Page 1: Tier 1 in Dubna for CMS:  plans and prospects Korenkov Vladimir  LIT, JINR

Tier 1 in Dubna for CMS: plans and prospects

Korenkov Vladimir LIT, JINR

AIS-GRID School

2013, April 25

Page 2: Tier 1 in Dubna for CMS:  plans and prospects Korenkov Vladimir  LIT, JINR

Tier 0 at CERN: Acquisition, First pass reconstruction,

Storage & Distribution

[email protected]

1.25 GB/sec (ions)

2

Page 3: Tier 1 in Dubna for CMS:  plans and prospects Korenkov Vladimir  LIT, JINR

Tier Structure of GRID Distributed Computing:

Tier-0/Tier-1/Tier-2

[email protected] 3

Tier-0 (CERN):• accepts data from the CMS Online Data Acquisition and Trigger System

• archives RAW data • the first pass of reconstruction and performs Prompt Calibration

• data distribution to Tier-1Tier-1 (11 centers):• receives a data from the Tier-0 • data processing (re-reconstruction, skimming , calibration etc)• distributes data and MC to the other Tier-1 and Tier-2• secure storage and redistribution for data and MCTier-2 (>200 centers):• simulation• user physics analysis

Page 4: Tier 1 in Dubna for CMS:  plans and prospects Korenkov Vladimir  LIT, JINR

4 Wigner Data Centre, Budapest

•New facility due to be ready at the end of 2012•1100m² (725m²) in an existing building but new infrastructure•2 independent HV lines•Full UPS and diesel coverage for all IT load (and cooling)•Maximum 2.7MW

Slide from I.Bird (CERN, WLCG) presentation at GRID2012 in Dubna

Page 5: Tier 1 in Dubna for CMS:  plans and prospects Korenkov Vladimir  LIT, JINR

• Tier 0 • Tier 1 • Tier 2

WLCG Grid Sites

• Today >150 sites• >300k CPU cores• >250 PB disk

• Today >150 sites• >300k CPU cores• >250 PB disk

Page 6: Tier 1 in Dubna for CMS:  plans and prospects Korenkov Vladimir  LIT, JINR

Russian Data Intensive Grid infrastructure (RDIG)

RDIG Resource Centres:– ITEP– JINR-LCG2 (Dubna)– RRC-KI– RU-Moscow-KIAM– RU-Phys-SPbSU– RU-Protvino-IHEP– RU-SPbSU– Ru-Troitsk-INR– ru-IMPB-LCG2– ru-Moscow-FIAN– ru-Moscow-MEPHI– ru-PNPI-LCG2 (Gatchina)– ru-Moscow-SINP- Kharkov-KIPT (UA)- BY-NCPHEP (Minsk) - UA-KNU

The Russian consortium RDIG (Russian Data Intensive Grid), was set up in September 2003 as a national federation in the EGEE project. Now the RDIG infrastructure comprises 17 Resource Centers with > 20000 kSI2K CPU and > 4500 TB of disc storage.

Page 7: Tier 1 in Dubna for CMS:  plans and prospects Korenkov Vladimir  LIT, JINR

77

Country Normalized CPU time (2012-2013)

All Country - 19,416,532,244 Russia- 410,317,672 (2.12%)Job 726,441,731 23,541,182 ( 3.24%)

Page 8: Tier 1 in Dubna for CMS:  plans and prospects Korenkov Vladimir  LIT, JINR

88

Country Normalized CPU time per VO (2012-2013)

Page 9: Tier 1 in Dubna for CMS:  plans and prospects Korenkov Vladimir  LIT, JINR

999

Russia Normalized CPU time per SITE and VO (2012-2013)

All VORussia - 409,249,900 JINR - 183,008,044

CMSRussia - 112,025,416JINR - 67,938,700 (61%)

Page 10: Tier 1 in Dubna for CMS:  plans and prospects Korenkov Vladimir  LIT, JINR

1010

Frames for Grid cooperation with CERNFrames for Grid cooperation with CERN 2001: EU-dataGrid Worldwide LHC Computing Grid (WLCG) 2004: Enabling Grids for E-sciencE (EGEE) EGI-InSPIRE CERN-RFBR project “Grid Monitoring from VO perspective”

Collaboration in the area of WLCG monitoringWLCG today includes more than 170 computing centers where more than 2 million jobs are being executed daily and petabytes of data are transferred between sites.Monitoring of the LHC computing activities and of the health and performance of the distributed sites and services is a vital condition of the success of the LHC data processing.

