transport management in karachi malik zaheer-ul-islam director general malik zaheer-ul-islam...
TRANSCRIPT
Transport Management in KarachiTransport Management in KarachiTransport Management in KarachiTransport Management in Karachi
MALIK ZAHEER-UL-ISLAMMALIK ZAHEER-UL-ISLAMDirector General Director General
MALIK ZAHEER-UL-ISLAMMALIK ZAHEER-UL-ISLAMDirector General Director General
Karachi Mass Transit CellKarachi Mass Transit CellKarachi Mass Transit CellKarachi Mass Transit Cell
CITY DISTRICT GOVERNMENT KARACHICITY DISTRICT GOVERNMENT KARACHICITY DISTRICT GOVERNMENT KARACHICITY DISTRICT GOVERNMENT KARACHI
National Urban Air Quality WorkshopNational Urban Air Quality WorkshopKarachi, 13-14Karachi, 13-14thth Sept. 2006 Sept. 2006
National Urban Air Quality WorkshopNational Urban Air Quality WorkshopKarachi, 13-14Karachi, 13-14thth Sept. 2006 Sept. 2006
Presentation Presentation onon
Presentation Presentation onon
KARACHI – A MEGA CITYKARACHI – A MEGA CITYKARACHI – A MEGA CITYKARACHI – A MEGA CITY
Area (District) 3,365 Sq.Km Urban Area 1,800 Sq.Km Population (Estimated) 15 Million Population Growth Rate 4.0%
Area (District) 3,365 Sq.Km Urban Area 1,800 Sq.Km Population (Estimated) 15 Million Population Growth Rate 4.0%
Administrative Set-up
• Authority: City District Government Karachi
• Towns 18
• Union Councils 178
• Cantonment Boards 6
Administrative Set-up
• Authority: City District Government Karachi
• Towns 18
• Union Councils 178
• Cantonment Boards 6
City Profile City Profile
KARACHI MASS TRANSIT CELLKARACHI MASS TRANSIT CELL
REGISTERED VEHICLES IN KARACHIREGISTERED VEHICLES IN KARACHI(MAY 2006)(MAY 2006)
REGISTERED VEHICLES IN KARACHIREGISTERED VEHICLES IN KARACHI(MAY 2006)(MAY 2006)
ModeMode Number %AgeNumber %Age
Cars / JeepsCars / Jeeps 710,602710,602 47.1 47.1 Motor CyclesMotor Cycles 588,002588,002 39.0 39.0 Auto RickshawsAuto Rickshaws 41,650 41,650 02.8 02.8 TaxisTaxis 44,794 44,794 02.9 02.9 Buses & Mini-busesBuses & Mini-buses 20,810 20,810 01.4 01.4 TrucksTrucks 19,439 19,439 01.3 01.3 TractorsTractors 2,844 2,844 00.2 00.2 Others (Van & Pickup)Others (Van & Pickup) 80,074 80,074 05.305.3
Total:Total: 1,508,215 1,508,215
ModeMode Number %AgeNumber %Age
Cars / JeepsCars / Jeeps 710,602710,602 47.1 47.1 Motor CyclesMotor Cycles 588,002588,002 39.0 39.0 Auto RickshawsAuto Rickshaws 41,650 41,650 02.8 02.8 TaxisTaxis 44,794 44,794 02.9 02.9 Buses & Mini-busesBuses & Mini-buses 20,810 20,810 01.4 01.4 TrucksTrucks 19,439 19,439 01.3 01.3 TractorsTractors 2,844 2,844 00.2 00.2 Others (Van & Pickup)Others (Van & Pickup) 80,074 80,074 05.305.3
Total:Total: 1,508,215 1,508,215
KARACHI MASS TRANSIT CELLKARACHI MASS TRANSIT CELL
Average vehicle increase / day = 400 +
1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006
Years
Registered Vehicles in Karachi (1995 – May 2006)Registered Vehicles in Karachi (1995 – May 2006)
ModesModes 19871987 %% 19901990 %% 20002000 %% 20052005 %% 20102010 %%
Private VehiclesPrivate Vehicles 20062006 3939 27822782 4343 66696669 5151 94909490 5454 1335013350 5757
Para TransitPara Transit 535535 1010 631631 1010 10191019 88 12351235 77 15291529 66
Public TransportPublic Transport 26682668 5151 30113011 4747 53935393 4141 68186818 3939 87248724 3737
Total TripsTotal Trips 52095209 100100 64246424 100100 1308113081 100100 1754317543 100100 2360323603 100100
KARACHI MASS TRANSIT STUDYKARACHI MASS TRANSIT STUDY – PERSON TRIPS (1987 – 90) – PERSON TRIPS (1987 – 90)
(In 1000)(In 1000)
KARACHI MASS TRANSIT CELLKARACHI MASS TRANSIT CELL
20052005
KARACHI – POPULATION GROWTH KARACHI – POPULATION GROWTH TREND & TRIPS GENERATED TREND & TRIPS GENERATED
KARACHI MASS TRANSIT CELLKARACHI MASS TRANSIT CELL
Population: 5.43 millionPopulation: 5.43 million
