Page 1: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

TOPIC 4a

ACTIVITY BASED COSTING SYSTEM

Page 2: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-2

Traditional Costing Systems

Traditional cost systems were created whenmanufacturing processes were labor intensive.

A single company-wide overhead rate,based on direct labor hours, may be

used to allocate overhead to productsin these labor intensive processes.

Page 3: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-3

Overhead is allocated to jobs using directlabor hours. If overhead is $120, how much

overhead is allocated to each job?

Traditional Costing Systems

Page 4: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-4

Overhead Rate = $120 ÷ 8 direct labor hoursOverhead Rate = $15 per direct labor hour

Job 1 = 2 hours × $15 per hour = $30Job 2 = 6 hours × $15 per hour = $90

Traditional Costing Systems

Page 5: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-5

Automation increasesoverhead from $120 to $420and reduces the Job 2 laborhours from 6 to 1. Allocate

the $420 overhead to the two jobs using direct labor.

Traditional Costing Systems

Page 6: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-6

Overhead Rate = $420 ÷ 3 direct labor hoursOverhead Rate = $140 per direct labor hour

Job 1 = 2 hours × $140 per hour = $280Job 2 = 1 hour × $140 per hour = $140

Traditional Costing Systems

Page 7: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-7

Is this reasonable?

Automation benefited Job 2, but Job 1 isallocated more overhead. Clearly, we needanother cost driver to allocate overhead.

Traditional Costing Systems

Page 8: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-8

Directlabor hours

Machinehours

Processsetups

Designtime

Lot size

Customercontact

Activity-Based Costing (ABC)

A costing method that first assigns costs to activities, then assigns costs to products based

on their use of the activities.

Page 9: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-9

ProductsRequire

Activities

ActivitiesConsume

Resources

PeopleManage

Activities

Activity-Based Costing (ABC)

A costing method that first assigns costs to activities, then assigns costs to products based

on their use of the activities.

Page 10: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-10

ABC is used primarilyfor decision making, notfor inventory valuation for external reporting.

Activity-Based Costing (ABC)

Both manufacturingand nonmanufacturing

costs may be assigned toproducts.

Allocation bases oftendiffer from

traditional costingsystems.

AB C

ABC is a goodsupplement

to our traditionalcost system.

Page 11: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-11

Level of C

omplexity

Cost of Im

plementation

Level of B

enefits

TraditionalCosting

Activity-BasedCosting

Activity-Based Costing (ABC)

Page 12: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-12

Resource CostsResource Costs

Cost Pools:Cost Pools:Plants or Plants or

DepartmentsDepartments

Cost ObjectsCost Objects

Traditional CostingResource CostsResource Costs

Cost Pools:Cost Pools:Activities orActivities or

Activity CentersActivity Centers

Cost ObjectsCost Objects

Activity-Based Costing

Directly tracedor allocated

Directly tracedor allocated

Predeterminedoverhead

rate

Cost driverrates foreach activity

Activity-Based Costing (ABC)

Page 13: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-13

An Activity Cost Activity Cost PoolPool is a

“container” in which costs are

accumulated that relate to a

single activity in the ABC system.

$

$

$ $

$$

Costs

Activity-Based Costing (ABC)

Page 14: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-14

Identify and classify the activities related to the company’s products or services.

Estimate the cost of each activity identified in .

Calculate a cost-driver rate for each activity.

Assign activity costs to products using the cost-driver rate.

Four Steps in the ABC Process

Page 15: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-15

Identify and Classify ActivitiesUNIT-LEVEL ACTIVITES

Resources acquired and activities performed for individual units.

CUSTOMER-LEVEL ACTIVITESResources acquired and activities performed to serve specific customers.

BATCH-LEVEL ACTIVITES Resources acquired and activities performed for a group or batch of similar

products or services.

PRODUCT-LEVEL ACTIVITESResources acquired and activities performed to produce and sell a

specific product or service.

FACILITY-LEVEL ACTIVITIESResources acquired and activities performed to provide general capacity to

produce goods or services.

Page 16: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin16

Directly traceable to the decision toproduce the level

of output

Cost Hierarchy

Includes direct material, direct labor, utilities to run equipment, other overhead directly related

to the production process.

Costs that are incurred for every unit of product manufactured or service produced.

Unit-level Costs

All unit level costs are variable, but notall variable costs are unit level costs.

Page 17: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin17

Batch-level Costs

Costs that are incurred for batch of product manufactured or service produced.

Includes setup costs, material-handling costs related to delivering raw material to the

production line, etc.

