Town of Milliken
June 8, 2015: Regulation #38 South Platte Basin RMH
June 15, 2015: Completion of Alternate Supply evaluation report
December 2018: Temporary Modification RMH
December 2019: Temporary Modification RMH
December 31, 2020: Proposed selenium Temporary Modification expires
July 15, 2015: Completion of detailed study plan for fish survey
2016: Likely Milliken RO Discharge permit renewal
2015: Conduct initial phase of fish survey study
Town of Milliken
June 8, 2015: Regulation #38 South Platte Basin RMH
June 15, 2015: Completion of Alternate Supply evaluation report
December 2018: Temporary Modification RMH
December 2019: Temporary Modification RMH
July 15, 2015: Completion of detailed study plan for fish survey
2016: Likely Milliken RO Discharge permit renewal
2015: Conduct initial phase of fish survey study
Basis for Selenium Temporary Modification
• Demonstrated permit compliance problem
• Significant uncertainty (Type A and B)
• Ambient-based value = 12.3 µg/L
Town of Milliken
Summary of Proposal
• Revise the existing temporary modification for dissolved selenium from a numeric value of 13.1 µg/L to a numeric value of 12.3 µg/L.
• Extend the temporary modification from December 31, 2015 through December 31, 2020