Soft WareTesting:
Why did you choose this Course?* 1. Scope of getting job is very high.
2. No need to depend up on any technologies.3. Testing remains forever4. I want to be consistent through out my life
Why explicitly the s/w companies arerecruited the test engineers?
1. One person cannot efficiently perform two tasks at a time2. Sentimental attachment.
Who can do the course?Any graduate can do this course at this point of time
What exactly we require to get a job?1. Stuff2. Communication skills3. Confidence4. Dynamism
Project:Project is some thing that is developed based on the particularcustomers requirements and used by that customer only ( E.g.:Marriage laddu)
Product:It is some thing that is developed based on the companies specification and
used by the multiple customers (e.g.: Thirupathi laddu)Quality:Classical definition for quality: - Quality is defined as justification of all therequirements of customer in a product.
NOTE: Quality is not defined in the product; it is defined in the customers mind
Defect: - Defect is defined as deviation from the requirements
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
2/97
Latest definition for quality: - quality is defined as not only the justification ofrequirements but also the presence of value (User friendliness) Testing:
Testing is processes, in which the defects are identified, isolated, subjected
for rectification & ensure that the product is defect free. In order to produce the
quality product in the end and hence customer satisfaction.
Bidding the Project:Bidding the project is defined as request for proposal, estimation and signing
off (Official agreement).
Kick Off Meeting:It is an initial meeting conducted in the soft ware company soon after the
project is signed off. In order to discuss the overview of the project and to select a
project manager for the project.
Usually high level management, Project managers, team managers, quality
managers, team leads and quality leads will be involved in this meeting.
PIN (Project Initiation Note):-It is a mail prepared by the project manager and sent to the CEO of the soft
ware company in order to get the permission to start the project developments.
Software Development Life Cycle (SDLC):-SDLC contains six phases they are
1. Initial phase or requirements phase.
2. Analysis phase
3. Design phase
4. Coding Phase
5. Testing Phase
6. Delivery & Maintenance Phase.
I. Initial Phase or Requirements Phase :(a) Tasks: Interaction with the customer and gathering the requirements.
(b) Roles: Business Analyst (B.A), Engagement Manager (E.M)
Process: First of all the business analyst will take an appointment from thecustomer, collects the templates from the company, meets the customer on
appointed day, gathers the requirements with the help of template and comes back
to the company with the requirements documents.
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
3/97
Once the requirement document has come to the company the
engagement manager will check whether the customer gives any extra requirements
or confused requirements. In case of extra requirements he deals the excess cost of
the project. In case of confused requirements he is the responsible for prototype
demonstration and gathering the clear requirements.
Proof: The proof document of this phase is Requirements Document. This iscalled with different names in different companies.
1. FRS (Functional Requirements Specification)
2. CRS (Customer Requirement Specification)
3. URS (User Requirement Specification)
4. BDD (Business Design Document)
5. BD (Business Document)
6. BRS (Business Requirement Specification)
Some companies may maintain the over all business flow information in one
document and the detailed functional requirement information in the other
document
Templates: It is a pre defined format, which contains the predefined fields, andused for preparing a document in an easy, comfort and perfect manner.
Prototype: -Defined as a roughly & Rapidly developed model which is used fordemonstrating to the client, In order to gather the clear requirements and to win the
confidence of a customer.
II. Analysis Phase:
(a) Tasks:
1. Feasibilty Study
2. Tentative planning
3. Technology Selection
4. Requirement Analysis
(b) Roles: System Analyst, Project Manager, and Team Manager.
Process
1. Feasibility Study: - It is detailed study of the requirements in order tocheck weather the requirements are possible or not.
2. Tentative Planning: In this section the resource planning and the timeplanning (scheduling) is done temporarily.
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
4/97
3. Technology Selection: - The list of all the technologies that are requiredto accomplish this project. Successfully will be analyzed and listed out in this
section.
4. Requirement Analysis: - The list of all the requirements that arerequired to accomplish this project. Successfully will be analyzed and listed
out here in this section.
SRC- System requirement specification
Proof: - The proof of this phase is system Requirement specification.
III. Design Phase: -
Tasks:
1. High level designing
2. Low level designing
Roles: High-level designing is done by the chief Architect & Low leveldesigning is done by the Technical Lead
Process: The Chief architect will be drawing some diagrams using unifiedmodeling language in order to divide the whole project in to modules.
The Technical lead will also draw some diagrams in order to divide the
modules in to sub modules.
The technical lead will also develop the PSEUDO code in order to make
developers comfortable while de3veloping the actual code.
Proof: The proof document of this phase is Technical design document.
IV. Coding phase:
(a) Task: Developing or Programming
(b) Roles: Developers or Programmers
Process: Developers will develop the actual code by using the technical designdocument as well as following the coding standards like Proper indentation, color
coding, proper commenting and etc..,
Proof: The proof document of this phase is source code Document.
E.g.: The programmer will develop some programs every one will develop his
program in different colors but the soft ware companies will ask the developers to
develop the program according to the company standards using proper color,
coding, commenting. So as to understand it [email protected] 4
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
5/97
V. Testing Phase:
(a) Task: Testing
(b) Roles: Test engineers
Process:
1. First of all the test engineers will collect the requirements
document and try to understand all the requirements
2. While understanding it at all they get any doubts they will
list out all of them in a review report.
3. They will send the review report to the author of the
requirements document for clarifications.
4. Once the clarifications are given and after understanding
all the requirements clearly, they will take the test casetemplate and writes the test cases.
5. Once the first build is released then they will execute the
test cases
6. If at all any defects are found. They will list out all of them
in a defect profile template then
7. They will sent the defect profile document to the
development department and then will be waiting for the
next build to be released.
8. Once the next build is released then they re-execute the test
cases.
9. If at all any defects are found they will update the profile
document and sent it to the development department and
will be waiting fro the next build to be released.
10. This process continuous till the product is defect free.
Proof: The proof of the testing phase is Quality Product.
Test Case: (def) Test case is an idea of a test engineer based on the customersrequirements in order to test a particular feature or a function.
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
6/97
VI. Delivery & Maintenance Phase:
Delivery:
(a) Task: - Installing the application in the clients environment
(b) Rolls: -Deployment engineer or senior test engineers.
Process: - The senior test engineer or deployment engineer will be going to the
clients place and install the application in their environment with the help of the
guidelines provide in the deployment document.
Maintenance:
After delivering the soft ware while using if at all any problem occurs
then that problem becomes a task, based on that problem corresponding roles will
be appointed, the roles will defined the process and solve that problem.
Some clients may request for the continuous maintenance in such situations a
group of people from the software company will be continuously working on the
clients place and taking care of the soft ware.
************************^^^^^^^^^^^^^^^^^^^************************
Where exactly the testing comes in to picture?Which sort of testing you are expecting?How many sorts of testing are there? There are two sorts of testing.
1. Un-conventional testing
2. Conventional testing
1.Un-conventional Testing: -Unconventional testing is a sort of testing done bythe quality assurance people, in which they test each and every out come document
right from initial phase of the SDLC (Soft ware development life cycle)
2. Conventional Testing: It is sort of testing done by the test engineers on theapplication in the testing phase of SDLC.
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
7/97
Testing Methodology or Testing techniques:There are three methods of testing
(a) Black-Box Testing
(b) White-Box Testing
(a) Grey-Box Testing
(a) Black-Box Testing: If one performs testing only on the functional part ofan application with out having any structural knowledge then tat method of
testing is known as Black-Box testing, usually the test engineers perform it.
(b) White-Box Testing: If one performs testing on the structural part of anapplication then that method of testing is known as white box testing, usually
the developers or white box testers perform it.
(c) Grey-Box Testing: If one performs testing on both the functional part aswell as the structural part of an application then that method of testing as
known as gray box testing using the test engineers who have structural
knowledge will perform gray- box testing.
