tia 1179 healthcare standard - a million square … · tia 1179 healthcare standardtia 1179...

28
TIA 1179 Healthcare Standard TIA 1179 Healthcare Standard A Million Square Foot Case Study Study Technology Solutions :: Building for the Future ™

Upload: trantuong

Post on 02-Aug-2018

244 views

Category:

Documents


1 download

TRANSCRIPT

TIA 1179 Healthcare StandardTIA 1179 Healthcare StandardA Million Square Foot Case

StudyStudy

Technology Solutions :: Building for the Future ™

Why?Why?

Technology Solutions :: Building for the Future ™

Technology Solutions :: Building for the Future ™

Data

AudioVisual

Voice

OSPOR

IntegrationNurse Call

Network Wireless

AudioVisual OSP

CATVI i Infrastructure

Paging/Intercom RFID/DAS

TelemetryImaging

Special Systems

Building Controls Security Physiological

Monitoring

Pharmacy

Technology Solutions :: Building for the Future ™

y

Technology Solutions :: Building for the Future ™

TR-42 Sub-Committee

• Reactivated in 2008eact ated 008• Chaired by Herb Congdon

Technology Solutions :: Building for the Future ™

TIA-1179

R tifi d i J l 2010• Ratified in July 2010• First Standards’ Document to Address

Infrastructure & Systems Within aInfrastructure & Systems Within a Specific Space or environment

• Amended on a 5 year cycle• Amended on a 5 year cycle

Technology Solutions :: Building for the Future ™

Agenda

P th• Pathways• Equipment Room Size

I f ti C t l• Infection Control• Work Area

Technology Solutions :: Building for the Future ™

Pathways

Technology Solutions :: Building for the Future ™

Pathways

Technology Solutions :: Building for the Future ™

Pathways

Technology Solutions :: Building for the Future ™

Equipment Rooms

• Minimum of 130 Square Feet• Allows for 100% Growth• Allows for 100% Growth• Proper Utilities to Sustain Growth

Technology Solutions :: Building for the Future ™

Equipment Rooms

Technology Solutions :: Building for the Future ™

Equipment Rooms

Technology Solutions :: Building for the Future ™

Equipment Rooms

Technology Solutions :: Building for the Future ™

Infection Control

• Minimal Disruption of PathwaysMinimal Disruption of Pathways• Incorporates Conduits• Work Area Densities That Allow forWork Area Densities That Allow for

Future Needs• Changes Become More Costlyg y

Technology Solutions :: Building for the Future ™

Infection Control

Technology Solutions :: Building for the Future ™

Infection Control

Technology Solutions :: Building for the Future ™

Work Area

Technology Solutions :: Building for the Future ™

Work Area

Technology Solutions :: Building for the Future ™

Work Area

Densities

L 2 6• Low 2-6• Waiting Room

Medium 6 12• Medium 6-12• Patient Room

• High 14+• High 14+• Operating Room

Technology Solutions :: Building for the Future ™

Technology Solutions :: Building for the Future ™

Dispatch

Technology Solutions :: Building for the Future ™

Dispatch

Technology Solutions :: Building for the Future ™

Paging

Technology Solutions :: Building for the Future ™

OR Integration

Technology Solutions :: Building for the Future ™

Final QuestionsFinal Questions

Technology Solutions :: Building for the Future ™

Thank You!

To learn more about our uniqueTo learn more about our unique design approach:

Visit us on the web:www.datacomdesign.comwww.datacomdesign.com

E-mail: [email protected]

Technology Solutions :: Building for the Future ™