Page 1: TRAFFIC OPERATIONS DURING MAJOR CONSTRUCTION … · 2018-11-09 · Keys to Successful Closures. 13 • Details of Traffic Control Plan Critical • Design for efficient setup/take

TRAFFIC OPERATIONS DURING MAJOR CONSTRUCTION ACTIVITIESAustin DistrictOctober 2018

Page 2: TRAFFIC OPERATIONS DURING MAJOR CONSTRUCTION … · 2018-11-09 · Keys to Successful Closures. 13 • Details of Traffic Control Plan Critical • Design for efficient setup/take

2

Challenges• Project Need and Purpose

• Duration of Construction

• Dynamic Work Scenarios

Why do anything?• Ability to Impact

• Enhance Safety

• Ease Public ConcernsTransportation System

Management & Operations (TSMO)

Page 3: TRAFFIC OPERATIONS DURING MAJOR CONSTRUCTION … · 2018-11-09 · Keys to Successful Closures. 13 • Details of Traffic Control Plan Critical • Design for efficient setup/take

IH 35 Corridor in Austin

3

0

1000

2000

3000

4000

5000

6000

200,000

205,000

210,000

215,000

220,000

225,000

230,000

235,000

240,000

245,000

250,000

2010 2011 2012 2013 2014 2015 2016 2017 2018

Cras

hes

Daily

Dem

and

Volu

me

Volume

Crashes

Work Zone Crashes

2018 Projected

Page 4: TRAFFIC OPERATIONS DURING MAJOR CONSTRUCTION … · 2018-11-09 · Keys to Successful Closures. 13 • Details of Traffic Control Plan Critical • Design for efficient setup/take

IH 35 Corridor – 2014 Versus 2018 Volume Distribution

4

0.0%

1.0%

2.0%

3.0%

4.0%

5.0%

6.0%

7.0%

8.0%

9.0%

10.0%

12:00AM

1:00AM

2:00AM

3:00AM

4:00AM

5:00AM

6:00AM

7:00AM

8:00AM

9:00AM

10:00AM

11:00AM

12:00PM

1:00PM

2:00PM

3:00PM

4:00PM

5:00PM

6:00PM

7:00PM

8:00PM

9:00PM

10:00PM

11:00PM

Page 5: TRAFFIC OPERATIONS DURING MAJOR CONSTRUCTION … · 2018-11-09 · Keys to Successful Closures. 13 • Details of Traffic Control Plan Critical • Design for efficient setup/take

IH 35 Corridor – 2018 Demand Volumes

5

6250

4750

3250 32502500 2750

6500

11000

13250

1200011500

11750

12500

1325013250

14500

1600016250

14500

15500

13250

1200011250

9500

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

12:00AM

1:00AM

2:00AM

3:00AM

4:00AM

5:00AM

6:00AM

7:00AM

8:00AM

9:00AM

10:00AM

11:00AM

12:00PM

1:00PM

2:00PM

3:00PM

4:00PM

5:00PM

6:00PM

7:00PM

8:00PM

9:00PM

10:00PM

11:00PM

Page 6: TRAFFIC OPERATIONS DURING MAJOR CONSTRUCTION … · 2018-11-09 · Keys to Successful Closures. 13 • Details of Traffic Control Plan Critical • Design for efficient setup/take

Case Study – William Cannon Project

6

Page 7: TRAFFIC OPERATIONS DURING MAJOR CONSTRUCTION … · 2018-11-09 · Keys to Successful Closures. 13 • Details of Traffic Control Plan Critical • Design for efficient setup/take

Performance Metrics

7

0

10

20

30

40

50

60

70

80

90

10:00PM

11:00PM

12:00AM

1:00 AM 2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 7:00 AM

Trav

el T

ime

(Min

utes

)

Page 8: TRAFFIC OPERATIONS DURING MAJOR CONSTRUCTION … · 2018-11-09 · Keys to Successful Closures. 13 • Details of Traffic Control Plan Critical • Design for efficient setup/take

May 11, 2018 William Cannon Closure

8

What Was Done• Notify Public• Contractor Coordination Meetings• Deployed Portable Data Collectors• Advanced DMS Messaging• Surged HERO Units