Levels of Testing:There are five levels of testing
1. Unit Level Testing
2. Module Level Testing
3. Integration Level Testing
4. System Level Testing
5. User Acceptance Testing (U.A.B)
1. Unit Level Testing: -
It is a level of testing in which one will perform testing on the units. It is a
white box testing and usually developers or white box testers will perform.
2. Module Level Testing: -
Module: Module is defined as a group of related functionalities to perform a majortask
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
8/97
It is a level of testing in which one will perform testing on the modules. It is a black
box testing and usually test engineers perform it.
3. Integration Level Testing: -
It is a level of testing in which the developers will develop some interfaces tointegrate the modules and test whether the interfaces are working fine or not. It is a
white box testing usually developers or white box tasters perform.
The developers may follow one of the following approaches while integrating
the modules.
1. Top-down approach
2. Bottom up approach
3. Hybrid or Sandwich approach
4. Bigbang approach
1. Top-down approach: - In this approach one will develop the parent modulesfirst and then integrate them with the related child modules
2. Bottom-up approach: - In this approach one will develop the child modulesfirst and integrate them to the parent modules
3. Hybrid approach Or Sandwich approach:- This is a mixed approach ofboth the top down and bottom up approaches
4. Big bang approach:-In this approach one will wait till all the modules areready and finally they will integrate all the modules at a time
STUB: - While integrating the modules in top down approach if at all anymandatory module is missing then that module is replace with a temporary
program known as STUB
DRIVER: -While integrating the modules in bottom up approach. If at all anymandatory module is missing then that module is replaced with a temporary
program known as DRIVER
4. System Level Testing:
It is a level of testing in which one will install the complete application in to
the environment and then perform testing on it. At this level different types of
testing will be done one among those is system integration testing.
5. System integration Testing: -
It is a type of testing in which once the complete application is developed one
will perform an action at one module and checks for the reflections at the
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
9/97
corresponding modules. It is a black box testing and usually test engineers
perform.
6. User- Acceptance Testing: -
It is the level of testing in which one will perform the same system testing inthe presence of the user in order to make him accept the application. It is a black
box testing and usually Test engineer performs it.
Environment: - Environment is a combination of three layers (e.g.: Yahoo)
a. Presentation layer
b. Business layer
c. Data base Layer
System: The application installed in to an environment combinable called as system.
a. Presentation Logic: The logic that is used for viewing application isknown as presentation logic
b. Business Logic: - The logic that is used for performing the operations onthe application is known as business logic.
c. Data Base Logic: - The logic that is used for sharing and retrieving thedata is known as database logic.
Types of Environment: - There are four types of environments
a. Stand alone environment or One-tier environment
b. Client server environment or Two-tier Architecture
c. Web environment or Three-tier Architecture
d. Distributed environment or N-tier Architecture
a. Stand Alone environment: -
In this type of environment all the three layers that is presentation
layer, Business layer& Database layer will be present in al single tier.
This type of environment is suitable for single user application.
One-Tier Architecture
PL
BL One tier ArchitectureDBL
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
10/97
b. Client server environment:
In this type of environments there will be two tiers, one tier is for
clients and other tier is for database servers. The presentation layer
and the business layer will be present in each and every client . The
database layer will be present in the database server. This type of
environment is suitable for multi user application in a single or a
limited area.
Two tier Architecture
PL+BL DBL
PL+BL
PL+BL
Clients Server
c. Web environment: - In his type of environment three tiers will be there. One is
for clients the middle one is for application server and the other one is for
database servers. Presentation layer will be present at clients, Business layer
will be present in the application server, and database layer will be present at
the database servers. This type of environment is suitable for the applications
that are used all over the world by limited number users
Three-tier Architecture:
PLDBL
BLPL
DBLPL
[email protected] 10Clients Appl Server Database server
mailto:[email protected]:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
11/97
Web server: -It is software, which provides web services to the clients.
E.g.: - Internet Information service (IIS).
Example for Application servers: Tom pact, Web logic, web sphere etc..,
d. Distributed environment: -It is similar to the web environment but the number of application
servers are increased and represented in individual tiers in order to
distribute the business logic so that the logic will be distributed.
N-tier Architecture:
PL DBL
BL BL BLPL
PL
PL
******************^^^^^^^^^^^^^^^^^^^^^^^********************************
Clients Apl server1 Apl server2 Apl server2 Database serv
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
12/97
Software Development Models: -
1.Water Falling Model
Advantages:It is a simple model
Project monitoring & maintenance is very easy
Drawbacks:[email protected] 12
INITIAL
ANALYSIS
DESIGN
CODING
TESTING
DEL&MAINT
Sys.design
S/w design
Implementation
Black box testing
Delivery toclient
Req.gathering BRS
SRS
TDD, GUI
Unit testInt. test
Mod Test
Sys.Test.UAT
UTR
UTR
UTR
UTR
UTR
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
13/97
Con not accept the new requirements in the middle of the project
(b) Prototype Model: -
Advantages: -Whenever the customer is not clear with the requirements this is the best
suitable model for gathering the clear requirements.
Drawbacks: - It is not a complete model Prototype has to be built on companies cost User may limit his requirements by sticking to the prototype.
(B) Evolutionary Model: -
Advantages: -Whenever the customer is evolving the requirements this is the best
Suitable model.
Drawbacks: - Cannot define the dead lines
Project monitoring & maintenance is very difficult
No Transparency (No clear)
Unclear Req
Prototype
SRS Doc
Base lined
Client environment
confirmation
H/W rotot e
S/WProtote e
BRS DOC
H/W rotot e
H/W rotot e
REQ.are
Refined
Initial Req
Dev.
Application User
validation
Useraccept
Appl is Base lined
Feed back with
new Req.
N
Y
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
14/97
Spiral Model: -
Advantages: -This is the best suitable for developing the highly risk based project
(scientific projects)
Drawbacks: - Risk analysis and estimation is not an easy task
It is a costly model
It is a time consuming model
(C) Fish Model: -
Advantages: -This is the best suitable for developing the highly risk based project(scientific projects)
Drawbacks: -o Time consuming Model
o Costly model
Risk Root cause
analysisEstimation
Contingencies
Defining the objectives/WA/Constraints
Refining &
planning for thenext cycle
Implementation
SRS HLD
LLD SCD
eq. Gathering
RS Review
SRS Review TDD Review White boxtesting
Black Box
testing
Analysis Design Coding
Delivery &
Maintenance
Test S/W
Changes
Sys testing
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
15/97
Verification: -It is a process of checking conducted on each and every role of the organization in order to
check whether they are working according to the guidelines or not right from the starting
of the process till the ending of the process
Validation: -
It is a process of checking conducted on the developed product in order to check whether it
is working according to the requirements or not.
(D) V-Model: -
BRS Preparing proj plan
SRS Preparing Test plan
Req.Phase testing
Design Phase testing
TDD Program phase testing
Test SCD
S/W Build System testing
Test management ProcessTesting User acceptance testing
Port Testing
S/W efficiency
DRE=A/A+BDRE=A/A+BDelivery & Maintenance Test S/W changer
Advantages; -AS verification and validation as well as test management process is done the out
come will be a quality product.
Drawbacks: -o Time consuming mode
Initial& design
Phase
Design &
coding
Verification
Validation
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
16/97
o Costly model
DRE: Defects removal efficiency
End of the Basic part
Testing part to be continued.
1. Build Acceptance Testing Or Build Verification Testing Or Sanity
Testing: -
It is a types of testing in which one will conduct over all testing on the released build
in order to check whether it is proper for further detailed testing or not. Even some
companies call it as smoke testing, but some companies says that just before releasing the
build the developers will conduct the overall testing on the build that is known as smoke
testing and once the build is released what ever the test engineers do in order to accept thebuild is known as B.A.T or B.V.T or Sanity Testing.
2. Regression Testing: -
It is a type of testing in which one will perform testing on the already tested
functionalities again and again.
