Tittabawassee River System Natural Resource Damage Assessment Proposed Settlement and Restoration November 21, 2019 Lisa L. Williams U.S. Fish and Wildlife Service Tittabawassee River Trustee Council

Upload: others

Post on 25-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Tittabawassee River System Natural Resource Damage

Assessment

Proposed Settlement and RestorationNovember 21, 2019

Lisa L. WilliamsU.S. Fish and Wildlife Service

Tittabawassee River Trustee Council

Page 2: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Overview Here tonight to share information about the

settlement – including input from you! Open house format Presentation first

Natural Resource Damage Assessment (NRDA) and Restoration (NRDAR)

Restoration-based settlement Projects Funding alternatives

How to provide input

Overview

Page 3: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

How did we get here? Historically, Dow released

chemicals into the environment

Cleanup is well underway Natural Resource Damage

Assessment (NRDA) was started to address injuries to natural resources and losses to public use and enjoyment of them

NRDAR Introduction

Page 4: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

NRDA is separate from cleanup Cleanup processes directed by

U.S. EPA and the State of Michigan Stop releases of contaminants

Remove or contain contamination

Reduce risks to health and environment

NRDA conducted by Trustees Assess injuries and loss of services

Determine restoration needed

Depends on rate of cleanup

Principle that ‘polluter pays’

NRDAR Introduction

Page 5: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

NRDAR conducted by Trustees State of Michigan represented by

EGLE DNR Attorney General

Saginaw Chippewa Indian Tribe of Michigan Department of the Interior represented by

U.S. Fish and Wildlife Service Bureau of Indian Affairs

NRDAR Introduction

Page 6: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Jim Sygo

Started his career in Saginaw

Career focused on improving the environmental quality of Michigan

Retired as deputy director of MDEQ, he was instrumental in guiding this NRDA from initiation to near completion of the negotiations

Tribute

1949 - 2018

“A Quiet Conservation Hero”

Page 7: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Natural Resource Damage Assessment and Restoration

NRDAR Introduction

Assessment Negotiation

Settlement OR Litigation

RESTORATION

Page 8: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

“Injury – Restoration Handshake” Examples

NRDAR Introduction

What was lost? How can it be addressed?

Fewer birds produced per nest More habitat for that type of bird

Damage to habitat (e.g. floodplain forest) during cleanup

Similar habitat protected, created, or improved

Less fishing enjoyment because of consumption advisories

Improved fish populations and opportunities to fish

Less natural resource enjoyment because of soil advisories

Increased nature preserve areas that people can go to

Page 9: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Restoration Ideas & Projects

Trustees collected ideas from the public and local stakeholder groups over many years

Trustees evaluated restoration ideas using NRDA-specific criteria

Trustees and Dow worked on projects that could address multiple categories of injury or losses:

For natural resources that use different habitat types: floodplain, uplands, riverine, bay

For natural resource-based recreation: fishing, nature viewing, hiking, hunting, boating

Restoration Development

Page 10: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Proposed Settlement Will restore and

protect about 8,000 acres and improve fish populations in the rivers and bay

Will provide at least $5M for future projects with public input

Will provide up to $10M for long-term stewardship

Settlement

Page 11: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Proposed Settlement

Settlement

Amount Description

$15M Dow to pay Trustees for new projects, long term care of projects, monitoring, staff time

$6.75M Dow to pay Trustees for 5 specific projects

~$50M Estimate of what it would cost the Trustees to do the 8 projects that Dow will do

~$5M Dow to pay Trustees for assessment costs

~$77M Estimate for settlement amount used in press release

Page 12: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Proposed Settlement Consent Decree

lodged with federal court

Draft Restoration Plan / Environmental Assessment released by the Trustees

Public review and written comment for both open now until December 29

Settlement

Page 13: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

ProjectsSettlement

13 Restoration Projects 8 that Dow will

implement

5 that Trustees and partners will implement

2 Additional Projects Agreement between

Dow and the State

BaySail and Lighthouse by Bay City

Page 14: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Projects NRDA Restoration Projects

that Dow will implement Dow has 5 years to

complete construction

Dow will maintain projects for 5 years (or longer to meet performance standards)

Trustees review and approve work plans, oversee work

Settlement

Page 15: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Settlement

Midland Area Projects

Page 16: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Midland Area Projects Eagle Ridge

140 acres Next to Stratford Park

Settlement

Trails, overlooks, parking Wetland restoration Non-native species control

Page 17: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Settlement

Midland Area Projects Greater Midland

Nature Preserve 1,460 acres

Page 18: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Settlement

Midland Area Projects Midland Fish Passage

Dow Dam

Page 19: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Midland Area Projects Tittabawassee River

Floodplain Restoration 490 acres Bike and nature trails

Settlement

Page 20: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Tittabawassee River Area Tittabawassee River

Green Corridor 2,000 acres Conservation easements

Settlement

Page 21: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Tittabawassee River Area Thomas Township

Nature Preserve 60 acres $1M for habitat, trails,

river access

Settlement

Page 22: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Settlement

Saginaw Area Projects

Page 23: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Settlement

Saginaw Area Projects Shiawassee National

Wildlife Refuge Restoration Benefits to >2,700 acres Improved water flows Fish spawning areas Migratory birds, waterfowl