Trips: 5.21 millionTrips: 5.21 million
Population: 15.00 million Population: 15.00 million
Trips: 24.23 millionTrips: 24.23 million
500%500%
19871987
TRIP DEFINITION:TRIP DEFINITION:
HomeHome OfficeOffice 2 Trips2 TripsHomeHome OfficeOffice 2 Trips2 Trips
ShoppingShopping
OfficeOfficeHomeHome 3 Trips3 Trips
ShoppingShopping
OfficeOfficeHomeHome
ShoppingShopping
OfficeOfficeHomeHome 3 Trips3 Trips
HomeHome OfficeOffice 1 Trip1 TripHomeHome OfficeOffice 1 Trip1 Trip
• Karachi: 35 persons competing for one bus seatKarachi: 35 persons competing for one bus seat
• Mumbai: 12 persons competing for one bus seat Mumbai: 12 persons competing for one bus seat
• Hong Kong: 8 persons competing for one bus seatHong Kong: 8 persons competing for one bus seat
KARACHI MASS TRANSIT CELLKARACHI MASS TRANSIT CELL
GLIMPSES OF VEHICLE TESTINGGLIMPSES OF VEHICLE TESTING
GLIMPSES OF VEHICLE TESTINGGLIMPSES OF VEHICLE TESTING
Do Something !Do Something ! Operation by Government Operation by Government Out Sourcing (Public - Private Partnership)Out Sourcing (Public - Private Partnership)
YearYear TSPTSP(ug/m3)(ug/m3)
PM10PM10(ug/m3)(ug/m3)
NOxNOx(ppb)(ppb)
SO2SO2(ppb)(ppb)
O3O3(ppb)(ppb)
MethaneMethane(ppm)(ppm)
19991999 210210 164164 1616 11.711.7 11.211.2 0.50.5
20032003 349349 182182 20.920.9 1717 1717 0.70.7
20042004 374.5374.5 194194 28.828.8 2424 18.818.8 6.56.5
% Increase / % Increase / Decrease from Decrease from 1999 to 20041999 to 2004 78.478.4 18.318.3 8080 105105 6868 13001300
AIR POLLUTANTS IN THE AIR OF KARACHI AIR POLLUTANTS IN THE AIR OF KARACHI
(26 Site Survey by SUPARCO) (26 Site Survey by SUPARCO)
MAJOR ISSUESMAJOR ISSUES
• Rapid population growthRapid population growth
• High growth of Private vehicle High growth of Private vehicle ownershipownership
• Disorganized and haphazard Disorganized and haphazard Transport SystemTransport System
• Absence of an efficient Public Absence of an efficient Public Transport SystemTransport System
• Increase in number of fatal Increase in number of fatal accidents accidents
• Air and noise pollution Air and noise pollution
• Scarce resources to undertake Scarce resources to undertake Mega Public Transport ProjectsMega Public Transport Projects
KARACHI MASS TRANSIT CELLKARACHI MASS TRANSIT CELL
CHALLENGESCHALLENGES
Explosive Growth Explosive Growth
Resource Scarcity Resource Scarcity
Commercial Viability Commercial Viability
Integrated strategies Integrated strategies
UPDATING OF KARACHI MASTER PLANUPDATING OF KARACHI MASTER PLAN
LOW COST TRAFFIC MANAGEMENT SCHEMES:LOW COST TRAFFIC MANAGEMENT SCHEMES:
• Bus lane, bus stops, intersection improvement, urban Bus lane, bus stops, intersection improvement, urban traffic control, SMV facilities – footpaths etc.traffic control, SMV facilities – footpaths etc.
• Creation of vehicular free zone – pedestrian malls in down Creation of vehicular free zone – pedestrian malls in down towntown
• Demand managementDemand management
MOTOR VEHICLE TESTING AND DRIVERS’ TRAINING MOTOR VEHICLE TESTING AND DRIVERS’ TRAINING PROGRAMS THROUGH PUBLIC – PRIVATE PARTNERSHIP PROGRAMS THROUGH PUBLIC – PRIVATE PARTNERSHIP BASISBASIS
• Revamping of public transport systemRevamping of public transport system
• Induction of Euro-II and CNG environmental friendly Induction of Euro-II and CNG environmental friendly busesbuses
• Conversion of Auto Rickshaws to CNGConversion of Auto Rickshaws to CNG
IMPROVEMENT PROGRAMS IMPROVEMENT PROGRAMS
CAPITAL INTENSIVE TRANSPORT IMPROVEMENT CAPITAL INTENSIVE TRANSPORT IMPROVEMENT PROGRAMS PROGRAMS
• CONSTRUCTION OF ROAD INFRASTRUCTURE CONSTRUCTION OF ROAD INFRASTRUCTURE PROJECTS INCLUDING FLYOVERS / UNDER PASSES PROJECTS INCLUDING FLYOVERS / UNDER PASSES ETC.ETC.