It is usually done in two scenarios.
1. Whenever the testers has raised the defects, rectified by the developers and next
build is released to the testing department then the test engineers will test the
defect functionality as well as the related functionality once again.
2. When ever some new features are incorporated by the developers, next build is
released to the testing department then the test engineers will once again test the
related functionalities of the new features in order to confirm that they are
working same as previous.
Note: - Testing the new functionalities for the first time is known as new testing but notRegression Testing.
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
17/97
3. Re-Testing: -
It is a type of testing in which one will test the same functionality again and again
with different sets of values in order to come to a conclusion whether it is working or not.
4. - Testing (Alpha Testing): -It is a type of user acceptance testing in which the test engineers will test theapplication in our company, in the presence of the customer.
Advantage: - If at all any defects are found then there is a chance of rectifying themimmediately.
5. -Testing (Beta): -It is a type of user acceptance testing done in the clients place either by the end-
users or by the third party testing experts before actual implementation.
Drawback: If at all any defects are found then there is no chance of rectifying them
immediately.
6. Static Testing: -
It is a type of testing in which one will perform testing on the application or
application related factors with out performing any action.
Eg:- Documentary testing, GUI testing, Code reviews and etc.,
7. Dynamic Testing: -
It is a type of testing in which one will perform in the application or its related
factors by doing some actions
Eg: - Functionality testing.
8. Installation Testing: -
It is a type of testing in which one will install the application in to the environmentby following the guide lines provided in the installation document and if the installation is
successful then he will come a conclusion that the given guide lines are correct other wise he
will come to a conclusion that the given guidelines are not correct.
9. Compatibility Testing: -
It is a type of testing in which one may have to deploy the application in to the
multiple number of environments prepared with different combinations of environmental
components in order to check whether the application is compatible with all that
environments. This type of testing is usually done to products.
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
18/97
10. Monkey Testing: -
It is a type of testing in which one will perform abnormal action on the application
intentionally in order to check the stability of the application.
11. Usability Testing: -
It is a type of testing in which one will check whether the application is user friendly
or not and it can be comfortably used by the end user or not.
12. Exploratory Testing: -
It is a type of testing in which one (Domain Experts) will perform testing on the
application with out having the knowledge of requirements but by exploring the
functionality.
13.End-To- End Testing: -
It is a type of testing in which one will perform testing on all the end- to-end
scenarios of the application.
14. Port Testing:-
It is a type of testing in which one will deploy the application in to the clients
environment and check whether it is compatible with that environment or not.
15. Reliability Testing: -It is a type of testing I which one will perform testing on the applicationcontinuously for long period of time in order to check the stability of the application
16. Security Testing: -Its is a type of testing in which one will concentrate on the following areas of the
application
a. Authentication Testingb. Direct URL Testing (Uniform Resource Location)c. Fire Wall Leakage Testing.
(a) Authentication Testing: -It is a type of testing in which one will enter different combinations of usernames
and passwords and try to access the home page in order to check whether only the
authorized persons are accessing the application or not.
(b) Direct URL Testing: -
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
19/97
It is a type of testing in which one will enter the URL of an unauthorized page
directly in the browser and try to access that page in order to check whether it is been
accessed or not.
(c) Firewall Leakage Testing : -It is a type of testing in which one will enter as one level of user and try to access the
other level of unauthorized pages in order to check whether the firewalls are working
properly or not.
17. Mutation Testing: -
It is a type of testing in which one will perform testing on some thing by doing some
changes to it.
18. ADHOC Testing: -
It is a type of testing in which one will perform testing on the application in his ownstyle after understanding the requirements clearly.
The Soft Ware Testing Life Cycle Contains SixPhases
They are
Test Planning
Test Development
Test Execution
Result Analysis
Bug Tracking
Reporting
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
20/97
Plan: -It is a strategic document, which describes how to perform a task in an effective,
efficient and optimized way.
Test Plan: -It is a strategic document, which describes how to perform testing on an application
in an effective, efficient and optimized way.
Optimization: -Optimization is a process of utilizing the available input resources to their max and
getting maximum possible out put.
1.0 Introduction1.1 Objective
1.2 Reference Document
2.0 Coverage Of Testing2.1 Features To Be Testing2.2 Features Not To Be Testing
3.0 Test Strategy3.1 Levels Of Testing
3.2 Types of testing3.3 Test design techniques3.4 Configuration management3.5 Test metrics3.6 Terminology3.7 Automation Plan3.8 List of automated tools
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
21/97
4.0 Base criteria4.1 Acceptance criteria4.2 Suspension criteria
5.0 Test Deliverable
6.0 Test Environment
7.0 Resource Planning
8.0 Scheduling
9.0 Staffing& Training
10.0 Risks & Contingencies
11.0 Assumptions
12.0 Approval Information
1.0 Introduction: -
1.1 Objective: -The Purpose of the document is clearly described here in this section
1.2 Reference Document: -The list of all the documents that are refereed to prepare the test plan will be
listed out her in the section.
2.0 Coverage Of Testing: -
2.1 Features to be tested: -The list of all the features that are to be tested in this phase will be clearly
mentioned here in this section.
2.2 Features not to be tested: -The list of all the features that are not planned for testing based on the
following criteria will be listed out here in this section
a. Out of scope features
b. Low risk features
c. The functionalities that are planned to be incorporated in [email protected] 21
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
22/97
d. The features that are to be skipped based on the time constraints.
3.0 Test Strategy: -
Test strategy is defined as an organizational level term, which is used for
testing all the projects in the organization.
Test Plan: -It is defined as a project level term, which is used for testing a particular
project in the organization.
Note: - Test strategy is common for all the projects but the test plan isspecific for a particular project
3.1 Levels of Testing: -The list of all the levels of testing that are followed by that company are listed
out here in this section
3.2 Types of Testing: -The list of all the types of testing that are followed in that company will be
listed out here in this section.
3.3 Test Design Techniques: -Technique: -
Technique is some thing i.e., used for accomplishing a complex task in an
easy manner.
A list of all the techniques that are used by that company while developing
the test cases will be listed out here in this section.
Eg: - BVA (Banded value analysis)
ECP (Equivalence Class Partition)
3.4 Configuration Management:- To be discussed later
3.5 Test Metrics: -The list of all the metrics that are maintained in that company will be listed
out here in this section
3.6 Terminology: -The list of all the terms and the meaning that are used in that company will
be listed out here in this section
3.7 Automation Plan: -The list of all the areas that are plan for automation in that company will be
listed out here in this section.
3.8 List Of Automated Tools: -
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
23/97
The list of all the automated tools that are used in that company will be listed
out here in this section.
4.0 Base Criteria: -
4.1 Acceptance Criteria: -When to stop testing feeling that enough testing has been done on the
application is clearly described here in this section.
4.1 Suspension Criteria: -When to suspend testing suddenly (abruptly) will be clearly mentioned here
in this section.
5.0 Test Deliverable: -
The list of all the documents that are to be prepared during the testing phase
will be listed out here in this section.
Eg: Test case, defects profile document.
6.0 Test Environment: -
The customer specified environment would be clearly described here in this
section. The same environment will be simulated in the company and will be used
for testing purpose.
7.0 Resource Planning: -
Who has to do what is clearly described here in this section.
8.0 Scheduling: -
The starting dates and the ending data of the each and every task is clearly
planned here in this section.
9.0 Staffing& Training: -
How much staff is to be recruited and what kind of training is to be providedis clearly described here in this section.
10.0 Risks & contingencies (Solution Plans): -
The list of all the potential risks and the corresponding solution plans will be
listed out here in this section.
Example:
Risks:
i. Unable to deliver the soft ware with in dead [email protected] 23
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
24/97
ii. Employees may leave the organization in the middle of the
project
iii. Customer may impose the dead lines.
iv. Unable to test all the features with in the time.
v. Lack of expertisation
Contingencies (solution Plans):
i. Proper plan ensurance.
ii. Employees need to be maintained on the bench.
iii. What not to be tested has to be planned in case of imposed
dead lines.
iv. Severity & Priority based testing.
v. Proper Training needs to be provided.
