210 MW 210 MW

80 MW80 MW

150 MW150 MW

130 MW130 MW

ElectricityElectricity Power Supply of BALI Power Supply of BALI (EXISTING & (EXISTING & PLANNING)PLANNING)

PLTG PemaronPLTG Gilimanuk

Cable Oversea

PLTG / PLTD Pesanggaran

GI Negara

GI GilimanukGI Pemaron

GI AmlapuraGI Payangan

GI Antosari

GI KAPAL

GI PesanggaranGI Nusa Dua

GI Sanur

GI Gianyar

GI Baturiti

GI Pdg Sambian

GI Kuta

POWER AVAILABLE TOTAL 580 MWPOWER AVAILABLE TOTAL 580 MW

PEAK LOAD BALI 2007-8 454 MWPEAK LOAD BALI 2007-8 454 MW

PLTU Batubara Celukan Bawang2009 - 20103x130 MW3x130 MW

PLTU Batubara BALI TIMUR2011 - 2012

2x100 MW2x100 MW

PLTP Bedugul2010 - 2016

10 MW + 3x55 MW10 MW + 3x55 MWPLTU Batubara NusaPenida

2012 - 2014

2x100 MW2x100 MW

Page 3: To Save Energy Every Time HUMAS – PLN Distribusi Bali

Fuel ConsumptionFuel Consumption Electricity Power Supply for Bali:Electricity Power Supply for Bali:

– PLTD Pesanggaran PLTD Pesanggaran 152 MW152 MW– PLTG GilimanukPLTG Gilimanuk 130 MW130 MW HSDHSD– PLTGU PemaronPLTGU Pemaron 80 MW 80 MW– Transfer from Java via cableTransfer from Java via cable 200 MW200 MW

65% electricity in Bali use Fuel (HSD)65% electricity in Bali use Fuel (HSD) Electricity Consumption in Bali is 6.452 MWh per day (Data th 2007)Electricity Consumption in Bali is 6.452 MWh per day (Data th 2007) By Assumption 1 Liter HSD = 3 kWh, so each day we use and burn By Assumption 1 Liter HSD = 3 kWh, so each day we use and burn

HSD almost :HSD almost :65% x 6.452.000 kWh 65% x 6.452.000 kWh = 1.398.000 Liter= 1.398.000 Liter

33

++ 1,4 Million Liter / day 1,4 Million Liter / day If the price of HSD for Industries Rp. 9.000,-/Liter, it means each day If the price of HSD for Industries Rp. 9.000,-/Liter, it means each day

same as same as Rp. 12,6 Billion.Rp. 12,6 Billion.

Page 4: To Save Energy Every Time HUMAS – PLN Distribusi Bali

Budgeting Cost of Production Budgeting Cost of Production

Cost of generate = Rp. 3.322 / kWhCost of distribution = Rp. 304 / kWhCost of Services = Rp. 45 / kWhCOP (Cost of Production) = Rp. 3.671 / kWhAverage Sales price (Subsidy) = Rp. 600 / kWh

Cost of generate = Rp. 3.322 / kWhCost of distribution = Rp. 304 / kWhCost of Services = Rp. 45 / kWhCOP (Cost of Production) = Rp. 3.671 / kWhAverage Sales price (Subsidy) = Rp. 600 / kWh

HSD/Solar price = Rp. 9.000 / LtrCost of transport = Rp. 665 / LtrTotal price for fuel = Rp. 9.665 / LtrSFC = 0,3 Liter/KWH → = 0,3 x Rp. 9.665 = Rp. 3.322 / KWH(excluded cost of operator, maintenance and oil engine)

HSD/Solar price = Rp. 9.000 / LtrCost of transport = Rp. 665 / LtrTotal price for fuel = Rp. 9.665 / LtrSFC = 0,3 Liter/KWH → = 0,3 x Rp. 9.665 = Rp. 3.322 / KWH(excluded cost of operator, maintenance and oil engine)

Page 5: To Save Energy Every Time HUMAS – PLN Distribusi Bali

PEAK LOAD CURVE OF ELECTRICITY SYSTEM PER MONTH TH_2008

451.9 Kamis

31_ J AN

358.5

405.2

337.9

248.8 Nyepi

424.5 Mar_07

225

275

325

375

425

475

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Jan_08 Feb_08 Mar_08 Apr_08 Mei_08 Jun_08Jul_08 Ags_08 Sep'08 Okt'08 Nop'08 Des'08

Page 6: To Save Energy Every Time HUMAS – PLN Distribusi Bali

Peak Load VS Power Available

473.7 473.7

589.3 595.2 587.3 589.7 589.7

349.6 358.5 387.7 400.8 426.2 454.6 451.9

0

100

200

300

400

500

600

700

2002 2003 2004 2005 2006 2007 2008

MW

Power Available ( MW )

Peak Load

OVERVIEW : Comparison

Page 7: To Save Energy Every Time HUMAS – PLN Distribusi Bali

OVERVIEW :

Daily Load Characteristic

100

150

200

250

300

350

400

450

500

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

time

MW

Work day

Sunday

hari Nyepi

Saturday

Page 8: To Save Energy Every Time HUMAS – PLN Distribusi Bali

YEARLY AVERAGEBALI LOAD SYSTEM CURVES

0

50

100

150

200

250

300

350

400

450

500

Harian

Dal

am (

MW

)

Th. 2000 181.7 170.7 170.7 168.7 169.7 167.8 153.8 163.8 187.8 197.8 195.7 191.7 193.7 195.7 195.7 202.6 202.9 230.8 304.8 300.9 284 248.7 216.5 200.7

