tob project planner
DESCRIPTION
TOB Project PlannerTRANSCRIPT
Opera and Ballet and Folk Ensemble Period Highlight: 1
PERIODS - DAY
1 2 3 4 5 6 7 8 9 # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # #
Stage 01 - Preliminary design
1
2
3
4
5
6
7
8
Presentation of preliminary design
1
2
3
Stage 02 - Final implementation design
1 Architectural project
2 Constructive Project
3 Electrical Project
4 The mechanical project
5 Detailed Implementation cost estimate
6 Quality standards of products
7 Technical report
8 Technical specifications
9
10 Submission of Tender Documents
Submission of Detailed Design (Implementation Design)
Theatre of
Preliminary design for the auditorium
Planner - Main activities
ACTIVITY
Site visiting
Decision of the main intervention
Preparation of the revised of new
preliminary design as requested in the
Preliminary design for the stage
Report of relevant observations and
suggestions
Preliminary technical specifications
Preliminary cost estimate
Preliminary technical report
Submission of preliminary design
Submission of preliminary technical report
Reflection of relevant comments