TIME MANAGEMENT UPDATE
PROGRESS...
• Tomorrow, on the 18th of November we are planning to film the rest of our performance scenes with Hollie. Ideally, we would prefer to use the lesson time to film more narrative sections of our video as we still have a lot left to film, however, as Aaron is still at school this makes it impossible for us to use him on Tuesday. As a result of this, we have all arranged to meet on the 22nd of November to film the rest of our narrative sections.
• Personally, I need to finish my locations and health & safety post in more detail, which I am aiming to finish and post by Tuesday 18th of November.
Below I have circled on my calendar upcoming tasks that will be completed .
The weather for Tuesday looks to be
cloudy with a chance of showers. This will not effect
us as we will be filming indoors.
• However, there is also a chance of rain on Saturday, which is when we are planning to film our outdoor narrative sections of our music video. Whilst this does not interfere with the actual narrative of our music video - as the narrative sections are flashbacks, (although as the flashbacks are supposed to indicate happier times in the couple's relationship, if it is raining some audience members may view it as pathetic fallacy), it will be hazardous for us to use the electrical equipment in the rain.