11.0 Assumptions: -
The list of all the assumptions that are to be assumed by the test engineer will
be listed out here in this section.
12.0 Approval Information: -
Who has to approve what is clearly described here in this section.
USE CASES
Use Cases:Use case is a description of functionality of certain features of an application
in terms of actors, actions& responses
Input information required for preparing the use case Document: -
i. Screen shot
Screen Shots
LLI (Low-levelInformation)
HLI (High levelInformation)
FRS (Functional Requirement Specification)
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
25/97
ii. Functional requirements
iii. Special requirement/Business rules/Validation
iv. Template
i. Screen Shot: -
User name
Password
Connect to
ii. Functional Requirements: -
a. Login screen should contain username, password, Connects To fieldsand login, clear, cancel buttons.
b. Connect to is not a mandatory field but when ever user requires itshould allow him to select a data base option.
c. Up on entering valid username, valid password and clicking on loginbutton corresponding page must be displayed.
d. Up on clicking on the clear button the information present in all thefields must be cleared and the cursor must be available in the user
name field
e. Up on clicking on the cancel button login screen must be closed.
iii. Special requirement/Business ruled/Validation: -
a. Initially whenever the login screen is Invoked Login, clear buttons mustbe disabled.
b. Cancels Button must be always enable.
c. Up on entering user name and password the login button must beenabled.
d. Up on entering some information in to any of the fields the clear buttonmust be enablede. The Tabbing order must be user name, Password, Connect to, Login,
clear, cancel.
iv. Use Case Template:Name Of The Use Case :
Brief Description of Use Case :
Actors Involved :
Special Requirements :
Pre Condition :
Post-Conditions :
Login Clear Cancel
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
26/97
Flow of Events :
Use case: Use case is prepared by BA in the Functional Requirement Specification
(FRS), which are nothing, but a steps, which are given by the customer.
Test Case: It is prepared by the Test Engineer based on the use cases from FRS to
check the functionality of an application thoroughly.
Test Plan: Team Lead prepares Test plan, in it he represents the Scope of the test,
What to test and What not to test, Scheduling, What to test using automation etc.
v. Use Case Document:
Name of the use case: Login use case.
Brief Description of use case: It describes the functionalities of all thefeatures present in the login screen.
Actors Involved: Normal user, Admin User.
Special Requirements: There are two types of special requirements1. Explicit requirements
2. Implicit requirements
1. Explicit Requirements: -
The Requirements that are directly given by the customer are knownas explicit requirement.
2. Implicit Requirement: -The requirements that are analyzed by the business analyst feeling
that they will add the value (user friendliness) to the application are known
as implicit requirements.
List of Explicit requirements: -
Initially whenever the login screen is Invoked Login, clear buttons
must be disabled.
Cancels Button must be always enable.
Up on entering user name and password the login button must be
enabled.
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
27/97
Up on entering some information in to any of the fields the clear
button must be enabled
The Tabbing order must be user name, Password, Connect to, Login,
clear, cancel.
List of Implicit Requirements: -
Initially whenever the login screen is invoked the cursor must be available in
the user name field
Upon entering in valid username, valid password and clicking on log in
button an error message should be displayed Invalid username Please try
again
Upon entering valid username, In valid password and clicking on login
button an error message should be displayed Invalid Password Please Try
again
Upon entering Invalid username, Invalid password and clicking on login
button an error message should be displayed Invalid user name and
password Please try again
Pre-Conditions: Login screen must be available
Post-Conditions: Either home page or admin page for the valid user and errormessage for the invalid users
Flow of Events: There are three flows for the application
1. Main Flow
2. Alternative Flow3. Exceptional Flow
1. Main Flow:Action Response
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
28/97
1. Actor invokes the application.
2. Actor enters valid user name, Valid
password and clicks on login button.
3. Actor enters valid user name, validpassword, selects a database option and
clicks on login button.
4. Actor enters invalid user name Valid
password and clicks on login button.
5. Actor enters valid user name, Invalid
password and clicks on login button.
6. Actor enters both username and
password invalid and clicks on loginbutton.
7. Actor enters some information in to any
of the fields and clicks on clear button.
8. Actor clicks on the cancel button.
1.Login Screen is displayed with the following fields
Username, Password, Connect to, Login, Clear&
cancel.
2. Either home page or admin page is displayed
depending up on the actor entered by authenticating.
3. Authenticates, Either home page or admin page isdisplayed depending up on the action entered with
mentioned data base connection.
4.Go to Alternative flow table 1
5.Go to Alternative flow table 2
6.Go to Alternative flow table 3
7.Go to Alternative glow table 4
8. Go to Alternative flow table 5.
1. Alternative flow table 1: -(Invalid User name)
Action Response
Actor enters invalid user name, validpassword and clicks on login button
Authenticates an error message isdisplayed Invalid User name Please Try
again.
2. Alternative Flow Table 2: -(Invalid Password)
Action ResponseActor enters valid user name, invalid
password and clicks on login button
Authenticates an error message is
displayed Invalid User Password Please
Try again.
3. Alternative Flow Table 3: - (Invalid username & Password)
Action Response
Actor enters invalid user name, invalidpassword and clicks on login button Authenticates an error message isdisplayed Invalid User name and
password Please Try again.
4. Alternative Flow Table 4: - (Clear Click)Action Response
Actor enters some information in any of
the fields and clicks on clear button
All the fields are cleared and cursor is
placed in the user name fields
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
29/97
5. Alternative Flow Table 4: - (Cancel click).
Action ResponseActor Clicks on the cancel button. Login screen is close
Identify the module to which the use case belongs.
Security module.
Identify the functionality of the use case with respect to the total
functionalityAuthentication
Identify the functional points and prepare the functional point document.
Identify the input required to perform testing
Valid & invalid Inputs
Identify the actors involved in the used case
Normal user & Admin user.
Identify whether the use case is linked with any other use case.
Home page and Admin page use cases
Identify the pre conditions
Login Screen mist be available
Identify the post conditions
Either home page or admin page for valid users and error message for
invalid users
Understand the main flow of the application
Understand the alternative flow of the application
Understand the special requirements
Document the test cases for the main flow
Document the test cases for the alternative flow
Document the test cases for the special requirements
Prepare the cross-reference matrix.
Functional Point: -The point where an user can perform some action is known as
functional point.
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
30/97
Testing Process: -FRS FPD MTCD DTCD DPD
FRS- Functional Requirement Specification
FPD-Functional port Document
MTCD-Master Test Case Document
DTCD-Detailed Test Case DocumentDPD-Defect Profile Document
Cross Reference Document: -(Traceably Document)
It is a document, which contains a table of linking information used for
tracing back for the reference in any kind of ambiguous (confusion) or questionablesituation.
Common Tracebility Matrix
Requirement Tracebility Matrix
TCID REQ ID
1
2
3
4
5
6
7
8
1
1
1
2
2
2
2
2
VLD
FPD MTCD DTCD DPD
2
8
7
22
3
5
28 1
5
47
30
UN-Entry
PW-Entry
Login ClickCancel Click
Clear Click
Validate Login
check
Validate CancelCheck
Validate Clear
Check
1
2
34
5
67
VLD
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
31/97
Defects Tracebility Document
DID TCID
1
2
34
5
6
28
32
6596
48
52
Types Of Test Cases:There are two types of test cases if we see broadly they are:
1. GUI Test Cases2. Functional Test Cases
The Functional cases are further divided in to Two types
(a) Positive Test Cases,(b) Negative Test Cases.