What Was Learned• TCP took too long to setup• Operational flaw in traffic control• More Public/Agency Outreach • HERO Units are busy • Strategize Regional DMS Messaging• Validate Data

Page 9: TRAFFIC OPERATIONS DURING MAJOR CONSTRUCTION … · 2018-11-09 · Keys to Successful Closures. 13 • Details of Traffic Control Plan Critical • Design for efficient setup/take

Original William Cannon Closure TCP

9

Page 10: TRAFFIC OPERATIONS DURING MAJOR CONSTRUCTION … · 2018-11-09 · Keys to Successful Closures. 13 • Details of Traffic Control Plan Critical • Design for efficient setup/take

July 27, 2018 William Cannon Closure

10

What Was Done• Advanced Public Notices

• News Story!!• Contractor Coordination Meetings

• TCP for 1 off, 1 on• Identify window for least impact

• Met with City of Austin• Coordinated with Smart Work Zone Vendors

• Dynamic Messaging of Exits• Held meetings with CTECC Operators• Surged HERO Units• Deployed Portable Data Collectors

Page 11: TRAFFIC OPERATIONS DURING MAJOR CONSTRUCTION … · 2018-11-09 · Keys to Successful Closures. 13 • Details of Traffic Control Plan Critical • Design for efficient setup/take

July 27, 2018 WCC – Performance Metrics

11

Page 12: TRAFFIC OPERATIONS DURING MAJOR CONSTRUCTION … · 2018-11-09 · Keys to Successful Closures. 13 • Details of Traffic Control Plan Critical • Design for efficient setup/take

July 27, 2018 William Cannon Closure

12

Improvements• Shorter Travel Time and Delay• Public Outreach was successful• Reduction in demand

• Less traffic on William Cannon• Less traffic on IH 35

• Work Finished EarlyPerformance Measure May 11, 2018 July 27, 2018 Improvements

Typical Volume 38,150 38,300 -

Observed 24,870 16,200 8,670

Typical Travel Time 8 Minutes 8 Minutes -

Observed Maximums 87 Minutes 60 Minutes 27 Minutes

Average Delayed Travel Time 35 Minutes 26 Minutes 9 Minutes

Number of Impacted Vehicles 18,155 9,558 8,597

020406080

100

10:0

0 PM

11:0

0 PM

12:0

0 AM

1:00

AM

2:00

AM

3:00

AM

4:00

AM

5:00

AM

6:00

AM

7:00

AMTr

avel

Tim

e (M

inut

es)

Travel Time Comparison

May 11th

July 27th

Page 13: TRAFFIC OPERATIONS DURING MAJOR CONSTRUCTION … · 2018-11-09 · Keys to Successful Closures. 13 • Details of Traffic Control Plan Critical • Design for efficient setup/take

Keys to Successful Closures

13

• Details of Traffic Control Plan Critical• Design for efficient setup/take down• Identify Day/Time for least impact to traffic• Limit Conflicting Movements

• Public Outreach has biggest cost/benefit• Improve regional awareness• Effective travel demand management strategy

• After Action Meetings• Gather Job Site Feedback• Analyze Traffic Data • Collaborate and Coordinate Improvements

• Coordinate with Regional Partners• Limit cross traffic demand, leverage roadway network

• Install ITS Early

Page 14: TRAFFIC OPERATIONS DURING MAJOR CONSTRUCTION … · 2018-11-09 · Keys to Successful Closures. 13 • Details of Traffic Control Plan Critical • Design for efficient setup/take

Looking Forward

14

• Further TSMO Practices• Incorporate in Planning & Design Process

• Apply Process for Major Incidents• Apply Process for Daily Activities

• Extreme Weather Events• Leverage Technology

• Communication• Traffic Monitoring and Incident Management• Traveler Information

• Predictive Analytics

Page 15: TRAFFIC OPERATIONS DURING MAJOR CONSTRUCTION … · 2018-11-09 · Keys to Successful Closures. 13 • Details of Traffic Control Plan Critical • Design for efficient setup/take

15

Adam Kaliszewski, P.E., PTOETxDOT Austin District