    Case Study II

    Modular Bio Containment facility

    BSL 3 Seed LabThomas [email protected]+49 172 610 11 81

  • 8/13/2019 Tmmy_CR and BCD_Academy 2009-00b

    2/18

    The Case

    BSL 3 Seed Lab Client is Confidential Location: Europe Reasons to choose modular approach:

    Fast track realisation, start up before the next vaccination campaignstarts in autumn

    Removable building: in case of an outbreak, the building could be

    moved to e.g. Spain

  • 8/13/2019 Tmmy_CR and BCD_Academy 2009-00b

    3/18

    Overview

    BSL 3 Seed Laboratory within 6 months

  • 8/13/2019 Tmmy_CR and BCD_Academy 2009-00b

    4/18

    Planning (artist view made by our visualisation department)

    Realisation

    . .

  • 8/13/2019 Tmmy_CR and BCD_Academy 2009-00b

    5/18

    Layout, Cleanroom classes

  • 8/13/2019 Tmmy_CR and BCD_Academy 2009-00b

    6/18

    Layout, pressure levels

  • 8/13/2019 Tmmy_CR and BCD_Academy 2009-00b

    7/18

    Shell in shell system

  • 8/13/2019 Tmmy_CR and BCD_Academy 2009-00b

    8/18

    Construction

  • 8/13/2019 Tmmy_CR and BCD_Academy 2009-00b

    9/18

    Requirements

    Several regulations have to be considered in the design:e.g. DIN/EN Norms, GenTSV, EN 1717, DIN 1946 part 7, ..

    First objective: protection of the staff and environment

    Method: Disinfections, HAVC, procedures, Controlled access Method: Locked doors and windows, interlocking, card reader, code

    switches

    Person protection by visible workplaces Method: doors with windows, walls with windows

    Smooth surfaces, easy to clean Method:pool design, pvc welded on floors and wall, trespa ceiling

    Personnel safety equipment

    Safety procedures Method: SOPs, touch less taps, emergency shower, eye shower, towel

    and disinfection dispenser

  • 8/13/2019 Tmmy_CR and BCD_Academy 2009-00b

    10/18

    Requirements

    Waste treatment Method: double door decontamination autoclave, kill tank, H13 filters

    Disinfection of working table tops

    Method: curb on table tops, water retention on the floor, no floor drains Fire protection

    Method: F90 Building, F30 Windows, fire extinguisher, no sprinkler,floor curb at the entrance, problem to keep underpressure

    Drinking water protection Method: water line separation valve

    Hermetic closure of the building in case of an emergency fumigation

    Emergency power supply for ventilation, illumination, emergency call andcommunication systems Two escape routes

  • 8/13/2019 Tmmy_CR and BCD_Academy 2009-00b

    11/18

    Decontamination Autoclave

    Media connectionsMinimised, centralised,In separate insulated panels

    roomsPVC on walls and floor,Trespa on the ceiling

    roomsFumigation with H2O2, triple

    glas windows,Shell-System fumigation withformaldehyde

  • 8/13/2019 Tmmy_CR and BCD_Academy 2009-00b

    12/18

    HVAC

  • 8/13/2019 Tmmy_CR and BCD_Academy 2009-00b

    13/18

    Police filter H13Fumigation withformalin

    Waste air incinerationFor kill tank

    Pressureregulator

    For small roomswith a water valve

    Volume control valvesAll installed in the technicalarea

    Shell-Filter H13

    Fumigation with formalin

  • 8/13/2019 Tmmy_CR and BCD_Academy 2009-00b

    14/18

    Fumigation with H2O2

    Disinfection procedure 10 pages word document! VHP compatibility: Steris-Bioquell(see also: http://www.bioquell.com/)

  • 8/13/2019 Tmmy_CR and BCD_Academy 2009-00b

    15/18

    Time schedule

  • 8/13/2019 Tmmy_CR and BCD_Academy 2009-00b

    16/18

    Time Schedule

  • 8/13/2019 Tmmy_CR and BCD_Academy 2009-00b

    17/18

    Cost benchmarks

    Transport;

    50.000,00;

    4%

    Engineering

    / Hours;

    185.000,00;

    13%

    Equipment;

    1.184.725,0

    0; 83%

    Modules;

    620.000,00;

    52%

    HVAC;

    350.000,00;

    30%

    Waste

    Water

    Treatment;

    96.500,00;8%

    Decontamin

    ationAutoclave;

    82.500,00;

    7%

    Monitoring;

    30.925,00;

    3%Lab

    Furniture;4.800,00;

    0%

    1,4 Million Euro

    5,400 /m

  • 8/13/2019 Tmmy_CR and BCD_Academy 2009-00b

    18/18

    Questions ?