1Flood Defence Toronto, May 6-8, 2008
Risk assessment in trans-boundary cooperation between the
Netherlands and Germany
Jan Stijnen
Toronto, May 6-8, 2008Flood Defence 2
Presentation overview
• Introduction
• Study area
• Risk-assessment method
• Sensitivity analysis
• Summary and future plans
Toronto, May 6-8, 2008Flood Defence 3
Introduction
• Flood protection in boundary area of Germany and
the Netherlands
• Identify and reduce flood risk for 2 dike ring areas
along the Rhine
• Cooperation!
Toronto, May 6-8, 2008Flood Defence 4
Introduction
• Project initiation: 2005
• Three phases
1. Communication and identification (2006)
2. Risk-analysis of right-hand side dike ring (2007)
3. Risk-analysis of left-hand side dike ring (2008)
• Joint method, based on existing software/techniques
• Time horizons: 2006, 2015 and 2015+
Toronto, May 6-8, 2008Flood Defence 5
Study area
Transboundary
dike rings along the
river Rhine
Toronto, May 6-8, 2008Flood Defence 6
Study area
Dike ring 48
Dike ring 42
12.5 miles
Toronto, May 6-8, 2008Flood Defence 7
Scope of the project
Toronto, May 6-8, 2008Flood Defence 8
Failure mechanisms
Toronto, May 6-8, 2008Flood Defence 9
Computation of failure probabilities
– Overflow
– Wave overtopping
– Bursting of the soil & piping
– Stability of the slope
– No structures
Toronto, May 6-8, 2008Flood Defence 10
Failure mechanisms / probabilities
• Identification of 10 weak spots, based on Dutch
deterministic assessment method and local expert
knowledge
• Probabilistic computation of failure probabilities every
100 meters for wave overtopping only
• Detailed probabilistic computation of failure
probabilities for 10 weak spots
Toronto, May 6-8, 2008Flood Defence 11
Differences in dike design
T = 1250 years
T = 500 years
Toronto, May 6-8, 2008Flood Defence 12
Difference in maintenance
Toronto, May 6-8, 2008Flood Defence 13
Breach and flood simulation
Toronto, May 6-8, 2008Flood Defence 14
Breach and flood simulation
Toronto, May 6-8, 2008Flood Defence 15
Damage assessment
Flood simulationDamage and
loss of life moduleDamage function for agriculture and recreation
0
0.2
0.4
0.6
0.8
1
1.2
0 1 2 3 4 5
Flood depth [m]
Dam
age
fact
or
Land use
Toronto, May 6-8, 2008Flood Defence 16
Flood risk
Risk=
probability
consequence
Toronto, May 6-8, 2008Flood Defence 17
Cost-benefit analysis of measures
Types of (structural) measures:
– Dike strengthening
– Compartment dikes
Toronto, May 6-8, 2008Flood Defence 18
Compartment dike
Toronto, May 6-8, 2008Flood Defence 19
Compartment dike
Toronto, May 6-8, 2008Flood Defence 20
Sensitivity analysis
Verification of sensitivity to assumptions
– Critical overtopping discharge
– Breach development (width, water level, moment
of breach)
– Flood wave (shape and height of discharge wave)
– Correction of damage and costs
Toronto, May 6-8, 2008Flood Defence 21
Summary and future plans
• Cooperation very successfull as a result of the
communication and identification phase
• Much added value because of different partners
• Project in last phase
• Final results this summer (symposium)
Toronto, May 6-8, 2008Flood Defence 22
Thank you for your attention!