top photo shows the front is a large opening for the roll

1
Company Logo UCOP SEISMIC PERFORMANCE LEVEL (OR RATING) III Grizzly Peak & Centennial Drive Berkeley 94705 Silver Storage Storage of flammable materials 1 0 1969 128 X 37.88100 -122.24470 2.059 0.758 Abe Lynn 11/08/2018, 1:00 PM X X X X X X X X 2.0 The front is a large opening for the roll-up door, creating some potential torsional offset. However, the roof and walls are light gage steel with no other contribution for mass. Hazardous contents not anchored. Note: Year built is based on information provided by UCB; however, the type of construction and lack of deterioration appears to be of later construction. X 16' 8' Geotechnical report for Silver Sciences Expansion Geotech Report/CGS website Eric Gardner Top photo shows regular and positive connection between the walls and the roof. Bottom photo shows similar connection between the walls and the foundation. X

Upload: others

Post on 05-May-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Top photo shows The front is a large opening for the roll

Company Logo

UCOP SEISMIC PERFORMANCE LEVEL (OR “RATING”) III

Grizzly Peak & Centennial DriveBerkeley 94705

Silver StorageStorage of flammable materials

1 0 1969128

X

37.88100 -122.244702.059 0.758 Abe Lynn 11/08/2018, 1:00 PM

X

XX

X

X

XXX

2.0

The front is a large opening for the roll-up door, creatingsome potential torsional offset. However, the roof and wallsare light gage steel with no other contribution for mass.Hazardous contents not anchored.

Note: Year built is based on information provided by UCB;however, the type of construction and lack of deteriorationappears to be of later construction.

X

16' 8'

Geotechnical report for Silver Sciences Expansion

Geotech Report/CGS websiteEric Gardner

Top photo showsregular andpositive connectionbetween the wallsand the roof.Bottom photoshows similarconnectionbetween the wallsand the foundation.

X