Guide Lines fro developing the GUI Test Cases:
Check for the availability of all the objects
Check for the alignments of all the objects up on customer requirements
Check for the consistency of all the objects
Check for the spellings and grammar
Apart from the above guide lines any thing else that can be tested just by
looking with out doing any actions will fall under GUI test cases
Guide Lines for Positive Test Cases:
A test engineer should have positive mind set up
He should consider the positive flow of the application
He should use only the valid Input
Guidelines for developing Negative Test Cases:
A test engineer should have negative mind set up
He should consider the negative flow of the application
He should use at least one invalid input per a set of data
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
32/97
Test Case Template: -
(a) Test Objective
(b) Test scenario(c) Test procedure
(d) Test Data
(e) Test Cases
(a) Test Objective: -The main purpose of the document is described here in this section
(b) Test Scenarios: -The list of all the scenarios that are to be tested will be listed out here
in this section.(c)Test Procedure: -
DEF: It is a functional level term, which describes how to perform
testing on the functionalities of the application.
The plan for testing the functionalities is briefly described here
in this section
(d) Test Data: -The date that is required for testing is made available here in this
section
(e) Test Cases: -
The format of a test case template is given below
TCID TC
TYPE
DESCRIPTION EV AV Result Severity Priorit
y
Reference
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
33/97
est case Table
TCID TYPE Description Expected Value Actual Value Result Severity Priority Refer
1 GUI
Check for the availabilityof all the objects as perthe Login Obj Tab
All the objects must beavailable as per thelogin obj tab
All the objectsare available asper thelogin objtab Pass
2 GUICheck for the constancy ofall the objects
All the objects must beconsistent with eachother
All the objectsare consistentwith each other Pass
3 GUI
Check for the spellings ofall the objects as per the
Login obj TabLogin Obj
Tab.xls
All the objects must bespelled properly as perthe login obj tab
All the objectsare spelledproperly Pass
4 GUI
Check for the enableproperty of login, clear andcancel buttons
Initially login, clearmust be disabled andcancel button must beenabled
Login, clear andcancel buttonsare enabled Fail
5 GUICheck for the initialposition of the cursor
Initially the cursor mustbe positioned in theuser name field
Initially the cursoris present in theusername field Pass
6 Positive
Enter some information into user name andpassword field and checkfor the enabled property oflogin button
Login button must beenabled
Login button isenabled Pass
7 Positive
Enter some info in to anyof the fields and check forthe enabled property ofclear button
Clear button must beenabled Clear button is
enabled Pass
8 Positive
Enter user name,Password as per the VITand click on login button
Corresponding pagemust be displayed asper theVIT
Correspondingpages aredisplayed as pervalid in puts tablePass
9 Positive
Enter username,Password as per the VIT
and select a data baseoption and click on login
Corresponding pagemust be displayed asper theVIT With the
mentioned data baseconnection
Correspondingpages aredisplayed as perthe VIT with the
mentioned database connection Pass
10 Positive
Enter some information into any of the fields andclear button
All the fields must becleared and the Cursorshould be placed in theuser name fields
All the fields arecleared but thecursor is notplaced in theuser name field. Fail
11 Positive Click on the cancel button
Login screen should beclosed Login screens
closed Pass
http://var/www/apps/conversion/tmp/scratch_6/Login%20Obj%20Tab.xlshttp://var/www/apps/conversion/tmp/scratch_6/Login%20Obj%20Tab.xlshttp://var/www/apps/conversion/tmp/scratch_6/Login%20Obj%20Tab.xlshttp://var/www/apps/conversion/tmp/scratch_6/Login%20Obj%20Tab.xlshttp://var/www/apps/conversion/tmp/scratch_6/Login%20Obj%20Tab.xlshttp://var/www/apps/conversion/tmp/scratch_6/Login%20Obj%20Tab.xlshttp://var/www/apps/conversion/tmp/scratch_6/Login%20Obj%20Tab.xlshttp://var/www/apps/conversion/tmp/scratch_6/Login%20Obj%20Tab.xlshttp://var/www/apps/conversion/tmp/scratch_6/Valid%20Inputs%20Table.xlshttp://var/www/apps/conversion/tmp/scratch_6/Valid%20Inputs%20Table.xlshttp://var/www/apps/conversion/tmp/scratch_6/Valid%20Inputs%20Table.xlshttp://var/www/apps/conversion/tmp/scratch_6/Valid%20Inputs%20Table.xlshttp://var/www/apps/conversion/tmp/scratch_6/Valid%20Inputs%20Table.xlshttp://var/www/apps/conversion/tmp/scratch_6/Valid%20Inputs%20Table.xlsmailto:[email protected]://var/www/apps/conversion/tmp/scratch_6/Login%20Obj%20Tab.xlshttp://var/www/apps/conversion/tmp/scratch_6/Login%20Obj%20Tab.xlshttp://var/www/apps/conversion/tmp/scratch_6/Login%20Obj%20Tab.xlshttp://var/www/apps/conversion/tmp/scratch_6/Login%20Obj%20Tab.xlshttp://var/www/apps/conversion/tmp/scratch_6/Login%20Obj%20Tab.xlshttp://var/www/apps/conversion/tmp/scratch_6/Login%20Obj%20Tab.xlshttp://var/www/apps/conversion/tmp/scratch_6/Login%20Obj%20Tab.xlshttp://var/www/apps/conversion/tmp/scratch_6/Valid%20Inputs%20Table.xlshttp://var/www/apps/conversion/tmp/scratch_6/Valid%20Inputs%20Table.xlshttp://var/www/apps/conversion/tmp/scratch_6/Valid%20Inputs%20Table.xlshttp://var/www/apps/conversion/tmp/scratch_6/Valid%20Inputs%20Table.xlsmailto:[email protected] -
7/30/2019 Total Testing Meterial
34/97
12 PositiveCheck for the tabbingorder of all the objects
Tabbing order must beas follows User name,Password, Connect to,Login, Clear, Cancel
Tabbing order isas followsUsername,Password,Connect toLogin, clear,Cancel Pass
13 Negative
Enter username,Password as per the IVITand click on login button
Corresponding
messages should bedisplayed as perIVIT
Corresponding
error messagesare not displayedas perIVIT Fail
14 Negative
Enter some informationonly in to the user namefield and check for theenabled property of loginbutton
Login button must bedisabled
Login button isenabled Fail
15 Negative
Enter some informationonly in to the passwordfield and check for theenabled property of loginbutton
Login button must bedisabled
Login button isenabled Fail
LOGIN OBJ TAB
Sno Obj Name Type
1 User name Text Box
2 Password Text Box
3 Connect To Combo box
4 Login Button
5 Clear Button
6 Cancel Button
Valid Inputs Table
Sno User Name Password Expected Page Actual value Result
1 Suresh qtp Admin Admin Pass
2 Raja rani Home page Home page Pass
3 Chiru mbbs Home page Home page Pass
4 Praveen puppy Home page Home page Pass
5 NTR illu Home page Home page Pass
6 Admin Admin Admin Admin Pass
http://var/www/apps/conversion/tmp/scratch_6/Invalid%20Input%20Table.xlshttp://var/www/apps/conversion/tmp/scratch_6/Invalid%20Input%20Table.xlshttp://var/www/apps/conversion/tmp/scratch_6/Invalid%20Input%20Table.xlsmailto:[email protected]://var/www/apps/conversion/tmp/scratch_6/Invalid%20Input%20Table.xlshttp://var/www/apps/conversion/tmp/scratch_6/Invalid%20Input%20Table.xlshttp://var/www/apps/conversion/tmp/scratch_6/Invalid%20Input%20Table.xlsmailto:[email protected] -
7/30/2019 Total Testing Meterial
35/97
A test Engineer will do the following during the test execution
1. He will perform the action that is described in the description column
2. He will observe the actual behavior under the actual value column.
3. He will document the observed value under the actual value column.
Valid Inputs Table (IVIT)
Sno User Name Password Expected Page Actual value Result
1 Suresh1 qtp Invalid User name Plz try again Admin Fail
2 Raja2 rani Invalid User name Plz try againInvalid User name Plz try
again Pass
3 Chiru DADAInvalid password Plz try
againInvalid password Plz
try again Pass
4 Praveen TOPIInvalid password Plz try
againInvalid password Plz
try again Pass
5 NTR1 illu4Invalid user name &
password Plz try againInvalid user name &
password Plz try again Pass
6 Admin5 Admin6
Invalid user name &
password Plz try again
Invalid user name &
password Plz try again Pass
35
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
36/97
In this phase the test engineer will compare the expected values with the actual
values and if both are matched they will document the result as pass other wise they
will document the result as fail.
