2
124 Project Order Map Showing 2014 Enrollment Projections for 2022 as a Percentage of Schools’ Capacities Map Legend >140% 130%-139% 120%-129% 110%-119% 100%-109% 90%-99% < 89% Priority Funding Area La Plata 136.1% Thomas Stone 92.3% Westlake 136.7% North Point 152.1% 30 Level Changes High Traffic Site Lack of Modern Technology Poor Artificial Lighting Worn Finishes Poor Daylight Stone High School was originally constructed in 1969, and received an addition and renovation in 1998. Interior finishes are in fair condition, and floors show wear from high-intensity use. VCT floors in the addition may have had installation issues, and show an inordinate amount of wear. Over half of the classrooms have no access to natural light. The technological infrastructure in most areas is insufficient. Level changes throughout corridors create accessibility issues. The spatial layout makes wayfinding difficult and limits access to natural light. Exterior cladding is in good condition. Mechanical systems are in fair condition, and a back-flow preventer is needed. Electrical systems are in good condition, but the emergency generator requires maintenance. Site entrances are located along a heavily trafficked road, and congestion may pose a problem. Exterior lighting is insufficient and the football field is not easily accessed by pedestrians. Thomas Stone High School ADA Issues Building Facts

Upload: others

Post on 26-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Thomas Stone High School - Charles County Public Schools · 2-3 Replace / Reno. 3-4 Reno. / Maint. >4 Maintenance Survey Categories 3.90 This School Project Determination Building

124

Project Order

Map Showing 2014 Enrollment Projections for 2022 as a Percentage of Schools’ Capacities

Map Legend

>140%

130%-139%

120%-129%

110%-119%

100%-109%

90%-99%

< 89%

Priority Funding Area

La Plata136.1%

Thomas Stone92.3%

Westlake136.7%

North Point152.1%

30

Level Changes

High Traffic Site

Lack of Modern

Technology

Poor Artificial Lighting

Worn FinishesPoor Daylight

Stone High School was originally constructed in 1969, and received an addition and

renovation in 1998. Interior finishes are in fair condition, and floors show wear from

high-intensity use. VCT floors in the addition may have had installation issues, and show

an inordinate amount of wear. Over half of the classrooms have no access to natural light.

The technological infrastructure in most areas is insufficient. Level changes throughout

corridors create accessibility issues. The spatial layout makes wayfinding difficult and

limits access to natural light. Exterior cladding is in good condition. Mechanical systems

are in fair condition, and a back-flow preventer is needed. Electrical systems are in

good condition, but the emergency generator requires maintenance. Site entrances are

located along a heavily trafficked road, and congestion may pose a problem. Exterior

lighting is insufficient and the football field is not easily accessed by pedestrians.

Thomas StoneHigh School

ADA Issues

Building Facts

Page 2: Thomas Stone High School - Charles County Public Schools · 2-3 Replace / Reno. 3-4 Reno. / Maint. >4 Maintenance Survey Categories 3.90 This School Project Determination Building

125

Current Building Score

MaintenancePriority

Prescribed Work Cost Analysis

Recommendations

16

3.90

Minor Renovation.

It is recommended that Stone High undergo a minor

architectural renovation as well as generator, power

supply, and site upgrades.

ARCH

MEP

SITE

SURVEY 4.12

2.35

4.70

3.43

<2 Replace

2-3 Replace / Reno.3-4 Reno. / Maint.>4 Maintenance

SurveyCategories 3.90

This School Project Determination

BuildingScore

Description Qty. Unit County Share State Share Cost/Unit TOTAL

ARCH

Flooring Repair 225,957 sf $677,871 $- $3 $677,871

MEP

Generator Repair 1 ls $40,000 $- $40,000 $40,000

Upgrade/Replace Electrical Distribution Systems 225,957 sf $167,208 $284,706 $2 $451,914

Upgrade Water Heater 225,957 sf $259,851 $- $1 $259,851

Upgrade Cooling Tower 225,957 sf $83,604 $142,353 $1 $225,957

Security System Upgrade 225,957 sf $50,162 $85,412 $1 $135,574

SITE

Paving/Concrete 10,000 sf $100,000 $- $10 $100,000

Exterior Lighting 20 ea $130,000 $- $6,500 $130,000

Drainage 1 ls $600,000 $- $600,000 $600,000

Parking Lot 3,000 sy $216,000 $- $72 $216,000

Subtotals $2,324,696 $512,470 $2,837,167

Total Including Soft Costs $3,539,855 $512,470 $4,052,325

Current

1513

1513

OptimumSRC 1600

Proposed