tpm training
Post on 13-Sep-2014
4.139 views
DESCRIPTION
TRANSCRIPT
![Page 1: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/1.jpg)
Slide 1
Total Productive Maintenance
TPM
Overview
Dave Hoyte, CEOJL French Corporation
![Page 2: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/2.jpg)
Slide 2
TPM as a Lean Initiative
• Competitive costs require– Spending control– Defect control – Downtime reduction
• TPM = Total Productive Maintenance– Proactive (with all employees involved)– Preventive– Predictive– Planned
![Page 3: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/3.jpg)
Slide 3
Why Change?
• ACTIONS:– Reduce defectives / scrap– Reduction of lost production time– Lowest possible cost by reducing waste
![Page 4: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/4.jpg)
Slide 4
Lean System
5S Visual Factory
T P MStandardized
Work
Leadership by Example & CommitmentIn-Station Process Control
Lean Measures
Employee Involvement & Mutual Respect
Pull system / flow production
Peak Performance
Variation reduction / Six Sigma
Continuous Waste ReductionRapid Changeover / Customer-driven lot size
![Page 5: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/5.jpg)
Slide 5
7 Wastes
• Transportation• Excess production• Added processes• Motion
• Waiting• Inventory• Non-conformance (defectives)
![Page 6: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/6.jpg)
Slide 6
Causes of Waste• Excess Manning
– Poor layout and material presentation– Rework and extra processes – Inconsistent / inefficient work methods
• Excess Downtime– Tooling condition – Unreliable equipment– Long changeovers– Incapable process
• Defectives - Rework or Replace– Incapable processes or process not compatible with
customer expectations or design spec (design for mfg)
– Tooling condition– Operator methods and errors
![Page 7: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/7.jpg)
Slide 7
Causes of Waste• Excess Manning
– Poor layout and material presentation– Rework and extra processesRework and extra processes – Inconsistent / inefficient work methods
• Excess Downtime– Tooling condition Tooling condition – Unreliable equipmentUnreliable equipment– Long changeovers– Incapable processIncapable process
• Defectives - Rework or Replace– Incapable processes or process not compatible with
customer expectations or design spec (design for mfg)– Tooling conditionTooling condition– Operator methods and errors
![Page 8: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/8.jpg)
Slide 8
Effective TPM Eliminates 5 Losses
1. Equipment breakdowns2. Defects, scrap, and rework3. Safety Issues4. Mini stoppages5. Reduced speed
![Page 9: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/9.jpg)
Slide 9
What is TPM??
1. Starts with 5S / Visual Factory2. Builds a comprehensive Downtime Database by
cause, frequency, and duration3. Predicts and prevents downtime by PM system 4. Expands role of Operator as first point of early
warning and prevention5. Develops Professional Maintenance skills
TPM is a Lean tool to optimize the effectiveness of manufacturing equipment and tooling.
![Page 10: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/10.jpg)
Slide 10
1
234567
Operator Autonomous Maintenance
Countermeasures for Contamination
Initial Standards
General Inspection
Autonomous Inspection
Standardization
Aut. Mgt.Seven Steps of TPM
7
6
5
4
3
2
1Initial Clean-up
![Page 11: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/11.jpg)
Slide 11
TPM is Planned, Predictive, & Preventive
1. Starts with 5S / Visual Factory2. Builds a comprehensive downtime data
base by cause, frequency, and duration3. Predicts and prevents downtime by PM
system 4. Expands role of Operator as first point of
early warning and prevention5. Professional Maintenance
![Page 12: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/12.jpg)
Slide 12
5S5S Workplace
SSortort (organize)SShinehine (clean) SSet in order et in order (make orderly and neat)SStandardizetandardize (visual place for everything)SSustainustain (maintain the system)
A safe, clean, orderly workplace is fundamental to quality, efficiency, and teams
![Page 13: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/13.jpg)
Slide 13
TPM starts with 5S
• You can’t see problems clearly when the workplace is in disarray
• Cleaning and organizing the workplace helps the team to uncover problems
• Making problems visible is the first step of improvement
• Clean machines and workplace create pride & Safety
![Page 14: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/14.jpg)
Slide 14
Downtime Visual Controls
• Visual or audio alerts – Abnormality obvious at a glance (e.g. stoppage,
reject, control fault)– Alerting Maint and team leaders– Provide real time “scoreboard” for employees
• Machine down light visible from aisle• Production status board (e.g. actual counts vs. goal)• Scrap counts and downtime minutes • Located in clear view in shop (not in control room)• Simple, self regulating, & employee managed
![Page 15: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/15.jpg)
Slide 15
TPM is Planned, Predictive, & Preventive
1. Starts with 5S / Visual Factory2. Builds a comprehensive
downtime data base by cause, frequency, and duration
3. Predicts and prevents downtime by PM system
4. Expands role of Operator as first point of early warning and prevention
5. Professional Maintenance
![Page 16: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/16.jpg)
Slide 16
Downtime Database
• Categorize at a minimum by Equip, Tooling, C/O, Other• Segmented bar graph for E-T-O lost time• Subcategories for Equip (e.g.)
