Workshop:"Maintenance and dangerous substances"
Topic:Management systems, risk assessment at BASF
Johnny NobelsSafety EngineerBASF Antwerpen N.V.
![Page 2: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/2.jpg)
17/09/2010 2
Who is BASF ?
![Page 3: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/3.jpg)
17/09/2010 3
Who is BASF ?
Specialist in raw materials and intermediates
![Page 4: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/4.jpg)
17/09/2010 4
BASF operates worldwide
AziaPacific Ocean
Europe
SÃOPAULOSÃOPAULO
GEISMARGEISMAR
FLORHAMPARKFLORHAMPARK
NorthAmerica
South-AmericaAfricaMiddle-East
FREEPORTFREEPORT
ANTWERPENANTWERPEN LUDWIGSHAFENLUDWIGSHAFEN
SINGAPORESINGAPORE
HONG KONGHONG KONG
KUANTANKUANTAN
NANJINGNANJING97.000 employees worldwide
![Page 5: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/5.jpg)
17/09/2010 5
BASF Antwerp N.V.
Total surface area 600 ha
Number of production plants 54
Number of BASF employees 3500
Number of contractor employees 1200
Turnover, 2009 4,4 billion Euro
![Page 6: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/6.jpg)
17/09/2010 6
Some pictures
![Page 7: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/7.jpg)
17/09/2010 7
Accident Statistics
Check of 141 LTI’s (BASF + contractors)
94 LTI’s during maintenance activities
Non chemical related66%
Chemical related6%
"Home" alike accidents
28%
![Page 8: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/8.jpg)
17/09/2010 8
Maintenance work in a chemical plantWhat is a maintenance worker facing ?
Sure this is the right pump ???
Empy ???
Benzene ?
Ammonia, 9 bar ?
Ethylene, -102°C ?What is inside ?
We need to disassemble the pump
What does “Empy” mean ?
![Page 9: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/9.jpg)
17/09/2010 9
Maintenance company
Maintenance work in a chemical plantWhat type of hazards must be assessed ?
Interaction hazards:other workers
Work specific hazards:welding fumes, sharpedges, sparks, ….
Location specific hazards: chemicals, noise, ….
Owner, work coordinator
![Page 10: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/10.jpg)
17/09/2010 10
Maintenance work in a chemical plant3 key elements
1. Permit to work system
2. Highly qualified maintenance workers
3. Thorough work preparation
![Page 11: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/11.jpg)
17/09/2010 11
Maintenance work in a chemical plantPermit to work system
![Page 12: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/12.jpg)
17/09/2010 12
Maintenance work in a chemical plantPermit to work system
Main goals:
Assess all specific hazards
![Page 13: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/13.jpg)
17/09/2010 13
Maintenance work in a chemical plantPermit to work system
Main goals:
Assess all specific hazards
Document necessary measures before the work can startreduce risks to a minimum
![Page 14: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/14.jpg)
17/09/2010 14
Maintenance work in a chemical plantPermit to work system
Main goals:
Assess all specific hazards
Document necessary measures before the work can startreduce risks to a minimum
Specify necessary measures to be taken during the workprotect workers from residual risks
![Page 15: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/15.jpg)
17/09/2010 15
Maintenance work in a chemical plantPermit to work system
NO maintenance job is done without a written permission !
Production always gives permission to start a job
Different permits for different types of work
Suggesting specific hazards and measures
– Normal work and line breaking
– Hot work
– Work in confined spaces
– Excavation work
– …
![Page 16: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/16.jpg)
17/09/2010 16
Maintenance work in a chemical plantPermit to work system
Permit issuer is an experienced, trained worker (mostly shift supervisor)
Permit receiver (contractor) is trained on how to use BASF permits (e-learning with test)
All workers are informed about the required measures by their supervisor
![Page 17: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/17.jpg)
17/09/2010 17
Maintenance work in a chemical plantPermit to work system
Special precautions
4-eye principle : Hazard assessment and measures are checked twicee.g. for confined space entry and hot work (shift supervisor and plant manager)
Last minute check : Permit hand-over in the fielde.g. for line breaking activities
![Page 18: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/18.jpg)
17/09/2010 18
Maintenance work in a chemical plantHighly qualified workers
![Page 19: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/19.jpg)
17/09/2010 19
Maintenance work in a chemical plantHighly qualified workers
Contractor selectionOnly contractor companies with good safety performance and safety management system are selected. E.g.
