This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.
For additional information about this document and the document conversion process, please contact WRDS at [email protected] and include the phrase
“Digital Documents” in your subject heading.
To view other documents please visit the WRDS Library online at: http://library.wrds.uwyo.edu
Mailing Address: Water Resources Data System
University of Wyoming, Dept 3943 1000 E University Avenue
Laramie, WY 82071
Physical Address: Wyoming Hall, Room 249 University of Wyoming
Laramie, WY 82071
Phone: (307) 766-6651 Fax: (307) 766-3785
Funding for WRDS and the creation of this electronic document was provided by the Wyoming Water Development Commission
(http://wwdc.state.wy.us)
Executive Summary
Hanna Water System Level II Study
A Wyoming Water Development Commission Project
WWDC Project No. 05SC0295412
October 2014
PPMMPPCC Saratoga, Wyoming
7014.390/October 31, 2014 i Executive Summary
TABLE OF CONTENTS TASK 1 – SCOPING AND PROJECT MEETINGS .................................................... 1
TASK 2 – REVIEW OF EXISTING INFORMATION ................................................ 3
TASK 3 – POPULATION GROWTH AND WATER DEMAND PROJECTIONS .... 3
TASK 4 – INVENTORY AND EVALUATION OF THE EXISTING SYSTEM ....... 3
TASK 5 – HYDRAULIC MODEL AND GIS .............................................................. 4
TASK 5a – SWING TIE ATTRIBUTION .................................................................... 4
TASK 6 – EVALUATION OF SYSTEM OPERATIONS ........................................... 4
TASK 7 – CONCEPTUAL DESIGNS AND COST APPROXIMATIONS ................ 5
TASK 8 – ENVIRONMENTAL REPORT ................................................................... 7
TASK 9 – IDENTIFICATION OF CONSTRAINTS ................................................... 7
TASK 10 – INPUT FROM LOCAL OFFICIALS ........................................................ 7
TASK 11 – SCHEDULE OF ACTIVITIES .................................................................. 8
TASK 12 – LIFE CYCLE COST ANALYSIS AND FINAL COST ESTIMATES ..... 8
TASK 13 – WATER SYSTEM FINANCING .............................................................. 8
FUNDING SCENARIOS ............................................................................................................. 9
LIST OF TABLES
Table 1 – Town Priorities and Tentative Project Schedules .......................................... 6
Table 2 – Funding Summary ........................................................................................ 10
TABLE OF FIGURES
Figure 1 – Project Area Location Map .......................................................................... 2
7014.390/October 31, 2014 1 Executive Summary
INTRODUCTION
Hanna is located in Carbon County, approximately 40 miles northeast of the City of
Rawlins. The Town’s population peaked in the early 1980s at approximately 2300
residents and now stands at 840, as of the 2010 census. The Town’s water system
includes a water treatment plant built in 1980 along with a 20 million gallon open
reservoir filled with surface water, collected from Rattlesnake Creek. The Town
distribution system has a variety of water main sizes and pipe material, from steel and
iron pipe installed in the 1920s to Asbestos Cement (AC), ductile iron (DIP) and
Polyvinyl Chloride (PVC) installed in the early 1980s1
This report is a Wyoming Water Development Commission (WWDC) Level II Report
that builds on the Master Plan Level I Study prepared by AVI Professional Corporation
and submitted in September of 2012 (Master Plan). In this report, general
recommendations and projects from the Master Plan are developed into specific
projects with cost approximations and potential funding sources identified. The goal of
this Level II study is to build on the Level I Study by developing recommended projects
through prioritization, identification of funding sources, project constraints and
preliminary project planning. The Projects identified for this study are shown in Figure
1 – Project Area Location Map.
This Level II study also reviews water system operations and updates the Level I study
with the most recent available information. In addition this study updated the
Geographical Information System (GIS) with a valve shape file and swing tie attribute
table. The Master Plan water model has been updated with revised demands, pressures
and an extended time period simulation. Fire flows have also been modeled and
verified in five different areas of the Town.
