tpm
DESCRIPTION
rweTRANSCRIPT
Tpm.training
Safe
ty, H
ealt
h &
en
viro
nmen
t
Educ
atio
n &
Tra
inin
g
Init
ial fl
ow C
ontr
ol
Tool
Mai
nten
ance
Offi
ce T
PM
Qua
lity
Mai
nten
ance
Plan
ned
Mai
nten
ance
Focu
ssed
Impr
ovem
ent
Auto
nom
ous
Mai
nten
ance
1 2 43 5 9876
Tpm.training
Jishu Hozen – autonomous Maintenance
Purpose :
1. Training of operators to be proficient in equipment2. Protecting ones own equipment
Members:1. Operators2. Line leaders3. supervisors
Tpm.training
JISHU HOZEN
““Jishu Hozen” is the activities which Jishu Hozen” is the activities which each operator performs -daily inspection ,each operator performs -daily inspection ,lubrication, parts replacement, repair, lubrication, parts replacement, repair, trouble-shooting, accuracy checks andtrouble-shooting, accuracy checks andso forth on his own equipment, aiming atso forth on his own equipment, aiming atachieving the goal of keeping “one’s own achieving the goal of keeping “one’s own equipment in good condition by one self equipment in good condition by one self ””
Tpm.training
Jishu Hozen – 7 Steps
1. Initial Clean up
2. Counter Measures
3. Tentative standards
4. General Inspection
5. Autonomous Inspection
6. standardisation
7. Autonomous Management
Tpm.training
Jishu - HozenSteps for developing
1. Initial Cleaning(inspection)
• All- around clean-up of dust and dirt on equipment.
• Oiling and re-tightening of bolts and nuts
• Finding and restoration of “Fuguai” (abnormalities)
Tpm.training
Tpm.training
Tpm.training
So Cleaning is…ESSENTIALPurpose of cleaning
Tpm.training
DIS COVER ---- DISCOVER-
Tpm.training
WHAT TO CHECK ?• Loose bolts & nuts.• Loose wires.• Missing parts.• Rusted parts.• Broken parts.• Cracked parts.• Air leaks• Oil leaks• Coolant leaks.• Dirt, dust and cobwebs.• Oil on the floor.• Scrap around the machine.• Burr and swarf around the machine.• Abnormal heat.• Abnormal sound.• Abnormal vibration.
Tpm.training
Jishu Hozen – 7 Steps
Step 1: Initial Clean up
a. Formation of JH circlesb. division of machine pars to operatorsc. Training on abnormality identificationd. Preparation of red & white tags
a. White tags – for abnormality that can be corrected by unskilled personb. Red tags – for abnormality that can be corrected by skilled person
e. Keeping cleaning tools readyf. fixing time for JH Activityg. Cleaning all parts of the machine – even opening of parts are necessaryh. Inspection of parts during cleaning activityi. Identification and tagging of abnormality and recordingj. Identify difficult to access areas around the machine-In-Accessible(IA)k. Identify the SOC – source of contamination after cleaningl. Record in the matrix – red & white tags,IA,SOC
Tpm.training
Baniyan waste
To clean small burr & coolant
Nylon brush
To clean small burr & coolant
Tools used for cleaning
Tpm.training
Wire brush
To clean small burr & coolant
Spanners
To tighten loose bolts & nuts
Tools used for cleaning
Tpm.training
Showel
To clean big burr & swarf
Screw drivers
To tighten loose screws
Tools used for cleaning
Tpm.training
Allen Keys
To remove screws
Tools used for cleaning
Allen Keys
To remove hard/ solidified burr & dust
Tpm.training
Jishu Hozen – 7 Steps
Step 1: Initial Clean upa. Formation of JH circlesb. division of machine pars to operators
Machine no:
Circle No:
Circle Leader:
Circle Members:1234
Machine Parts: Responsibility:123456
Tpm.training
Jishu Hozen – 7 Steps
Step 1: Initial Clean up• Record in the matrix – red & white tags,IA,SOC
Tag MatrixMachine No:Circle No:
Slno M/c Parts dust Leak Loose Missing vibration noise Broken Wornout nonStd others total
123456789
101112131415
P = Tags put R= Tags RemovedPR
Tpm.training
Jishu Hozen – 7 Steps
Step 1: Initial Clean up• Record in the matrix – red & white tags,IA,SOC
Source of Contaminantion
slno contaminant source Why Why why Why countermeasure1234567
InAccessible / difficult to Clean,Lubricate,Inspect,Re-tighten - CLIR
slno Area CLIR Why Why why Why countermeasure1234567
Tpm.training
Jishu Hozen – 7 Steps
Step 1: Initial Clean up
Countermeasure Plan for Red/ white/ IA/ SOC
slno abnormality Tgt Dt Resp12345678
Action Plan
0
5
10
15
20
25No of tags
Failure Setup Yield Defect Motion
Tags linked to losses
Tpm.training
Jishu - HozenSteps for developing
2. Countermeasures for sources of problems and difficult places
• Eliminate causes for dirt and dust.