► Northern Bypass Northern Bypass ► Lyari ExpresswayLyari Expressway► Elevated Expressway Elevated Expressway
REVITALIZATION OF KCRREVITALIZATION OF KCR
IMPLEMENTATION OF RAIL BASED MASS TRANSIT IMPLEMENTATION OF RAIL BASED MASS TRANSIT PROJECT ON PRIORITY CORRIDORSPROJECT ON PRIORITY CORRIDORS
IMPROVEMENT PROGRAMS IMPROVEMENT PROGRAMS (Contd.)(Contd.)
INTERSECTION IMPROVEMENT PLANINTERSECTION IMPROVEMENT PLAN
JAIL CHOWRANGIJAIL CHOWRANGI
BEFOREBEFORE AFTERAFTER
CH. KHALIQ-UZ-ZAMAN ROADCH. KHALIQ-UZ-ZAMAN ROAD(KHAYABAN-E-JAMI ROAD)(KHAYABAN-E-JAMI ROAD)
BEFOREBEFORE AFTERAFTER
PVI PVI SYSTEMSYSTEM
NETWORK NETWORK &&
IT SYSTEMSIT SYSTEMS
LAND LAND & &
INFRASTRUCTUREINFRASTRUCTURE
TEST LANESTEST LANES& &
EQUIPMENTEQUIPMENT
QUALITY QUALITY ASSURANCEASSURANCE
SUPERVISION SUPERVISION & &
AUDITAUDIT
CUSTOMER CUSTOMER SERVICESERVICE
MANAGEMENTMANAGEMENT
COMPILATION COMPILATION & &
MAINTENANCE MAINTENANCE OF DATA BASEOF DATA BASE
COMMUNICATIONCOMMUNICATION& &
PUBLIC PUBLIC AWARENESSAWARENESS
ESSENTIAL ELEMENTS OF A PVI SYSTEM ESSENTIAL ELEMENTS OF A PVI SYSTEM
ELEVATED EXPRESSWAYELEVATED EXPRESSWAY(Estimated Cost: US$. 225 million)
KARACHI MASS TRANSIT CELLKARACHI MASS TRANSIT CELL
HINO CHOWK FLYOVERHINO CHOWK FLYOVER
MULTI MODAL TRANSPORT
All modes of passenger transport:
Buses Cars Para transit
Rail
Integration and coordination of: Road management Traffic management Land use and town planning Priorities and policymaking Funding management
Develop and manage Strategic Urban Transit Policy
Develop and manage Strategic Urban Transit Policy
Objective:
To establish an integrated, efficient, economically sustainable and market-driven quality Urban Transport System which
• Meets the needs of citizens
• Supports rapid economic development
• Protects the environment
• Ensures service / road discipline
INDUCTION OF ENVIRONMENT INDUCTION OF ENVIRONMENT FRIENDLY BUSES FOR KARACHIFRIENDLY BUSES FOR KARACHI
Strategy
Provide an Urban Transport System under a reformed programme of regulation aimed at maintaining a balance between the provision of fast, frequent, reliable, comfortable, safe and affordable service to the public.
The need for operators to make a reasonable return keeping the environment friendly standards of buses and road / service discipline
INDUCTION OF ENVIRONMENT FRIENDLYINDUCTION OF ENVIRONMENT FRIENDLYBUSES FOR KARACHI BUSES FOR KARACHI (CONTD.)(CONTD.)