WLCG Transfer Dashboard

Monitoring of the XRootD federations

WLCG Google Earth Dashboard

Tier3 monitoring toolkit

Page 11: Tier 1 in Dubna for CMS:  plans and prospects Korenkov Vladimir  LIT, JINR

JINR –LCG2 Tier2 site

SiGNET

CYFRONET-LCG2

JINR-LCG2

UKI-SCOTGRID-GLASGOW

UKI-LT2-QMUL

INFN-LNL-2

UKI-LT2-IC-HEP

IN2P3-CC-T2

DESY-HH

GRIF

0 50000000 100000000 150000000 200000000 250000000 300000000 350000000

140630952

145921848

159318992

162252372

164925024

170651748

173175624

220139784

304761320

343456360

WLCG Ranking of JINR T2 site in Europe (March, 2012 - February, 2013)

GRIF - Orsay, FranceDESY-HH - Hamburg, GermanyIN2P3-CC-T2 - Lyon, FranceUKI-LT2-IC-HEP - London, UKINFN-LNL-2 - Legnaro, ItalyUKI-LT2-QMUL - London, UKUKI-SCOTGRID-GLASGOW - Glasgow, UKJINR-LCG2 - Dubna, RussiaCYFRONET-LCG2 - Krakow, PolandSiGNET - Ljubljana, Slovenia

Europe/Tier2

Normalised CPU time (HEPSPEC06.Hours)

Provides the largest share to the Russian Data Intensive Grid (RDIG) contribution to the global WLCG/EGEE/EGI Grid-infrastructure. JINR secured 46% of the overall RDIG computing time contribution to the solution of LHC tasks

During 2012, CICC has run more than 7.4 million jobs, the overall CPU time spent exceeding 152 million hours (in HEPSpec06 units)

Presently, the CICC computing cluster comprises 2582 64-bit processors and a data storage system of 1800 TB total capacity.

Page 12: Tier 1 in Dubna for CMS:  plans and prospects Korenkov Vladimir  LIT, JINR

1212

WLCG Tier1 center in RussiaWLCG Tier1 center in Russia• Proposal to create the LCG Tier1 center in Russia (official letter by Minister Proposal to create the LCG Tier1 center in Russia (official letter by Minister

of Science and Education of Russia A. Fursenko has been sent to CERN DG R. of Science and Education of Russia A. Fursenko has been sent to CERN DG R. Heuer in March 2011).Heuer in March 2011).

• The corresponding point to include in the agenda of next 5x5 meeting The corresponding point to include in the agenda of next 5x5 meeting Russia-CERN (October 2011)Russia-CERN (October 2011)- - for all four experiments ALICE, ATLAS, CMS and LHCbfor all four experiments ALICE, ATLAS, CMS and LHCb- ~10% of the summary Tier1 (without CERN) resources- ~10% of the summary Tier1 (without CERN) resources- increase by 30% each year- increase by 30% each year- draft planning (proposal under discussion) to have prototype in the end- draft planning (proposal under discussion) to have prototype in the end of 2012, of 2012, and full resources in 2014 to meet the start ofand full resources in 2014 to meet the start ofnext working LHC session.next working LHC session.

• Discussion about distributed Tier1 in Russia for LHC and FAIRDiscussion about distributed Tier1 in Russia for LHC and FAIR

Page 13: Tier 1 in Dubna for CMS:  plans and prospects Korenkov Vladimir  LIT, JINR

Project: «Creation of the automated system of data processing for experiments at the Large Hadron Collider (LHC) of Tier1 level and maintenance of Grid-services for a distributed analysis of these data»

Terms: 2011-2013

Type of project: R&D

Cost: federal budget - 280 million rubles (~8.5 MCHF), extrabudgetary sources - 50% of the total cost

Leading executor: RRC KI «Kurchatov institute» for ALICE, ATLAS, and LHC-B

Co-executor: LIT JINR (Dubna) for the CMS experiment

Project goal: creation in Russia of a computer-based system for processing experimental data received at the LHC and provision of Grid-services for a subsequent analysis of these data at the distributed centers of the LHC global Grid- system.

Core of the proposal: development and creation of a working prototype of the first- level center for data processing within the LHC experiments with a resource volume not less than 15% of the required one and a full set of grid-services for a subsequent distributed analysis of these data.

Joint NRC "Kurchatov Institute"Joint NRC "Kurchatov Institute" – JINR– JINR Tier1 ComputingTier1 Computing CentreCentre

Page 14: Tier 1 in Dubna for CMS:  plans and prospects Korenkov Vladimir  LIT, JINR

14 The Core of LHC Networking: LHCOPN and Partners

14

Page 15: Tier 1 in Dubna for CMS:  plans and prospects Korenkov Vladimir  LIT, JINR
Page 16: Tier 1 in Dubna for CMS:  plans and prospects Korenkov Vladimir  LIT, JINR

JINR CMS Tier-1 progress

● Disk & server installation and tests: done● Tape system installation: done● Organization of network infrastructure

and connectivity to CERN via GEANT: done● Registration in GOC DB and APEL: done● Tests of WLCG services via Nagios: done