Bug Tracking is a process in which the defects are identified, Isolated and managed
Defect ID: -
The lists of defect numbers are mentioned here in this section.
Defect Description: -What exactly the defect is clearly described here in this section.
Steps for reproducibility: -The list of all the steps that are followed by the test engineer to identify the defect
will be listed out here in this section.
Submitter: -The name of the test engineer who has submitted the defect will be mentioned here
in this section.
Date Submission: -The date on which the defect is submitted is mentioned here in this section.
Version No: -Corresponding Version number is mentioned here in this section.
Build No: -Corresponding build number is mentioned here in this section.
Assigned To: -The development lead will fill the developers name for whom the defect is assigned.
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
efect Id
DefectDescription
Steps forReproducibility Submitter
Date OfSubmission
VersionNO
BuildNo
Assignto SeverityPriorityStatus
Initially Login, cearbuttons are
enabled instead ofbeing disabled
Not Applicable
Sri Balaji 11-Feb-08 1.0.0 1
Upon Clicking onclear button all thefields are cleared
but the cursor is notplaced in the user
name field
1.Enter someinformation in to anyof the fields2.Click on clearbutton3.Observe that thecursor is not placedin the usernamefields after clearingall the fields
Sri Balaji 11-Feb-08 1.0.0 1
Upon enteringSuresh1 as
username and qtpas password andclicking on login
button admin pageis displayed instead
of error message
1.Enter Suresh1 into the user namefield 2.Enterqtp in to thepassword field3.Click on loginbutton4.Observe adminpage is displayedinstead of errormessage.
Sri Balaji 11-Feb-08 1.0.0 1
Up on entering theinformation only into the user name
field login button isenabled instead of
being disabled
1. Enter someinformation in tousername field2.Check for the
enabled property oflogin button. 3.Observe that loginbutton is enabledinstead of being
disabled.Sri Balaji 14-Feb-08 1.0.0 1
Upon entering theinformation only into the password
field login button isenabled insteadbeing disabled
1.Enter someinformation in tho
password field2.Check for theenabled property of
login button3.Observe that login
button to enableinstead of being
disabledSri Balaji 11-Feb-08 1.0.0 1
37
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
38/97
Defect- Id: -The list of defect numbers are mentioned here in this section
Defect Description: -What exactly the defect is clearly described here in this section
Steps for reproducibility: -The list of all the steps that are followed by the test engineer to identify
the defect will be listed out here in this section
Submitter: -The name of the test engineer who has submitted the defect will be
mentioned here in this section.
Date Of Submission: -The date on which the defect is submitted is mentioned here in this
section.
Version No: -Corresponding Version number is mentioned here in this section.
Build No: -Corresponding build number is mentioned here in this section.
Assigned To: -The development lead will fill the developers name for whomthe defect
is assigned.
Severity: -How serious the defect is defined in terms of severity, Severity is
classified in to four types:
1. Fatal (Sev1) or S1 or 1
2. Major (Sev2) or S2 or 2
3. Minor (Sev3) or S3 or 3
4. Suggestion (Sev4) or S4 or 4
1. Fatal:If at all the problems are related to the navigational blocks or unavailability
of functionality then such type of defects are treated to be fatal defect.
Main Menu
Val1
Val2
Result
Next
UN
AVAILABLE
Next ADDNext
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
39/97
2. Major: -If at all the problems are related to the working of major functionalities
then such types of defects are treated to be major defects.
3. Minor: -If at all the problems are related to the Look & Feel of the application
then such type of defects are treated to be minor defects
4. Suggestions: -If at all the problems are related to the value of the application then such
type defects are treated to be suggestions.
+Ve integer Box
Val1
Val2
Result
10
20
-10
ADD
Val1
Val2
Result
BAD
Some
alphabetsInvalid
Entry
Plz Try
again
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
40/97
Is it
Really
Defe
ct
Priority: -Priority defines the sequence in which the sequence in which defects has to be
rectified. It is classified in to four types
1. Critical (Pri1) or P1 or 1
2. High (Pri2) or P2 or 2
3. Medium (Pri3) or P3 or 3
4. Low (Pri4) or P4 or 4
Usually the Fatal defects are given critical priority, Major defects are
given High priority, Minor defects are given Medium Priority and suggestions are
given Low Priority, But depending up on the situations the priority will be
changing.
I - Case:
Low severity-High Priority Case: -
Up on customer visit to the company all the look and feel defects are
given highest priority.
II - Case:
High severity Low Priority Case: -
When ever 80% of the application is released to testing department as
20% is missing the test engineers will treat them as Fatal defect but the development
lead will give least priority for those defects as features are under development.
Bug Life Cycle: -
No
Build #1
Build #2
REQ
DEV
M1
TESTING
Is
defect
is
really
verified
IfDefect
Rectif
ation
Fixed for
verification
OP
EN
STOP TESTING
HOL
D
Testers
error
As per
design
ClosedNe
RE
open
mailto:[email protected]:[email protected]:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
41/97
Yes
No
Yes
No
Status: -
New: - When ever the defect is found for the first time the test engineer will set the
status as New.
Open: -When ever the developer accepts the raised defect then he will set the status
as open.
Fixed for verification Or Fixed for rectified: - When ever the developer rectifies the
raised defect then he will change the status to fixed.
Re open and Closed: -When ever the defects are rectified, next build is released to
the testing dept then the test engineers will check whether the defects are rectified
properly or not. If the defect is rectified properly then the test engineer will set the
status as Closed. If the defect is not rectified properly then the test engineer will
set the status as Re open.
Hold: - When ever the developer is confused to accept or reject the defect then he
will set the status of the defect as hold.
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
42/97
Testers Error or Testers Mistake Or Rejected: - When ever the developer is
confirmed it is not at all a defect hen he will set the status of the defect as
Rejected.
As Per Design: - When ever the test engineer is not aware of new requirements and
if he raises defects related to the new features then the developer will set the status
As Per Design.
Note: This is a rare case not usually Occurs
Ways of Testing:There are two ways of Testing
1. Manual Testing2. Automation Testing
1. Manual Testing:It is a way of testing in which one will perform all the phases of
software testing life cycle like Test planning, Test development, Testexecution, Result analysis, Bug tracking, and Reporting are accomplishedmanually, successfully with human effortsDrawbacks of Manual Testing:
More number of people are required
Time consuming
Human mistakes (no accuracy) Tiredness
Simultaneous action are not possible
Cannot repeat the same task again and againin a perfect manner.
2. Automation Testing:Automation testing is a process in which all the drawbacks of
manual testing are addressed properly and provides speed and accuracy to theexisting testing process.Drawbacks of Automation Testing:
Tools are expensive
Cannot automate all the area
Lack of expertsAutomated Tool:
Automated tool is an assistant of a test engineer, which worksbased on the instructions and information given by a test engineer.
General Frame Work to learn any automated Tool:A test engineer should learn the following to work with any
automated tool
How to give the instructions?
How to give the information?
How to use its recording facility?
How to use its play back facility?
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
43/97
How to analyze the results?