INDUCTION OF ENVIRONMENT FRIENDLY BUSES UNDER PUBLIC - PRIVATE PARTNERSHIP
Institutional Development and funding
Concepts Bus Rapid
Transit
Review existing situation
Route Development
EnvironmentalIssues
Supporting infrastructure
Bus specifications
and supply
Financial analysis and costimpacts
Strategy development
Comprehensive Bus Development
Plan
(95% Study Completed)
55551010121288
Refurbishment of bus depots / bus terminals by private sector
Refurbishment of bus depots / bus terminals by private sector
404080808080150150150150
Construction & maintenance of bus stops by private sector
Construction & maintenance of bus stops by private sector
5555101010101212
Construction of CNG stations by private sectors (at proposed depot sites of CDGK)
Construction of CNG stations by private sectors (at proposed depot sites of CDGK)
1,072**1,072**1,072**1,072**1,072**1,072**1,072**1,072**481481Phasing out of old vehiclesPhasing out of old vehicles
820*(70 capacity
buses)390*
(40 capacity buses)
820*(70 capacity
buses)390*
(40 capacity buses)
820*(70 capacity
buses)390*
(40 capacity buses)
820*(70 capacity
buses)390*
(40 capacity buses)
1,150(70 capacity
buses)475
(40 capacity buses)
1,150(70 capacity
buses)475
(40 capacity buses)
1,025(70 capacity
buses)435
(40 capacity buses)
1,025(70 capacity
buses)435
(40 capacity buses)
650(70 capacity buses)-
650(70 capacity buses)-
Induction of new CNG buses Induction of new CNG buses
Year – 5Year – 5Year – 4Year – 4Year – 3Year – 3Year – 2Year – 2Year – 1Year – 1ItemsItems
INDUCTION OF ENVIRONMENT FRIENDLY BUSES
INDUCTION OF ENVIRONMENT FRIENDLY BUSES
KARACHI MASS TRANSIT PROGRAMKARACHI MASS TRANSIT PROGRAM
Karachi Mass Transit Study conducted with the technical and financial assistance of World Bank in 1990, recommended 87 km Transit Network including Six Priority Corridors of high travel demand initially for bus ways convertible to Light Rail System
The 6 Priority Corridors of high travel demand were approved and notified by Government of Pakistan in June 1995
Karachi Mass Transit Study conducted with the technical and financial assistance of World Bank in 1990, recommended 87 km Transit Network including Six Priority Corridors of high travel demand initially for bus ways convertible to Light Rail System
The 6 Priority Corridors of high travel demand were approved and notified by Government of Pakistan in June 1995
KARACHI MASS TRANSIT CELLKARACHI MASS TRANSIT CELL
PRIORITY CORRIDOR-ISOHRAB GOTH TO TOWER
PRIORITY CORRIDOR-ISOHRAB GOTH TO TOWER
• Length: 17.4 km
• Double Track: 14.5 km
• Single Track: 2.9 km
• No of Stations: 17
• Expected Ridership 30,000 pphpd (During peak hours)
Implementation StatusImplementation Status
The proposals have been invited for LRT System on BOT basis. The Proposal is being evaluated
• Length: 17.4 km
• Double Track: 14.5 km
• Single Track: 2.9 km
• No of Stations: 17
• Expected Ridership 30,000 pphpd (During peak hours)
Implementation StatusImplementation Status
The proposals have been invited for LRT System on BOT basis. The Proposal is being evaluated
KARACHI MASS TRANSIT CELLKARACHI MASS TRANSIT CELL
CORRIDOR-II (ORANGI TOWN TO CANTT. STATION)
RIGHT OF WAY: 13.4 KM, STATIONS: 15RIDERSHIP: 25,000 PPHPD
CORRIDOR-II (ORANGI TOWN TO CANTT. STATION)
RIGHT OF WAY: 13.4 KM, STATIONS: 15RIDERSHIP: 25,000 PPHPD
Option-IIElevated: 8.4 kmUnderground: 5 km
Option-IIElevated: 8.4 kmUnderground: 5 km
Option-I
Elevated: 13.4 km
Option-I
Elevated: 13.4 km
EOI invited for LRT on BOT.EOI invited for LRT on BOT.
KARACHI MASS TRANSIT CELLKARACHI MASS TRANSIT CELL
KCR ROUTE MAPKCR ROUTE MAP
KARACHI MASS TRANSIT CELLKARACHI MASS TRANSIT CELL
Study Item Plan
Gauge 1676mm or 1435mm
Speedup Electric railcar system
Enhancement of train frequency
Double track in all sections
Elimination of
level crossingRailway elevation in some sections
Increase in demand
1) Connection with buses at railway stations (Station plaza construction, etc.)
2) Railway access to Karachi Airport
KCR REVIVAL PROJECTKCR REVIVAL PROJECT
KARACHI MASS TRANSIT CELLKARACHI MASS TRANSIT CELL
COMPLETION OF KCR REVIVAL PROJECTCOMPLETION OF KCR REVIVAL PROJECT
KARACHI MASS TRANSIT CELLKARACHI MASS TRANSIT CELL
COMPONENTS OF PRIORITY COMPONENTS OF PRIORITY ACTION PLANACTION PLAN
• Corridor- ICorridor- I
Stage-IStage-I Tower to Sohrab Goth -15.2 k.mTower to Sohrab Goth -15.2 k.m
Stage-IIStage-IIExtension upto New Sabzi Mandi-8 kmExtension upto New Sabzi Mandi-8 km
• Corridor-II Corridor-II Cantt. Station to Orangi Town – 13.4 kmCantt. Station to Orangi Town – 13.4 km
• KCRKCRRevitalization and Up-gradationRevitalization and Up-gradation
KARACHI MASS TRANSIT CELLKARACHI MASS TRANSIT CELL
THANK YOU