Th. 2001 207.6 196.6 193.6 189.6 191.6 196.6 175.6 185.6 211.6 224.6 224.6 220.6 224.6 231.6 224.6 226.5 218.9 234.3 337.6 332.6 314.5 286.3 250.3 228.6

Th. 2002 208.2 199.3 193.4 193.4 199.4 203.4 186.3 195.3 220.1 237 234.9 233 237 237 237 201.3 234.5 253.2 352 343 327 289.2 246.3 225.2

Th. 2003 228.5 212.4 208.4 208.4 208.4 216.4 199.4 216.4 242.4 268.4 263.4 257.4 248.3 251.4 251.5 250.1 243.6 253.4 358.5 354 344.4 305.8 268.6 243.9

Th. 2004 234.2 228.3 226.6 228.4 230.7 228.5 213.4 223 257.6 271.2 280.5 276.5 276.5 284.4 280.2 279.2 269 279.5 387.7 380.1 363.2 324.9 282.3 255

Th. 2005 259.2 248.2 240.2 238.2 248.2 255.2 238.2 250.2 276.2 293.2 297.2 297.8 299.5 305.5 305.2 296.7 290.8 299.5 400.8 394.8 375.9 334.7 303.3 267.5

Th. 2006 267.2 254.1 247.1 245.1 247.1 254.1 252.1 269.2 306.2 331.7 333.7 333.7 336.7 338.9 343.4 338.3 327.5 325.4 418.7 426.2 407.1 373.4 322 295

Th.2007 265.9 254.9 248.9 244.9 246.9 261.9 248.9 263.9 308.9 332.6 340.2 339.1 347.1 354.5 351.6 343.6 334.6 326.8 416.6 439.1 419 369.3 323.2 295.5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Th.2001

Th.2002Th.2003

Th.2004

Th.2005

Th 2007

Th 2000

Th 2006

Page 9: To Save Energy Every Time HUMAS – PLN Distribusi Bali

Portion of Consumption

Hotel, 1950, 30%

Residence, 4179, 65%

Public, 323, 5%

Hotel

Residence

Public

Page 10: To Save Energy Every Time HUMAS – PLN Distribusi Bali

Comparison of Consumption & Customers

Hotel30%

Residence65%

Public5%

Hotel

Residence

Public

Hotel0%

Residence99%

Public1%

Hotel

Residence

Public

Page 11: To Save Energy Every Time HUMAS – PLN Distribusi Bali

Result of Observation

• A few of Customer still not care about saving energy. The lamps and equipments still “on” although are not needed.

• Average switching design of the building still using centralize system.

• Many of the customer still using the old lamp that not save energy.

• The uncontrollable equipment still not use auto switching as timer switch to optimize consumption.

Page 12: To Save Energy Every Time HUMAS – PLN Distribusi Bali
Page 13: To Save Energy Every Time HUMAS – PLN Distribusi Bali

Who Responsible ??• PLN

• Customers

• Government

• Producer/manufacture

Saving Energy depends on:

• Habit or attitude

• Design

• Equipment

Page 14: To Save Energy Every Time HUMAS – PLN Distribusi Bali

SAVING TO BURN FUEL

RP. 1 MILYAR/DAY

Page 15: To Save Energy Every Time HUMAS – PLN Distribusi Bali

Easy Steps To Save Energy

• Make commitment to all employees and people you meet.

• Replace all the old lamps with new product by the energy saving lamp.

• Redesign of centralize switching system become partial system.

• Use “timer switching” of all equipment that is not controllable.

• Reduce and shift consumption on the peak load time (17.00 – 22.00 Wita)

Page 16: To Save Energy Every Time HUMAS – PLN Distribusi Bali

Energy Saving Tips

• Turn off your lamps and equipments that are not needed.

• Adjust temperature degree in your freezer depends on capacity.

• Adjust AC temperature with room degree (25 C)• Make sure all of equipments at “off” position (not

stand by) when we do not use and don’t stop only by using remote control.

• Choose lamp and all equipments which can save energy.

• Avoid iron, rice cooker, water pump and other at peak load time (17.00-22.00)

Page 17: To Save Energy Every Time HUMAS – PLN Distribusi Bali

Demand Side Management

Avoid using electricity when they are nor needed

Choose the saving energy lamp

Avoid using iron, rice cooker, water pump at 17.00 -22.00

Reduce only 50 watt 17.00 – 22.00

Operate Genset (Emergency Unit) at 17.00 – 22.00

1

2

3

4

5

Page 18: To Save Energy Every Time HUMAS – PLN Distribusi Bali

Multiple effects of saving energy

• For internal, Saving energy means reducing cost and efficiency.

• Care and contribute to keep sustainable and continuity electricity supply.

• For Nation, it means helping “Load of Subsidy”.• It means helping Nation to keep “Devisa”,

because they do not import the Fuel • It means reducing to burn fuel which same as

reducing CO2 emission, so that, we care about global warming.

Page 19: To Save Energy Every Time HUMAS – PLN Distribusi Bali

Advise

• Mr. Gde Prama said about “3-S Principle” that starts from Saya (Myself), Sekarang (Now) and Sederhana (Simple).

• The Earth is not the ancestors’ inheritance but deposit for descendants.

Page 20: To Save Energy Every Time HUMAS – PLN Distribusi Bali

Conclusion

• Growth of electricity supply and electricity demand is not balance, go to crisis condition.

• The Energy Primer is limited and will finish

• PLN avoids to use fuel consumption and shift to renewable energy

• All customers must know about this crisis and save energy every time