20122012

(done)(done)

20132013 20142014

CPU (HEPSpec06)CPU (HEPSpec06)

Number of coreNumber of core

1440014400

12001200

2880028800

24002400

5760057600

48004800

Disk (Terabytes)Disk (Terabytes) 720720 35003500 45004500

Tape (Terabytes)Tape (Terabytes) 7272 57005700 80008000

Page 17: Tier 1 in Dubna for CMS:  plans and prospects Korenkov Vladimir  LIT, JINR

CMS-specific activity● Currently commissioning Tier-1 resource for Currently commissioning Tier-1 resource for CMSCMS::

– Local Tests of CMS VO-services and CMS SW Local Tests of CMS VO-services and CMS SW – The PhEDEx LoadTest (tests of data transfer links)The PhEDEx LoadTest (tests of data transfer links)– Job Robot Tests (or Job Robot Tests (or tests via HammerCloudtests via HammerCloud))– Long-running CPU intensive jobsLong-running CPU intensive jobs– Long-running I/O intensive jobsLong-running I/O intensive jobs

● PHDEDX tPHDEDX transferred of ransferred of RAW RAW input data to our storage input data to our storage element with transfer efficiency around 90%element with transfer efficiency around 90%

● Prepared services and data storage for the reprocessing of Prepared services and data storage for the reprocessing of 20120122 88 TeV reprocessing TeV reprocessing

Page 18: Tier 1 in Dubna for CMS:  plans and prospects Korenkov Vladimir  LIT, JINR

ServicesServices• Security (GSI)Security (GSI)• Computing Element (CE)Computing Element (CE)• Storage Element (SE)Storage Element (SE)• Monitoring and AccountingMonitoring and Accounting• Virtual Organizations (VOMS)Virtual Organizations (VOMS)• Workload management (WMS)Workload management (WMS)• Information service (BDII)Information service (BDII)• File transfer service (FTS + PhEDEx)File transfer service (FTS + PhEDEx)• SQUID ServerSQUID Server• CMS user services (CMS user services (Reconstruction Services, Analysis Reconstruction Services, Analysis

Services etcServices etc))1818

Page 19: Tier 1 in Dubna for CMS:  plans and prospects Korenkov Vladimir  LIT, JINR
Page 20: Tier 1 in Dubna for CMS:  plans and prospects Korenkov Vladimir  LIT, JINR

20Objective Target date

Presentation the Execution Plan to WLCG OB Sep 2012

Prototype

Disk & Servers installation and tests Oct 2012

Tape system installation Nov 2012

Organization of network infrastructure and connectivity to CERN via GEANT (2 Gb) Nov 2012

WLCG OPN integration (2 Gb) and JINR-T1 registration in GOCDB including integration with the APEL accounting system

Dec 2012

M1 Dec 2012

LHC OPN functional tests (2 Gb) May 2013

Test of WLCG and CMS services (2 Gb LHCOPN) May 2013

Test of tape system at JINR: data transfers from CERN to JINR (using 2 Gb LHC OPN) May 2013

Test of publishing accounting data May 2013

Definition of Tier 2 sites support May 2013

Connectivity to CERN 10 Gb Jul 2013

M2 Jul 2013

LHC OPN functional tests (10 Gb) Aug 2013

Test of tape system at JINR: data transfers from CERN to JINR (using 10 Gb LHC OPN) Aug 2013

Upgrade of tape, disk and CPU capacity at JINR Nov 2013

M3 Nov 2013

85% of the job capacity running for at least 2 months

Storage availability > 98% (functional tests) for at least 2 months

Running with > 98% Availabilities & Reliabilities for at least 30 days

WLCG MoU as an associate Tier-1 center Feb 2014

Disk & Tape & Servers upgrade Oct 2014

M4 Dec 2014

Milestones of the JINR CMS Tier-1 Deployment and Commissioning

Page 21: Tier 1 in Dubna for CMS:  plans and prospects Korenkov Vladimir  LIT, JINR

Lyon/CCIN2P3Barcelona/PIC

De-FZK

US-FNAL

Ca-TRIUMF

NDGF

CERNUS-BNL

UK-RAL

Taipei/ASGC

26 June 2009

Amsterdam/NIKHEF-SARA

Bologna/CNAF

Russia:NRC KI

JINR

Page 22: Tier 1 in Dubna for CMS:  plans and prospects Korenkov Vladimir  LIT, JINR

22

Staffing

ROLE FTE

Administrative 1.5

Network support 2

Engineering Infrastructure

2.5

Hardware support 3

Core software and WLCG middleware

4.5

CMS Services 3.5

Total 17

Korenkov V.

Dolbilov A.

Shmatov S.

Trofimov V.

Mitsyn V.