Types of Automated Tools:A black box testing tools are broadly divided in to Three types
1. Functional tools (QTP, Win runner)2. Management Tools (Test Director/Quality
Center)3. Performance tools (Load Runner)
QTP (Quick Test Professional)
Type Of The Tool: Functional ToolCompany: Mercury Interactive incorporationScripting Language: VB- ScriptVersion: #5.5,#6.5,#7.0,#7.6,#8.0,#8.2(2005),#9.0,#9.1,#9.2
Anatomy of QTP:
Vbwindow(emp).vbedit(ename).set Sri BalajiVbwindow(emp).vbedit(eage).set27Vbwindow(emp).vbedit(esal).set20000Vbwindow(emp).vbedit(edeisig).setTEVbwindow(emp).vbedit(submit).set click.
VbWindow("VbWindow").VbEdit("VbEdit").Set "10"VbWindow("VbWindow").VbEdit("VbEdit_2").Set "20"VbWindow("VbWindow").VbButton("ADD").ClickVbWindow("VbWindow").VbButton("SUB").ClickVbWindow("VbWindow").VbButton("MUL").ClickVbWindow("VbWindow").VbButton("DIV").ClickVbWindow("VbWindow").VbButton("CLEAR").Click
Adding Manager:
E name
E age
E Sal
E DesigSubmit
EMP
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
44/97
Adding manager is a feature provided by QTP which is used for
showing all the list of addings while opening the QTP so that the user can select the
desired addings and then enter in to the QTP, Before the user access the QTP the
adding manager will make the QTP compatible with all the selected environments.
By default QTP is always compatible with standard windows
environment.
Whenever we purchase QTP we get Three built-in addings.1. Activex
2. Visual Basic
3. Web.
A part from the above add-ins one needs to purchase the add-inns by paying extra
cost.
QTP screen can be divided in to seven parts
1. Test Pane
2. Active screen
3. Data Table
4. Debug Viewer Pane5. Tool Options
6. Information pane
7. Missing resources pane
1.Test Pane:Test pane is an area provided by QTP, which is used for developing,
viewing, and modifying the test screen. It represents the test scripts in two views
(a). Expert view
(b). Key word view
(a). Expert view: It represents the script in VB script format
(b). Keyword view: Keyword view represents the script using a graphical userinterface (GUI) which is further divided in to four parts.
Item
Operation Value
Documentation
2.Active Screen:Active screen is an area provided by QTP, which holds the snapshots of each
and every script statements and used for the following.
Easily understanding the script
Easily enhancing the script.
3.Data-Table:The date table is originally called as formula1 sheet developed by third party
and integrated with QTP.
Features:
It is used for holding the test data
It isolates the test script from the data source.
It provides the facility to import the test data from
different data sources like excel files, data base and flat
files (a file with out having format)
It allows the user to interact with the data directly
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
45/97
Note: QTP maintains two copies of data tables
i. Design time data table
ii. Run time data table
4. Debug Viewer Pane:Definition of Debugging: Debugging Is a process of executing the script or a
program in a user desired passion with some temporary breaks in order to identifythe errors.
Debug viewer pane is an area provided by QTP which is used for viewing,
modifying or setting the current values of variables or expressions during the
execution break with the help of three Tabs by name Watch expression, Variables
and Command
5.Tool- Options:
All the options available in the menu bar, file tool bar and testing tool bar
are known as tool-options.
RECORDING AND RUNNING
Record and Run Settings:
For every new test one has to compulsorily do this settings before recording
or running. These settings will make to understand on which applications it need to
concentrate while recording or running.
Navigation:
Activate the menu item test
Select the option record and run settings
Select one of the following options
Record and run test on any opened windows based application
Record and run on these application (opened on session start)
If at all second option is selected then click on add button
Browse the desired application part
Click on OK
Click on apply & OK.
Operational overview of Recording:
During recording QTP will do the following..
1. It will generate corresponding script statements for everyuser action on the application.
2. It will store the required related information in the object
repository.
Operational overview of Running:
During running QTP will doing the following..
1. It will read the script statement and understands what
action to be performed on which object.
2. Then it realizes it need to identify the object first to
perform the action
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
46/97
3. To identify the object it requires some information for that
information it will go the object repository and search.
4. Once the information is found using this information it will
try to identify the original object.
5. Once the object is identified it will perform the action on it.
Recording Modes:
There are there types of recording mode(a). Context sensitive recording mode or Normal recording
mode
(b). Analog Recording Mode
(c). Low-level Recording mode.
(a). Context sensitive Recording mode:
It is used for recording the operations performed on the standard
GUI object in different situations
(b). Analog Recording Mode:
It is a special recording mode provided by QTP, which is used forrecording the continuous operations
Navigation:
Keep the tool under normal recording mode
Activate the menu item test
Select the option analog recording
Select one of the following option
o Record relative to the screen
o Record relative to the following window
If at all second option is selected specify the window
title with the help of the Hand Icon
Click on start analog record
(c). Low-Level Recording:
It is a special recording mode provided by QTP, which is used for
recording at least some minimum operations on the non-supported environments
also.
OBJECT REPOSITORY
Object Repository:Object repository is a storage place where one can store the objects
information and it also acts as interface between
n the test script and the AUT(application under test) in order to identify the original
objects during execution
Types of Object Repository:
There are two types of object repository they are
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
47/97
1. local Repository
2. Shared Repository(1). Local Repository:
If at all this type is selected as an object repository then the QTP will
be automatically creating and managing an individual repository for every action.(2). Shared Repository:
Shared repository has to be created and managed manually once a
shared repository to created it can be shared among number of tests
Advantages:
Easy to maintain
Re-usability
Navigation for creating a shared Repository or Converting a per action in to shared:
Collect the objects information in to the object
repository
Click on export
Browse the desired location
Specify the file name with .TSR extension Click on save button
Navigation for Creating the Shared Repository to the currant test:
Activate the menu item test
Select the option settings
Select the resources tab
Select the option shared in the object repository type
section
Browse the desired repository file
Click on apply & OK
Note: .TSR means Test Shared Repository
OPERATIONS ON OBJECT REPOSITORY
Navigation for adding the objects in to the object repository:
Open the object repository
Click on add objects button
Click on the title bar of the window
Click on ok
Select one of the following optionso Only the selected objectso Selected objects and all its direct childreno Selected objects and all its descendents
Click on OK
Navigation for deleting the objects form the object repository: Select the desired object to be deleted in the
object hierarchy Right click on it
Select the option delete
[email protected] 47YES
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
48/97
Confirm the deleting by clicking on
Navigation for Re naming the objects:Select the desired object in the object hierarchy
Right click on it
Select the option Rename
Specify the desired name
Navigation for updating the properties list: Select the desired object in the object hierarchy
Click on add/Remove button
Select the desired properties to be added in to theproperties list
Deselect the properties to be removed from theproperties list
Click on OK
Highlight:Highlight button is used for highlighting the corresponding object in
the AUT so that a test engineer can clearly understand which objects information is
that.
OBJECT IDENTIFICATION
Object identification:Object identification is based on four types of properties and
an ordinal identifier
Types of properties:
1. Mandatory Properties2. Assistive properties3. Base-Filter Properties4. Optional Filter properties
A test engineer can specify the list of mandatory properties, List ofassistive properties, List of base filter properties, list of optiopnal filterproperties and an ordinal identifier.
QTP learns the information in the following in case only normalbrain:First of all the QTP will learn all the mandatory properties at a time andthen think weather these properties are sufficient to identify the objectuniquely. If it feels sufficient then it will stop learning otherwise it will
learn the first assistive property and once again stops and thinks weatherthese properties are sufficient to identify the object uniquely. If it feelssufficient then it stops learning otherwise learns the second assistiveproperty and checks weather these properties are sufficient or not. Thisprocess continuous till the QTP satisfies or up to the end of the assistiveproperties list. At the end of the assistive properties list also if it feels notsatisfied then it will finally learn the ordinal identifier and stops learning.
