tnpcb · extending the time granted in b.p,no.31 dated 30.07.2018, tnpcb b.p.no.01 dated:...

6

Upload: others

Post on 12-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TNPCB · Extending the time granted in B.P,No.31 dated 30.07.2018, TNPCB B.P.No.01 dated: 22.01.2019 and B.P.No.13 dated 22.04.2019 to switch over to Mechanical Evaporator followed
Page 2: TNPCB · Extending the time granted in B.P,No.31 dated 30.07.2018, TNPCB B.P.No.01 dated: 22.01.2019 and B.P.No.13 dated 22.04.2019 to switch over to Mechanical Evaporator followed
Page 3: TNPCB · Extending the time granted in B.P,No.31 dated 30.07.2018, TNPCB B.P.No.01 dated: 22.01.2019 and B.P.No.13 dated 22.04.2019 to switch over to Mechanical Evaporator followed
Page 4: TNPCB · Extending the time granted in B.P,No.31 dated 30.07.2018, TNPCB B.P.No.01 dated: 22.01.2019 and B.P.No.13 dated 22.04.2019 to switch over to Mechanical Evaporator followed
Page 5: TNPCB · Extending the time granted in B.P,No.31 dated 30.07.2018, TNPCB B.P.No.01 dated: 22.01.2019 and B.P.No.13 dated 22.04.2019 to switch over to Mechanical Evaporator followed
Page 6: TNPCB · Extending the time granted in B.P,No.31 dated 30.07.2018, TNPCB B.P.No.01 dated: 22.01.2019 and B.P.No.13 dated 22.04.2019 to switch over to Mechanical Evaporator followed