– Hydraulic / pneumatic– Mechanical / lubrication– Electrical / controls– Shot-end components
• Subcategories for Tooling (e.g.)– Slides– Cores– Inserts– Ejector pins
• Subcategories for Other (e.g.)– Operator error– Materials
![Page 17: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/17.jpg)
Slide 17
Minimum Downtime Tracking
0
20
40
60
80
100
120
Minutes
1Q02 2Q02 Jun Jul Aug Sep Oct Nov Dec
Downtime by Cause 3500 ton Bay(avg min/shift per Machine)
OTE
Equip
Tools
Other
![Page 18: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/18.jpg)
Slide 18
TPM is Planned, Predictive, & Preventive
1. Starts with 5S / Visual Factory2. Builds a comprehensive downtime data
base by cause, frequency, and duration
3. Predicts and prevents downtime by PM system
4. Expands role of Operator as first point of early warning and prevention
5. Professional Maintenance
![Page 19: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/19.jpg)
Slide 19
Predictive Maintenance Tools• Rate/hr vs. target or historical normal output (B/W)• Database
– MP2 / maintenance history– statistical probability (frequency & duration)
• Physical prediction of impending failure– Sound (bearing)– Temperature (cooling water)– Flash (core pins) – Shot monitoring system – SPC on part geometry – Hydraulic pressure (ejector pins)– Spindle loads (amps) – Fluids / Lubrication analysis (milipore)– Vibration Signature Analysis
![Page 20: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/20.jpg)
Slide 20
Preventive Maintenance System• History of downtime by major machine & tool
– Downtime measurement & tracking– Mean Time Between Failures– Average downtime– Pareto of causes at component level (eg L/S or temp sensor)– Cost to maintain
• Develop PM cards based on frequency of failure and magnitude of average lost time (start small & grow)– Limit & prox switches– Shot tip / sleeve– Critical frame and cylinder mounting bolts– Expendable tools– Valves, hoses, packing, seals
• PM’s have instruction, schedule/frequency & sign-off – PM’s / repairs done in window of opportunity when machine is down– Cycle count or date based execution of PM’s (eg cutter change)– PM status visual (work completed / not completed)
![Page 21: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/21.jpg)
Slide 21
TPM is Planned, Predictive, & Preventive
1. Starts with 5S / Visual Factory2. Builds a comprehensive downtime data base by
cause, frequency, and duration3. Predicts and prevents downtime by PM system
4. Expands role of Operator as first point of early warning and prevention• One point lessons for operator awareness• Creates OMP (Operator - Maintenance
Partnership)• Operator performs checks, problem
solving, and improvements5. Professional Maintenance
![Page 22: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/22.jpg)
Slide 22
TPM
Production Operators• Clean & Check• Observe• Categorize
Manufacturing Engineers• Equipment Planning• Equipment Studies
Production Planning & Control
• Schedule P.M.