Cost Hierarchy

Page 18: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin18

Product-level Costs

Costs that are incurred for each line of product or service.

Includes design costs for product lines and marketing costs for each product line.

Cost Hierarchy

Page 19: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin19

Customer-level Costs

Costs that are incurred for specific customers.

Includes licensing costs for customer-specific logos and customization costs.

Cost Hierarchy

Page 20: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin20

Facility-level Costs

Costs that are incurred to maintain the organization’s overall facility and infrastructure.

Includes production manager’s salary, plant depreciation, and insurance on the facility and

equipment.

Cost Hierarchy

Page 21: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-21

INTERVIEW OR INTERVIEW OR PARTICIPATIVE PARTICIPATIVE

APPROACHAPPROACHABC teams include or

interview operating employees.

RECYCLING RECYCLING APPROACHAPPROACH

Reuses documentation of processes used for

other purposes.

TOP DOWN APPROACHTOP DOWN APPROACHABC teams of middle-management or above

develop the activity dictionary.

Identify and Classify Activities

Page 22: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-22

The ABC teams should gather data on the costs of all the activities identified in Step 1.

Estimate the Cost of Activities

Examine accounting records for

recorded cost information.

Ask employees to indicate how

much timethey work on

various activities.

Page 23: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-23

MAY Company has 4 employees in its Quality Control Department. Salaries and costs for the department total

$360,000 per year. MAY produces 500,000 units of product a year. What is the cost-driver rate per unit?

$360,000 ÷ 500,000 units = $.72 per unit

Two pieces of information are

required to compute the cost-driver rate:

•Activity Cost•Activity Volume

Calculate Cost-Driver Rates for Activities

Page 24: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-24

MAY has a customer service center where customers can call to ask

questions. Customers pay a fixed fee for each call they make to the service center. It costs MAY $1,260,000 a year to operate the center. The center receives 120,000

calls per year. The center handles 1,000,000 minutes of calls.

What is the appropriate cost driver; total minutes for all calls or number of calls?

What is the cost-driver rate?

Calculate Cost-Driver Rates for Activities

Page 25: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-25

Since customers are charged “per call”, the proper activity in this case is the number of

calls handled by the center.

The cost-driver rate would be:

$1,260,000 ÷ 120,000 calls = $10.50 per call

Calculate Cost-Driver Rates for Activities

Page 26: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-26

Calculate Cost-Driver Rates for Activities

Appropriatecost-driver

baseBased on resource’spractical capacity to

support activities

Cause and effectrelationship between

activity and costsMeasurable

Predict or explainan activity’s use

of resources

Page 27: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-27

Practical Capacity Note

When estimating the cost of an activity,

only the costs associated with the product should be

used (practical capacity). The cost

of “unused capacity” should not be

applied to products.

EXAMPLESuppose we rent a 1,000

square foot warehouse for $1,000 per month. Only 800

sq. ft. are used to store Product A. The rest of the warehouse is “unused”.

How much rent cost should be allocated to Product A?

Page 28: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-28

20%, or $200 should 20%, or $200 should be assigned to be assigned to

“unused capacity”“unused capacity”

80%, or $800 80%, or $800 should be assigned should be assigned

to Product Ato Product A

Practical Capacity Note

Page 29: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-29

Assign Activity Costs to Products

1. Identify all the activities related to a

given product or service.

2. Determine how many

units of each activity are

used per unit of product.

3. Assign costs to products

using the cost-driver rates for each activity.

Page 30: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-30

Example: Yazz, Inc. produces 130,000 units of Product A and 400,000 units for Product B. Using the following

cost information, how much overhead should be allocated to Product A?

Assign Activity Costs to Products

Page 31: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-31

Assign Activity Costs to Products

Page 32: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-32

Let’s look at anexample from theBilson Company.

Activity-Based Costing Example

Page 33: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-33

Bilson, Inc. manufactures and sells 5,000 units of Product A (deluxe model), and 25,000 units of Product B (standard model) each year.

Product A requires 3.0 DLH and Product B requires 2.5 DLH to produce.

Employing a traditional costing system, Bilson assigns overhead cost to products using direct labor hours.

The predetermined overhead rate is: Mfg. overhead cost Direct labor hours = $1,550,000

77,500 = $20/DLH

Activity-Based Costing Example

Page 34: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-34

Bilson’s unit product costs using traditional costing are:

Product A Product BDirect material 40.00$ 29.00$ Direct labor 30.00 25.00 Manufacturing overhead 3.0 DLH × $20/DLH 60.00 2.5 DLH × $20/DLH 50.00 Total unit product cost 130.00$ 104.00$

Bilson marks its products up by 50 percent and allocatesits $500,000 customer service costs based on revenue.