Page 24: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Settlement

Saginaw Area Projects Shiawassee National

Wildlife Refuge Expansion ~150 acres by Green

Point Environmental Learning Center

~200 acres to expand hunting

Page 25: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Settlement

Saginaw Area Projects Saginaw Riverfront Park

$1M for habitat improvements, trails, and long term care on 322 acres

Right in neighborhoods Many potential trail

connections DNR and Saginaw

County Parks

Page 26: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Settlement

Bay City Area Projects

Page 27: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Settlement

Bay City Area Projects

Bay City Ecological Restoration 415 acres Trails Shoreline fishing

platforms

Page 28: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Settlement

Bay City Area Projects Saginaw River Mouth

Boating Access Site Expansion 50 new parking spaces 3 new launch lanes,

bringing total to 8

Existing site

Page 29: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Settlement

Bay City Area Projects BaySail docking

facility and education center* Dow to provide land

and other support

*State-Dow agreement (non-NRDA)

Page 30: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Settlement

Bay City Area Projects Lighthouse Renovation*

Dow to provide funding for lighthouse renovation and preservation

Lighthouse to be opened to public

*State-Dow agreement (non-NRDA)

Page 31: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Settlement

Saginaw Bay Spawning Reefs $1M to expand spawning reef habitat in Saginaw Bay

Page 32: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Settlement

Saginaw Chippewa Indian Tribe’s Restoration Project

$500,000 to expand and link nature preserves near Saganing River and Saginaw Bay

Page 33: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Proposed Settlement Will restore and

protect about 8,000 acres and improve fish populations in the rivers and bay

Will provide at least $5M for future projects with public input

Will provide up to $10M for long-term stewardship

Settlement

Page 34: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Funding Consent Decree

requires Dow to pay $15M to Trustees At least $5M for new

project proposals

Remainder for long-term stewardship and Trustee costs

Draft Restoration Plan describes alternatives

Settlement

Page 35: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Funding Alternative A: “No

action” alternative, used for comparison

Alternative B: 13 projects

$15M as flexible funding > $5M projects through public

process

Trustees adjust over time among stewardship, monitoring, oversight, and additional new projects

Settlement

Alternative C: 13 projects

$15M as fixed funding $5M projects through public

process

$6M stewardship

$2M monitoring

$2M oversight

Page 36: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Restoration Criteria

Developed by Trustees for this case Based on criteria in federal regulations

Used to ensure “Injury–Restoration Handshake”

Guide selection of projects Used to evaluate projects in the settlement

For future projects that are proposed

Restoration Criteria

Page 37: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Public Input Proposed Consent

Decree Send written

comments to the Department of Justice

Instructions in Federal Register Notice

Draft Restoration Plan Send written

comments to Trustees Instructions on

website:

Settlement

www.fws.gov/midwest/es/ec/nrda/TittabawasseeRiverNRDA

Page 38: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Public Input

Restoration ideas welcomed by the Trustees at any time

Restoration project proposals in response to a Request for Proposals

Expect within about a year of Consent Decree being finalized

Settlement

Page 39: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Estimated Schedule

Timeline

Consent Decree Lodged

(11/8/2019)

Begin Judicial Review

of CD(3/2020)Complete

Review and Revise Plan

(2/2020)

Years 3-5 of Dow Project

Construction, Monitoring,

Maintenance (5/2022 – 5/2025)

Last ConstructionCompleted on Dow Projects

(5/2025)

Trustees Start

Projects and

Oversee Dow

(5/2020)

Public Comments

Due(12/29/2019)

2022 2023 2024 2025 2026 2027 2028 2029 2030+

2019 2020 2021

Federal Register Notice

(11/14/2019)

CD Approved

(5/2020)

Dow Pays and Starts

Projects(5/2020)

Year 2 of Dow

Projects Starts

(5/2021)RFP for

New Projects (2021)

Last Monitoring & Maintenance

Shifts from Dow to Trustee

Funding (5/2030)

?

Page 40: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Summary NRDAR is a distinct process from the

cleanup The goal of NRDAR is to restore and

compensate for losses over time NRDAR must…

address injuries that resulted from the release of contaminants

focus on natural resources The Trustees look forward to discussing the

settlement and getting input for the future

Summary

Page 41: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Rest of this Meeting Open house style Groups of posters

Overview and general questions with me Fisheries and Saginaw Riverfront Park with Jessica

Mistak, DNR Midland area projects with Clark McCreedy, FWS Tittabawassee River projects with Jack Dingledine, FWS;

Polly Synk, MDAG; and John Corriveau, Thomas Township

Shiawassee National Wildlife Refuge projects with Pam Repp and Eric Dunton, FWS

Bay City area projects with Joe Victory, EGLE Wrap up by 9pm

Open House

Page 42: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Contact InformationU.S. Fish and Wildlife Service:

Lisa L. WilliamsU.S. Fish and Wildlife Service2651 Coolidge Road, Ste. 101East Lansing, MI 48848517-351-8324 phone [email protected]

Saginaw Chippewa Indian Tribe of Michigan:Sally KniffenSaginaw Chippewa Tribe7070 E. BroadwayMt. Pleasant, MI 48858989-775-4015 [email protected]

Contacts

Page 43: Tittabawassee River System Natural Resource Damage …...Nov 21, 2019  · Improved fish populations and opportunities to fish. Less natural resource enjoyment because of soil advisories:

Contact InformationMichigan Department of Environment, Great Lakes, and Energy:

Joe VictoryEGLEP.O. Box 30426Lansing, MI [email protected]

Michigan Department of Natural Resources:Jessica Mistak, SupervisorHabitat Management UnitDNR Fisheries Division6833 Hwy 2, 41, and M-35Gladstone, MI [email protected]