Quality Engineers• Standards &
Calibrations
ActivePlanned
MaintenanceProcess
![Page 23: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/23.jpg)
Slide 23
OMP - Operator Maintenance Partnership
• Operator training in TPM• Operator basic equip inspection
& tooling checks• Operator basic cleaning• Operator lubrication check• One point lessons (capture
knowledge)• TPM Board & TPM Tags
(proactive operator involvement)
TPM
![Page 24: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/24.jpg)
Slide 24
TPM Tag System
• Problem communication tool to and from maintenance, tool room, and production– Identify abnormal machine conditions
• Record problem discovered by operator• Record problem found during scheduled PM
– Status tracking system of requested repairs– TPM visual management tool (hang tags)– Repair history for future problem solving
• TPM Tag used for recording problem & fix– Blue Tag-Operator or Maint responsible to repair– Red Tag- Safety-related request (priority)
![Page 25: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/25.jpg)
Slide 25
Operator/Supervisor Production Management Maintenance
1. Abnormality Identified
2. Fill out Tag Red= Safety Blue= Prod/Maint
3. Hang C-tag as close to the defect as possible
4. Hang A &B Tags on the TPM Tag status board by Machine location and area of responsibility to correct.
5.Maintenance evaluates problem. If fixed immediately go to 6. If parts or time needed, maint pulls A tag from board. The A tag is MWO. The B tag is posted on the Maint WO status section of the TPM Board with est. timing.
7. Operator/Supervisor check to see if work was done.
6.After work is completed, maintenance completes back side of A tag and places both the A & B tag in the work completed box
8. If OK, Operator/ supervisor removes C tag from machine and places ABC tags in Completed box. If not OK, tags stay and maint is contacted. Contact noted on tag.
9. Production management reviews the information. Also reviews the comments and takes actions if required. Places tag in history file box located in the office
Tag information is recorded and reviewed for continuous improvement of PM database by Production and Maintenance; Repeat operator tags may indicate Maint needs to investigate.
Tag Process
![Page 26: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/26.jpg)
Slide 26
TPM is Proactive, Predictive, Preventive & Planned
1. Starts with 5S / Visual Factory2. Builds a comprehensive downtime data
base by cause, frequency, and duration3. Predicts and prevents downtime by PM
system 4. Expands role of Operator as first point
of early warning and prevention
5. Professional Maintenance
![Page 27: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/27.jpg)
Slide 27
Professional Maintenance
• Equip Safety• Skill building• Cross-training• Area Maintenance• WC MRO stores• Maint Mgmt System• Down alarms• Radios • Planned PM
![Page 28: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/28.jpg)
Slide 28
1
234567
Operator Autonomous Maintenance
Countermeasures for Contamination
Prepare Temporary Standards
General Inspection
Autonomous Inspection
Standardization
Aut. Mgt.
7 Steps
7
6
5
4
3
2
1Initial Clean-up
OIL
T P M
![Page 29: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/29.jpg)
Slide 29
TPM
5S
TPM IStep 1Step 2Step 3
TPM IIStep 4 Step 5Step 6Step 7
Initial Focus
prerequisite for TPM I
![Page 30: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/30.jpg)
Slide 30
STEP 3: Prepare Temporary Standards
This step is to enhance the equipment reliability & maintainability.• Temporary Check Sheet For Clean-Up, Lubrication, Start-up, and Shut-down:
– What items need to be done– Who will perform the check– How often to check– Where the location is to be checked– What to use for the inspection or cleaning– Target time to complete the task
![Page 31: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/31.jpg)
Slide 31
TPM Summary
• TPM = Total Productive Maintenance– Proactive (all employees
involved)– Preventive– Predictive– Planned
• TPM is an integral part of JLF Total Quality production System
5S Visual Factory
T P MT P MStandardized
Work
Continuous Waste Reduction
Peak Performance
![Page 32: Tpm training](https://reader035.vdocuments.us/reader035/viewer/2022081715/541360758d7f7299698b45ba/html5/thumbnails/32.jpg)
Slide 32
TPM is a Lean tool for Quality and Productivity