  • Townsville Enterprise Limited –

    September 2020

  • Precinct Objectives

    1. Best practice, low emission, energy efficient ecologically

    sensitive industrial development

    2. Innovative and dynamic enterprises that support the

    creation of new job opportunities for Townsville

    residents

    3. Co-location of industrial uses, such as advanced

    manufacturing, processing and technology, with

    supporting and complementary enterprises that grow

    the domestic and international profile of Townsville

    4. Minimising adverse amenity impacts upon lands outside

    the precinct.

  • DriveIt NQ

    • Community-led, multi-user motorsport

    and driver education facility

    • Development approval issued May 2019

    • Over half of total project funding

    secured:

    - $5M – Federal Government (spending underway)

    - $7M – Federal Government (election

    commitment)

    Next steps:

    • Complete Stage 1 works (base race

    circuit, off road rally circuit, driver training

    office and ablutions, site services)

    • Stage 1 completion forecast ~ November

    2020Footage of circuit grading captured November 2019 looking

    south-west to Manton Quarry

    Approved overall site layout

  • Imperium3

    • Consortium of Magnis Resources,

    Boston Global, Ausenco, Siemens and

    C4V

    • 18Gwh lithium-ion battery

    manufacturing facility over three stages

    • Feasibility Study approved August 2020- 21% IRR and NPV of $2.55B

    - 1150 direct jobs at full operation

    - Stage 1 capital investment: A$1.12B

    - NAB exclusive financial advisor to project

    Next steps:

    • Development approvals

    • Project funding with NAB as financial

    advisor

    • Offtake agreements

    Imperium3 site office and manufacturing sheds

  • Pure Minerals

    • “Townsville Emerging Chemicals Hub (TECH)

    Project”

    • 600ktpa nickel ore refining facility

    • Products for battery material development:- 25,000tpa nickel sulphate

    - 3,000tpa cobalt sulphate

    - 221,000tpa hematite

    - 8,700tpa high purity alumina

    • Use of Direct Nickel (DNi) process (trademarked) –

    recycling of nitric acid (lower opex)

    • Ore supply chain established with New Caledonia

    • 289ha of land conditionally committed to project

    at Lansdown

    Next steps:

    • Definitive Feasibility Study by end of Q4 2020/2021

    • Development Application preparation underway

  • Edify Energy

    Majors Creek Solar Farm

    • Approved 200MWac (expandable to 800MWac over project life) solar farm

    o 4km from Precinct – low-cost, locally-generated, behind-the-meter power to

    industrial users

    o Battery storage and connection to the national network via 275kv (high

    voltage) Powerlink lines through site

    o MOUs in place with neighbouring Pure Minerals and Imperium3

    Project HyPER (Hydrogen Production from Electric Renewables)

    • A 10 MW electrolyser pilot plant (up to 1350 tonnes of hydrogen

    produced) with intent to prove technology and scale up to commercial

    production with a 50MW-200MW electrolyser facility (up to 27,000

    tonnes)

    • Over $500M combined capital investment for both projects

    Next steps:

    • Development application for private transmission network to Lansdown –

    lodgement early 2021

    • Further proof of concept and design of Project HyPER

    Hamilton Island Solar Project

  • Benefits

    Enabling the initial precinct users alone will unlock:

    • $4 billion - Value of private sector capital investment

    • 1400 - Direct Jobs

    • >9000 - Indirect jobs in upstream and downstream supporting

    industries regionally

    • Completion of DriveIT NQ which will inject over $1.4 billion into

    the NQ economy over the next 40 years when fully operational

    • Significant economies of scale by attracting further private

    investment in advanced manufacturing, hydrogen and high-tech

    processing facilities.

  • For more information: www.townsville.qld.gov.au

    Contact:

    Townsville City Council

    13 48 10

    [email protected]