topic 5 – operations management production planning
TRANSCRIPT
![Page 1: Topic 5 – Operations Management Production Planning](https://reader035.vdocuments.us/reader035/viewer/2022062407/56649da95503460f94a972ba/html5/thumbnails/1.jpg)
Topic 5 – Operations Management
Production Planning
![Page 2: Topic 5 – Operations Management Production Planning](https://reader035.vdocuments.us/reader035/viewer/2022062407/56649da95503460f94a972ba/html5/thumbnails/2.jpg)
Learning Objectives
To understand why businesses hold stocks and the costs of stock holding
Analyse the advantages and disadvantages of traditional stock-control systems
Discuss and compare the just-in-case approach and just-in-time (JIT) stock management system
![Page 3: Topic 5 – Operations Management Production Planning](https://reader035.vdocuments.us/reader035/viewer/2022062407/56649da95503460f94a972ba/html5/thumbnails/3.jpg)
Stock / Inventory
• Materials and goods required to allow for the production of and supply of products to the customer
• All businesses hold stock of some kind• Manufacturing businesses will hold stocks in three
distinct forms– Raw materials and components – held until they are used
in the production process– Work in progress– Finished goods – held until despatched to customers
![Page 4: Topic 5 – Operations Management Production Planning](https://reader035.vdocuments.us/reader035/viewer/2022062407/56649da95503460f94a972ba/html5/thumbnails/4.jpg)
Stock holding costs
• Three costs associated with stock holding1. Opportunity cost – the working capital which is
tied up in stocks could be put to a better alternative use
2. Storage costs3. Risk of wastage and obsolescence – Is stock is
held for too long there is a risk of goods deteriorating or becoming outdated
![Page 5: Topic 5 – Operations Management Production Planning](https://reader035.vdocuments.us/reader035/viewer/2022062407/56649da95503460f94a972ba/html5/thumbnails/5.jpg)
Costs of NOT holding stocks
• There are risks of holding very low stock levels• Often called ‘stock-out’ costs
1. Lost sales – unable to supply customers from stock2. Idle production resources – If stocks of raw materials
and components run out, production will have to stop
3. Special orders could be expensive – urgent order given to a supplier – extra costs may be incurred
4. Small order quantities – missing out on economies of scale
![Page 6: Topic 5 – Operations Management Production Planning](https://reader035.vdocuments.us/reader035/viewer/2022062407/56649da95503460f94a972ba/html5/thumbnails/6.jpg)
Optimum stock level
0Quantity of stock held
Cost
s ($
)
Total costs
Optimum
Stock holding costs
Out of stocks costs
![Page 7: Topic 5 – Operations Management Production Planning](https://reader035.vdocuments.us/reader035/viewer/2022062407/56649da95503460f94a972ba/html5/thumbnails/7.jpg)
Optimum order size
• Managers may be tempted to order huge quantities of stock in order to gain EoS and to ensure they don’t run out
• But holding too much stock can cause problems too– Out of date stock Economic order quantity
The optimum or least-cost quantity of stock to re-
order taking into account delivery costs and stock
holding costs
![Page 8: Topic 5 – Operations Management Production Planning](https://reader035.vdocuments.us/reader035/viewer/2022062407/56649da95503460f94a972ba/html5/thumbnails/8.jpg)
![Page 9: Topic 5 – Operations Management Production Planning](https://reader035.vdocuments.us/reader035/viewer/2022062407/56649da95503460f94a972ba/html5/thumbnails/9.jpg)
Controlling stock levels – a graphical approach
Terms to know• Buffering stocks – minimum stock to hold so production can
continue to take place (higher with reorder uncertainty)• Re-order quantity – number ordered each time• Lead time – normal time between order and delivery• Re-order stock level – level that triggers a new order to be sent to
the supplier
![Page 10: Topic 5 – Operations Management Production Planning](https://reader035.vdocuments.us/reader035/viewer/2022062407/56649da95503460f94a972ba/html5/thumbnails/10.jpg)
‘perfect world situation’
![Page 11: Topic 5 – Operations Management Production Planning](https://reader035.vdocuments.us/reader035/viewer/2022062407/56649da95503460f94a972ba/html5/thumbnails/11.jpg)
‘real world situation’
Shipment delayed
Holiday sale Holiday sale
![Page 12: Topic 5 – Operations Management Production Planning](https://reader035.vdocuments.us/reader035/viewer/2022062407/56649da95503460f94a972ba/html5/thumbnails/12.jpg)
Just-in-time Just-in-caseAvoid holding stock by Holding high stock levelsrequiring stock arrive “just-in-case” there is a just as they are needed production problem,in production & completed unexpected rise in demand,products are produced to or delivery problemorder
STOCK MANAGEMENT SYSTEMS
![Page 13: Topic 5 – Operations Management Production Planning](https://reader035.vdocuments.us/reader035/viewer/2022062407/56649da95503460f94a972ba/html5/thumbnails/13.jpg)
Just-in-Case
![Page 14: Topic 5 – Operations Management Production Planning](https://reader035.vdocuments.us/reader035/viewer/2022062407/56649da95503460f94a972ba/html5/thumbnails/14.jpg)
Important JIT factors:• Excellent supplier relationship so supplier can work quickly to fulfill
order• Multi-skilled production staff that can switch jobs on short notice• Flexible set up of equipment and machinery (usually expensive,
computer-controlled machinery)• Accurate demand forecasting• Latest IT equipment allows for more success (data base)• Excellent employer-employee relations to avoid production break• Quality of utmost importance (no time for mistakes)
![Page 15: Topic 5 – Operations Management Production Planning](https://reader035.vdocuments.us/reader035/viewer/2022062407/56649da95503460f94a972ba/html5/thumbnails/15.jpg)
JIT is not suitable for all firms:• Not good if cost of production stoppage from when supplies
don’t arrive far exceed the costs of holding buffer stock of key components
• IT systems needed may be too expensive for small firms• Rising global inflation makes holding extra stock more
beneficial, but storage may be difficult. (less delivery charge, less chance of raw material price increasing, more storage space)
![Page 16: Topic 5 – Operations Management Production Planning](https://reader035.vdocuments.us/reader035/viewer/2022062407/56649da95503460f94a972ba/html5/thumbnails/16.jpg)
Just in Time