Activity-Based Costing Example

Page 35: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-35

Volume 5,000 25,000 Sales Price 195.00$ 156.00$

Sales Revenue 975,000$ 3,900,000$ Direct Material 40.00$ 200,000 29.00$ 725,000 Direct Labor 30.00 150,000 25.00 625,000 Overhead 60.00 300,000 50.00 1,250,000 Gross Margin 65.00$ 325,000$ 52.00$ 1,300,000$ Customer Service Costs 100,000 400,000 Product operating income 225,000$ 900,000$

Product A Product B

$975,000 ÷ ($975,000 +$3,900,000) × $500,000

Traditional Costing$130.00 × 1.50

Activity-Based Costing Example

Page 36: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-36

Sales of Product A have increased steadily since introduction,but company income has declined. Management at Bilson isunhappy with the traditional costing system and they have

decided to try activity-based costing.

In addition, management hasobserved that the cost of direct

labor is relatively stable.Since labor does not behavelike a unit-level cost, labor will

be combined with overhead andthe total conversion cost

will be assigned using ABC.

Activity-Based Costing Example

Page 37: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-37

The total conversion cost is:Traditional overhead $1,550,000Labor (77,500 hours @ $10) 775,000 Total $2,325,000

In addition, management hasobserved that the cost of direct

labor is relatively stable.Since labor does not behavelike a unit-level cost, labor will

be combined with overhead andthe total conversion cost

will be assigned using ABC.

Activity-Based Costing Example

Page 38: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-38

Activity Cost Machine setups 800,000$ Quality inspections 450,000 Production orders 225,000 Machine-hours worked 650,000 Material receipts 200,000 Total 2,325,000$

Management has identified the following five activities and costs in the production of its two products:

Total conversion cost

Activity-Based Costing Example

Page 39: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-39

The following transaction data has been complied by management of Bilson:

Activity Total Product A Product B Machine setups 5,000 3,000 2,000 Quality inspections 9,000 6,000 3,000 Production orders 600 200 400 Machine-hours worked 50,000 15,000 35,000 Material receipts 800 150 650

Activity-Based Costing Example

Page 40: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-40

These data can be used to develop predetermined cost-driver rates for each of the five activities:

Activity CostsTotal

TransactionsRate per

Transaction Machine setups 800,000$ 5,000 160.00$ per setup Quality inspections 450,000 9,000 50.00 per inspection Production orders 225,000 600 375.00 per order Machine-hours worked 650,000 50,000 13.00 per hour Material receipts 200,000 800 250.00 per receipt Total 2,325,000$

$ 800,000 ÷ 5,000 Machine setups = $160.00 per setup

Activity-Based Costing Example

Page 41: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-41

Product AActivity ABC Rate Transactions Amount

Machine setups 160.00$ 3,000 480,000$ Quality inspections 50.00 6,000 300,000 Production orders 375.00 200 75,000 Machine-hours worked 13.00 15,000 195,000 Material receipts 250.00 150 37,500 Total overhead assigned 1,087,500$ Number of units produced ÷ 5,000 Conversion per unit $217.50

The activity-based overhead rates we just calculatedcan be used to assign conversion costs to Bilson’s

two products.

Activity-Based Costing Example

Page 42: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-42

The activity-based overhead rates we just calculatedcan be used to assign conversion costs to Bilson’s

two products.Product B

Activity ABC Rate Transactions Amount Machine setups $160.00 2,000 320,000$ Quality inspections 50.00 3,000 150,000 Production orders 375.00 400 150,000 Machine-hours worked 13.00 35,000 455,000 Material receipts 250.00 650 162,500 Total overhead assigned 1,237,500$ Number of units produced ÷ 25,000 Conversion per unit 49.50$

Activity-Based Costing Example

Page 43: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-43

The activity-based overhead rates we just calculatedcan be used to assign conversion costs to Bilson’s

two products.Product B

Activity ABC Rate Transactions Amount Machine setups $160.00 2,000 320,000$ Quality inspections 50.00 3,000 150,000 Production orders 375.00 400 150,000 Machine-hours worked 13.00 35,000 455,000 Material receipts 250.00 650 162,500 Total overhead assigned 1,237,500$ Number of units produced ÷ 25,000 Overhead per unit 49.50$ Total conversion assigned to Product A 1,087,500$ Total conversion assigned to Product B 1,237,500 Total overhead 2,325,000$

Activity-Based Costing Example

Page 44: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-44

Let’s compute the product cost for A and B using our ABC overhead rates:

Activity Based Costing Product A Product B Direct materials 40.00$ 29.00$ Conversion 217.50 49.50 Total unit product cost 257.50$ 78.50$

These amounts did notchange as a result of

using ABC.

