative Technologies, Creative Solutions

    Conclusions

    Turret Moored FPSOs are a Very Mature Technology Design for Load Transfer is typically not an issue Current challenges mostly associated with Fluid Transfer

    Large Number of Risers

    High Pressure

    ManifoldingSubsea Intervention & Control

    Project Parameters also Impact Turret Mooring Design Schedule

    Fast-track: 18 22 months

    Complex systems require more commissioning time Communication & Interfaces among various contractors / client Knowledge of others scope of work, issues, etc.