– VCA+, VCA++, VCA-P (B, Nl)
– SCC (D)
– MASE (F)
Work execution
![Page 20: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/20.jpg)
17/09/2010 20
Maintenance work in a chemical plantHighly qualified workers
Contractor selection
Basic training before access
Required safety training for contractor employees
– Basic safety training (1 week, according to VCA system)
– Certified training on critical tasks (e.g. explosion/oxygen measurements, use of respiratory equipment, etc.)
– Site specific training before access tn site
Work execution
![Page 21: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/21.jpg)
17/09/2010 21
Maintenance work in a chemical plantHighly qualified workers
Contractor selection
Basic training before access
Kick-off safety meeting
Mentor as coaching
Shut down, projects : Kick-off safety meeting
– Written information/training on specific project related hazards and measures
On-site contractors : BASF Mentor
– “translates” relevant site rules
– Regularly checks (safety) performanceWork execution
![Page 22: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/22.jpg)
17/09/2010 22
Maintenance work in a chemical plantHighly qualified workers
Contractor selection
Basic training before access
Kick-off safety meeting
Mentor as coaching
Additional training
Additional training. E.g.
– Permit to work system : only trained supervisors are allowed to sign for receipt of permits
– Use of specific PPE
Work execution
![Page 23: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/23.jpg)
17/09/2010 23
Maintenance work in a chemical plantHighly qualified workers
Evaluation
Contractor selection
Basic training before access
Kick-off safety meeting
Mentor as coaching
Additional training
Work execution
Safety evaluation.
– Periodically for on site contractors
– After completion for project contractors
Contractor safety reflection platform
– Quarterly meeting between BASF and contractor representatives
– Discuss general points of improvement, new safety initiatives,…
![Page 24: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/24.jpg)
17/09/2010 24
Maintenance work in a chemical plantThorough work preparation
![Page 25: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/25.jpg)
17/09/2010 25
Maintenance work in a chemical plantThorough work preparation
Workplan
Workexecution
Work preparation.
– Split the maintenance job in its different steps to create a detailed work plan
– Think of all necessary safety aids for each step (e.g. scaffolds, special PPE, how to clean, etc…)
– Request necessary permits for each step
![Page 26: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/26.jpg)
17/09/2010 26
Maintenance work in a chemical plantThorough work preparation
Workplanning Scheduling Work
execution
Scheduling.
– Avoid interaction hazards between different jobs
– Check availability of workers and materials
![Page 27: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/27.jpg)
17/09/2010 27
Maintenance work in a chemical plantThorough work preparation
Workplan Scheduling Plant
preparationWork
execution
Plant preparation.
– Prepare permits
– Take all necessary measures before start of the work
– Evaluate additional hazards due to urgent (not planned) work
– Issue permit if all measures are taken
![Page 28: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/28.jpg)
17/09/2010 28
Maintenance work in a chemical plantThorough work preparation
Workplan Scheduling Plant
preparationWork
executionPlant
Line-up
Work execution.
– Apply measures on work permit. Workers confirm that they have been informed of the measures to be taken.
– Safety observations by contractor
– Safety tours by BASF
![Page 29: Topic: Management systems, risk assessment at BASF...17/09/2010 5 BASF Antwerp N.V. Total surface area 600 ha Number of production plants 54 Number of BASF employees 3500 Number of](https://reader033.vdocuments.us/reader033/viewer/2022052002/6015604d511faa774310410b/html5/thumbnails/29.jpg)
17/09/2010 292911/10/20106/05/2008 ___ __ ______________PBM- Hand- en armbescherming 2929
We ondernemen duurzaam voor een levenswaardige toekomstThank you for your attention