• Improve places which are difficult to clean, lubricate, and re-tightening of bolts and nuts.
• Reduce time for clean-up and oiling.
Tpm.training
Tpm.training
Jishu Hozen – 7 Steps
Step 2: Countermeasures for SOC/IA/others
a. Taking actions on all abnormalitiesb. eliminating difficult to access areasc. Eliminating SOC d. Machine ‘ CLEAN Without Cleaning’ statuse. Various kaizens implementedf. Machine ready for tentative standard preparationg. Step2 audit passed
Tags Put Vs Removed - cumulative for HSL9
0
50
100
150
200
250
Aug-04 Sep-04 Oct-04 Nov-04 Dec-04 Jan-05
No of tags
Tags put Tags removed
Tpm.training
Before After
JH 2nd step
Easy to clean / Hard to access area
Tpm.training
Before After
JH 2nd StepEasy to lubricate
Tpm.training
Before After
JH 2nd step
Easy to inspect and adjust
Tpm.training
Jishu - HozenSteps for developing
3. Establishing Tentative Standards for “Jishu-Hozen”
• Make temporary procedures or manual of Autonomous Maintenance for cleanup, lubrication, re-tightening, checkups.
• (Specify the time allocation for various maintenance daily or regularly held.)
Tpm.training
Tpm.training
Jishu Hozen – 7 Steps
Step 3: Preparation of Tentative standards
a. Making a list of Cleaning, Lubrication,Inspection & Re-tigthening pointsb. arriving at method and frequency of CLIRc. dividing the CLIR into mahine zonesd. Preparation of standards chart with visual aidse. Education of operators on standardsf. Practising the standards for minimum 1 monthg. Update new check pointsh. Have step 3 audit Passes
Tpm.training
Jishu Hozen – 7 StepsStep 3: Preparation of Tentative standards
JH Tentative Checksheets
MONTH : M/ C NO :
SL NO
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
RUNNINGSTOPPED1 CLEANING RUNNING STOPPED
1.1Clean front side of machine ü Dy 60 Oper
1.2 Clean burrs in bedü
Wk 300 Oper
1.5.Clean coolant tank ü
Dy 60 oper
2 INSPECTION2.1 Hyd.oil level (should be in green band) ü Dy 10 Oper Top up oil
2.3 Lub.oil level ü Dy 10 Oper Top up oil
Lub oil pressure(Within green band ) ü Dy 10 Oper Inform
supervisor2.4 Hyd.system pressure (green band) ü Dy 10 Oper
Inform supervisor
2.6 Abnormal noise ,heat in hydraulic motors ü Daily 30 Oper Inform
supervisor2.6 Abnormal noise ,heat in coolant motors ü Daily 30 Oper Inform
supervisor2.6 Abnormal noise ,heat in lub motors ü Daily 30 Oper Inform
supervisorCheck lub oil pressure(within green band) ü Daily 10 Oper Inform
supervisor2.1 Cutting oil level (should be in green band) ü Daily 10 Oper Inform
supervisor
RESP
ACTION IF ABNORMA
L
M/ C STATUS
DATEACTIVITY HOW
FREQ
TIM
E (S
EC)
Tpm.training
Jishu - HozenSteps for developing
4. Overall Inspection
• Training in check-up skills through checkup manuals.
• Find and restore slight defects through general inspection.
Tpm.training
Jishu Hozen – 7 StepsStep 4: Preparation of General Inspection
Bolts & Nuts Pneumatics Hydraulics Electrical Drives Fits/tolerances Safety Process
condition
2
TopicsSl
No. Emp. No. Name M/c No
11
3
4
5
6
7
8
9
10
JH Step 4 Training
1
Tpm.training TVS-SUZUKI
Tpm.training
Tpm.training
Tpm.training
Jishu - HozenSteps for developing
5. Autonomous Inspection
• Formulation and implementation of clean-up and oiling lubricate criteria and autonomous inspection check sheet which can be performed efficiently and positively.
Tpm.training
Jishu - HozenSteps for developing
6. Standardization• Standardize various types of field management items. Establish the system to thoroughly maintain and control them.– Establish logistics standard– Standardization of data records– Standardization of die, tool and
jig management– Process quality assurance
standard, etc.
Tpm.training
Jishu - HozenSteps for developing
7. Autonomous Management
• Continue to develop corporate policy and commitment target and conduct “Kaizen” activities regularly, and record the data analyzed through MTBF to improve the equipment.
Tpm.training
TPM Vs initiatives at Wada
sixsigmacomm.eff
scrap redn d/t redn
Meas.Print
cust.Compl.
Vendor Dev. RTY ImpCOQ HMP GMP Tool.Imp M/c Imp
Spares.Mgmt Projects
1 KK
2 JH
3 QM
4 PM
5 Otpm
6 E&T
7 SHE
8 Ifc
9 Ttpm
TPMDouble E initiatives Quality Initiatives Projects