QTP learns the information in the following way in case of smartbrain also:
While learning the mandatory properties along with them it will learn
the base filter properties, optional filter properties and stores them in the secret
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
49/97
It considers the mandatory properties only and check weather these
properties are sufficient to identify the object uniquely. and repeats the above
process.
Note: In the above learning process except base filter properties andoptional filter properties all the remaining information learnt will be storedin the object repository.
QTP will use the information in the following way to identify theobject during execution:
First of all QTP will use all the properties present in the objectrepository except ordinal identifier and try to identify the object. If at allthe object is not identified then it will forget about all these properties andfreshly enters in to the secret place.
QTP will consider all the base filter properties and try toidentify the object and forms a list of all the objects that are matched withthe base filter properties.If the list contains only one object then that is the object otherwise it willtake the support of first optional filter property and try to match with allthe object present in the list and forms a new list of all the objects that arematched with that property and then check weather the list is containing
one object or more that one object. If the list is containing more than oneobject then it will consider the second optional filter property and repeatsthe whole procedure till the list contains on object or up to the end of theoptional properties list.At the end of the optional filter properties list also if the list is containingmore than one object then it will finally go to the object repository andcheck weather the ordinal identifier is available or not. If at all the ordinalidentifier is available it will identify the object roughly using that otherwiseHANDSUP.
Ordinal Identifiers:There are three types of ordinal identifiers
1.Location2.Index3.Creation time
1.Location:If at all the location is selected, as an ordinal identifier then
the QTP will generate a sequence of numbers from 0,1,2,3 based on thesequence of the objects located in AUT.
2.Index:If at all the index is selected as an ordinal identifier than the
QTP will generate the numbers from 0,1,2,3. Based ob the sequence ofthe programs of the objects.
3.Creation Time (specially for web pages):If at all creation time is selected as an ordinal identifier the QTP will
generate the number from 0,1,2,3, based on the loading time of the web pages
Smart Identification:When ever the QTP is unable to identify the objects with the help of
the properties present in the object repository then the special mechanismprovided by QTP to identify the object smartly with some other propertiesis known as smart identification.
Navigation for Object identification Configuration:
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
50/97
Activate the menu item tools
Select the option object identification
Select the desired environment
Select the desired object type
Specify the desired list of mandatory properties andassistive properties with the help of corresponding add/remove buttons
Select the ordinal identifier
Smart identification Select the check box enable smart identification
Click on configure button
Specify the desired list of base filter properties andoptional filter properties with the help of add/removebuttons
Click on OK
Click once again on Ok
Object Spy:Object spy is a handy feature provided by QTP which is used for
showing the complete objects information like list of properties and their values, list
of methodology, syntax for methodology and description of methods then and there
on the spot immediately of both test objects as well as runtime objects.Navigation for Object SPY:
Activate the menu item tools
Select the option object spy
Click on the hand icon
Click on the desired object
Types Of Objects:There are two types of objects 1.Run time objects
2.Test objects
1.Run time objects:All the original objects present in the AUT are known as run
time objects
2.Test Objects:Test objects are the reference objects created by the QTP for
run time objects, stored in object repository and used by the QTP for theoriginal objects
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
51/97
QTP LIFE CYCLE
QTP life cycle contains Six phases
I. Test planningII. Generating the basic testIII. Enhancing the testIV. Debugging the testV. Executing the testVI. Analysis the Results
I. Test Planning:In this phase the automation test lead will do the following
1. Under standing the requirements2. Identifying all the areas to be automated3. Analyzing both the negative and positive flow of the
application4. Preparing the automation test plan document based
on the analysis5. Preparing the tool ready with all the pre
configurational settings for the further operationsII. Generating the basic test:
In this phase the automation test engineer will generate thebasic test engineer will generate the basic test for both the +ve and veflow of the application
IIII. Enhancing the Test:One can enhance the script in the following ways
1. Inserting the check points2. Synchronizing the test3. Parameterising the test (Data Driven Testing)4. Inserting the out put value statements5. Inserting the transactional points for
measuring transactions6. Inserting the programmatic statements7. Adding comments8. Inserting the script statement manually
1.Check Point:Checkpoint is defined as validation pointer test point which
checks the objects state or bitmap state or data state during executionat any point of time
Operational over view of checkpoint:Checkpoint works in two phases
i. Pre-execution Phase: It captures the expected value
Generates the corresponding test script statement
ii. While-execution phase: It captures the actual value
Compared the actual value with the expected value
Displays the result
Types Of Checkpoints:
a. Standard checkpointsb. Bitmap checkpoint
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
52/97
c. Text checkpointd. Text area checkpointe. Data base checkpointf. XML checkpointg. Page checkpointh. Table checkpointi. Image checkpoint
j. Accessibility checkpoint
a. Standard Checkpoints:
Standard
checkpoint is used for checking the standard GUI objects properties
value, it can be inserted in two ways
i. Through application
ii. Through Active Screen
Navigation through application:
Keep the cursor in the desired location
Keep the tool under recording mode
Activate the menu item insert
Go to checkpoint
Select the option standard checkpoint
Click on the desired object in the AUT
Click on OK
Select the desired properties to be checked
Specify the desired expected values Click on OK
Stop Recording
Navigation through active screen:
Keep the cursor on the desired statement so that the
corresponding snapshot is displayed in the active screen
Go to active screen right click on the desired object
Select the option insert standard check point
Click on OK
Select the desired properties to be checked
Specify the desired expected values
Select one of the following options
Select one of the following options
o Before current step
o After current step
o Click on OK
eckpoints:
Hidden CheckpointsFor Web Checkpoints
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
53/97
Bitmap
checkpoint is used for checking the complete bitmap or apart of a bitmap.
It can be inserted in two ways
i. Through application
ii. Through Active Screen
Navigation through application:
Keep the cursor in the desired location of the screen Keep the tool under recording mode
Activate the menu item insert
Select the option bitmap check point
Click on the desired bitmap
Click on OK
If at all one need select a part of bitmap then select it using the
select area button
If at all one need save only the selected part then select the check
box save only selected area
Click on OK
Navigation Through Application:
Keep the cursor on the desired statement so that the
corresponding is displayed in the active screen
Go to the active screen
Right click on the bit map
Select the option insert bitmap check point
Click on OK
If at all one need to select a part of bitmap then select it using
select area button IF alt all one need to save only the selected part select the check
box save only selected area
Select one of the following option
o Before currant step
o After currant step
Click on OK
kpoint:Text
checkpoint is used for checking the text present on a specified object. It
can be inserted in two ways
i. Through application
ii. Through Active
Navigation through application: Keep the cursor in the desired location of the screen
Keep the tool under recording mode
Activate the menu item insert
Click on check point
Click on text checkpoint
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
54/97
Click on the desired text
Select the following option
o Match case
o Exact match
o Ignore space
o Text not displayed
Click on OK
Navigation through Active Screen:
Keep the cursor on the desired location so that the
corresponding snapshot is available in the active screen
Right Click on the desired position
Click on insert text checkpoint
Click on desired text
Select the following option
o Match case
o Exact matcho Ignore space
Text not displayed
Click on ok
eck Point:
Test
area checkpoint is used for checking the test presenting a specified area.
It can be inserted only through the application but not through the active
screen
Navigation through application:
Keep the cursor on the desired location of the screen
Keep the tool under recording mode
Activate the menu item insert
Select the opinion text area checkpoint
Select the exact area through cross hair pointers
Choose the following options
o Match case
o Exact match
o Ignore spaceo Text not displayed
Click on OK
Stop Recording
eckpoint:
Data base check
point is used for checking the contents of the data base
Navigation:
Activate menu item insert
mailto:[email protected]:[email protected] -
7/30/2019 Total Testing Meterial
55/97
Go to check point
Select the option data base checkpoint
Select the option specify AQL statement manually
Click on meet
Click on create
Click on new
Select the desired driver Slick on next
Click on finish
Click on select
Select the desired database
Click