Activity-Based Costing Example

Page 45: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-45

Now compare the unit product costs using the traditional costing system and our ABC system.

Costing Method Product A Product BActivity-based costing 257.50$ 78.50$ Traditional costing 130.00 104.00

Remember, we used one overheadrate based on direct labor hours.

Activity-Based Costing Example

Page 46: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-46

Now compare the unit product costs using the traditional costing system and our ABC system.

Costing Method Product A Product BActivity-based costing 257.50$ 78.50$ Traditional costing 130.00 104.00

Adopting activity-based costing usually resultsin a shift of batch-level and product-level

overhead costs from high-volume standardproducts to low-volume, more complex products.

Activity-Based Costing Example

Page 47: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-47

Can you see how different allocationCan you see how different allocationmethods might lead to makingmethods might lead to making

different management decisions?different management decisions?

Costing Method Product A Product BActivity-based costing 257.50$ 78.50$ Traditional costing 130.00 104.00

Now compare the unit product costs using the traditional costing system and our ABC system.

Activity-Based Costing Example

Page 48: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-48

Based on these results Bilson also decides to use ABC to assignits $500,000 customer service costs. The applicable activity is

number of customer consultations. Customers buying Product A,the deluxe model, require more consultations than those buying

Product B, the standard model.

Cost per consultation = $500,000 ÷ 125,000 consultations = $4.00

Activity-Based Costing Example

Page 49: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-49

Volume 5,000 25,000 Sales Price 195.00$ 156.00$

Sales Revenue 975,000$ 3,900,000$ Direct Material 40.00$ 200,000 29.00$ 725,000 Conversion 217.50 1,087,500 49.50 1,237,500 Gross Margin (62.50)$ (312,500)$ 77.50$ 1,937,500$ Customer Service Costs 200,000 300,000 Product operating income (512,500)$ 1,637,500$

Product A Product B

ABC Costing

No change in sales price

Let’s compare product income using traditional and ABC costing.

Activity-Based Costing Example

Page 50: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-50

ABCCosting

TraditionalCosting

Volume 5,000 25,000 Sales Price 195.00$ 156.00$

Sales Revenue 975,000$ 3,900,000$ Direct Material 40.00$ 200,000 29.00$ 725,000 Conversion 217.50 1,087,500 49.50 1,237,500 Gross Margin (62.50)$ (312,500)$ 77.50$ 1,937,500$ Customer Service Costs 200,000 300,000 Product operating income (512,500)$ 1,637,500$

Product A Product B

Volume 5,000 25,000 Sales Price 195.00$ 156.00$

Sales Revenue 975,000$ 3,900,000$ Direct Material 40.00$ 200,000 29.00$ 725,000 Direct Labor 30.00 150,000 25.00 625,000 Overhead 60.00 300,000 50.00 1,250,000 Gross Margin 65.00$ 325,000$ 52.00$ 1,300,000$ Customer Service Costs 100,000 400,000 Product operating income 225,000$ 900,000$

Product A Product B

Page 51: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-51

Should Bilsonincrease the price

of Product A?

Should Bilsonreduce the price

of Product B?

Should Bilsondrop Product A?

Activity-Based Costing Example

Page 52: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-52

The price of Product A, the deluxe model, should probably be increased. Customers who buy deluxe models may buy based on features instead of price.

The price of Product B, the standard model, may be too high. Customers who buy standard models are price sensitive. Decreasingthe price would increase volume,possibly resulting in more income.

Activity-Based Costing Example

Page 53: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-53

More accurate and informative product costs lead to better decisions.

More accurate measurements of the activities driving costs.

Provides managers with easier access to relevant costs.

An ABC system is very expensiveto develop and implement; it is

also very time-consuming.

ABC– Benefits and Limitations

Page 54: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-54

When Should a Company Use ABC? Indirect costs are significant in proportion to direct costs. Goods are complex, requiring many inputs and processes. Complex, low-volume products are profitable while

standard, high-volume products are not. Different departments believe costs are assigned

inaccurately. The company loses bids it thought were low, and wins bids

it thought were high. Operations have changed significantly, but the costing

system has not changed. Introduction of new models result in higher sales, apparent

profits per unit, but an overall income decline.

Page 55: Topic 7a activity based costing sem 2 1516

The McGraw-Hill Companies, Inc. 2006McGraw-Hill/Irwin

4-55

End of Chapter 4