tsmad20/dipwg2-23b rostock may 2010. agenda where we are what we are doing prior to 2012 post 2012
TRANSCRIPT
![Page 1: TSMAD20/DIPWG2-23B Rostock May 2010. Agenda Where we are What we are doing Prior to 2012 Post 2012](https://reader036.vdocuments.us/reader036/viewer/2022062619/55154b48550346c77d8b635f/html5/thumbnails/1.jpg)
TSMAD20/DIPWG2-23BRostock
May 2010
![Page 2: TSMAD20/DIPWG2-23B Rostock May 2010. Agenda Where we are What we are doing Prior to 2012 Post 2012](https://reader036.vdocuments.us/reader036/viewer/2022062619/55154b48550346c77d8b635f/html5/thumbnails/2.jpg)
AgendaWhere we areWhat we are doingPrior to 2012Post 2012
![Page 3: TSMAD20/DIPWG2-23B Rostock May 2010. Agenda Where we are What we are doing Prior to 2012 Post 2012](https://reader036.vdocuments.us/reader036/viewer/2022062619/55154b48550346c77d8b635f/html5/thumbnails/3.jpg)
Where we are todayS-57 has been frozen for over ten yearsTwo Supplements have been issued for S-57
Fixes for Safety of NavigationS-100 published in January 2010S-101 is in the initial planning stages
Draft 0.1 is 90% complete
![Page 4: TSMAD20/DIPWG2-23B Rostock May 2010. Agenda Where we are What we are doing Prior to 2012 Post 2012](https://reader036.vdocuments.us/reader036/viewer/2022062619/55154b48550346c77d8b635f/html5/thumbnails/4.jpg)
Selling S-101S-101 is an improved navigation product
Based on the plug and play functionality of S-100
Will bring improvements for the HO’s Additional features Standard is easier to update and implement
Improvements for Distributors?End user Improvements
Improved Portrayal Improved Updating Navigation Information Overlays
![Page 5: TSMAD20/DIPWG2-23B Rostock May 2010. Agenda Where we are What we are doing Prior to 2012 Post 2012](https://reader036.vdocuments.us/reader036/viewer/2022062619/55154b48550346c77d8b635f/html5/thumbnails/5.jpg)
Need involvement from all sectorsMember StatesSoftware ManufacturersOEM’sDistributorsEnd-users
![Page 6: TSMAD20/DIPWG2-23B Rostock May 2010. Agenda Where we are What we are doing Prior to 2012 Post 2012](https://reader036.vdocuments.us/reader036/viewer/2022062619/55154b48550346c77d8b635f/html5/thumbnails/6.jpg)
S-101 Tentative Timeline2012
First Edition S-101 publishedFirst Edition S-10X published for use in an S-
101 ECDIS
How Do We Get to this goal?
![Page 7: TSMAD20/DIPWG2-23B Rostock May 2010. Agenda Where we are What we are doing Prior to 2012 Post 2012](https://reader036.vdocuments.us/reader036/viewer/2022062619/55154b48550346c77d8b635f/html5/thumbnails/7.jpg)
Prior to 2012S-101 stakeholders need to establish the
following:Exporting S-101 test data using the new 8211Read S-101 into an ECDISRead and S-10X into and ECDISProve that it is usable for navigation
Test Beds User Feedback
![Page 8: TSMAD20/DIPWG2-23B Rostock May 2010. Agenda Where we are What we are doing Prior to 2012 Post 2012](https://reader036.vdocuments.us/reader036/viewer/2022062619/55154b48550346c77d8b635f/html5/thumbnails/8.jpg)
How do we fund this?S-52 Product Library
Used for S-100 portrayalInternational grants
EUNorth America
Member StatesResearch Consortiums
![Page 9: TSMAD20/DIPWG2-23B Rostock May 2010. Agenda Where we are What we are doing Prior to 2012 Post 2012](https://reader036.vdocuments.us/reader036/viewer/2022062619/55154b48550346c77d8b635f/html5/thumbnails/9.jpg)
International CoordinationNeed to coordinate with other International
BodiesIMO
ECDIS Performance StandardIEC
IEC 61174 – ECDIS type approvalE-NAV
This may provide an opportunity to utilize S-101 and S-10X product specifications as the base navigation data
![Page 10: TSMAD20/DIPWG2-23B Rostock May 2010. Agenda Where we are What we are doing Prior to 2012 Post 2012](https://reader036.vdocuments.us/reader036/viewer/2022062619/55154b48550346c77d8b635f/html5/thumbnails/10.jpg)
Post 2012S-101 will be an official product specificationHow do we transition users from S-57 to S-
1015 years10 years15 years
![Page 11: TSMAD20/DIPWG2-23B Rostock May 2010. Agenda Where we are What we are doing Prior to 2012 Post 2012](https://reader036.vdocuments.us/reader036/viewer/2022062619/55154b48550346c77d8b635f/html5/thumbnails/11.jpg)
S-101 Transition ChallengesS-57 and S-101 will be produced and used in
parallelHO production systems will have to produce
bothDistribution will need to consider bothOEMs will need to read both
IHO will need to maintain two standardsUser uptake for S-101
![Page 12: TSMAD20/DIPWG2-23B Rostock May 2010. Agenda Where we are What we are doing Prior to 2012 Post 2012](https://reader036.vdocuments.us/reader036/viewer/2022062619/55154b48550346c77d8b635f/html5/thumbnails/12.jpg)
Questions for DiscussionHow do we maintain the interest of
stakeholders?Is the 2012 deadline too ambitious?How do we fund this endeavor?How will coordination between other
International Bodies be done?