TASK 1 – SCOPING AND PROJECT MEETINGS
Project meetings were held at several milestones during the project. An initial scoping
meeting was held in Hanna on August 13, 2013 to familiarize the Town Council and
staff with the project scope and schedule. A second project meeting was held on June
30, 2014 in Hanna. The second project meeting was a combined meeting to present
growth and demand projections and conceptual project designs.
Upon completion of the report, a public meeting will be held to present the findings of
the report. All pertinent data will be presented at the meeting and a memorandum
summarizing the views and comments presented at the meeting will be prepared.
1 AVI Professional Corporation, Hanna Master Plan Level I Study, Final Report, September 2012
9
87 6
54 3
2
1
292827
262524
23
22
21
20 19
18
16
1514
1312
11
10
17B
17A
2nd St.
Front St.
3rd St.
SH-72
Mineral Dr.5th St.
Jade Dr.
4th St.
1st St.
Clark
St.
Jeffe
rson S
t.
Beryl Dr.
East
St.
Heath
er Dr
.
Linda Dr.
Clark St. (South)
Alisha Dr.Leslie Way
Trona Ct.Lo
ve St
.
Hallie Way
Meadowlark Dr.
Colum
bia St
.
Tipperary St. (North) Love St. (South)
7th St.6th St.
Marble Ct.
Fossil Ct.
2nd St.
4th St.5th St.
4th St.
3rd St.
5th St.
Source: Esri, DigitalGlobe, GeoEye, i-cubed, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User Community
³
PMPC 118 E. Bridge PO Box 370Saratoga, WY 82331P: 307-326-8301F: 307-326-8301
FIGURE
CIVIL ENGINEERS
JOB NO.:
FILE NAME:
SCALE:
DRAWN BY:
CHECKED BY:
APPROVED BY:
DATE:
DATE:
DATE:
PROJECT AREA LOCATION MAPHANNA WATER SYSTEM LEVEL II STUDY
TOWN OF HANNA 1REV DATE BY
7014.390
HANNA MASTER PLAN.MXD
AS SHOWN
CK
KS
KS
6/27/2014
6/27/2014
6/27/2014
L:\Ar
cGIS\
7014
\390\H
anna
Mas
ter P
lan.m
xd
LEGEND WATER MAINS
2 INCH4 INCH6 INCH8 INCH10 INCH12 INCHPROPOSED MAIN
PROJECT LOCATION DESCRIPTION
1 4TH ST. (EAST)2 4TH ST. (WEST)3 FRONT ST. (EAST)4 FRONT ST. (WEST)5 OLD TOWN (SOUTH)6 OLD TOWN (EAST)7 OLD TOWN (WEST)8 OLD TOWN9 OLD TOWN
10 SOUTH JEFFERSON11 SOUTH WEST12 SOUTH 3RD ST.13 WEST RR CROSSING14 SOUTH15 SOUTH EAST16 EAST
17A STATE HIGHWAY WEST17B STATE HIGHWAY EAST18 TANK LOOP (SOUTH)19 TANK LOOP (NORTH)20 TANK LOOP (EAST)21 TANK LOOP (SOUTH)22 TANK LOOP (WEST)23 NORTH JEFFERSON24 WEST ELMO25 3RD ST. AND EAST ST.26 5TH ST. ALLEY27 3RD ST. ALLEY28 2ND ST. ALLEY29 1ST ST. ALLEY
0 0.25 0.5 0.75 10.125Miles
7014.390/October 31, 2014 3 Executive Summary
TASK 2 – REVIEW OF EXISTING INFORMATION
To achieve a historical perspective and understanding for the current water system,
PMPC gathered and reviewed available information related to the Town’s water supply,
transmission and distribution.
PMPC has extensive files and as-built plans for the Town’s water system that were
reviewed for information to produce the swing tie tables and conceptual design detail,
such as water main sizing; and material and miscellaneous information, such as steel
casing locations and underground conditions. The as-built information was used to
create the conceptual designs and improve the accuracy of the cost approximations.
Additional financial reports, water treatment plant record and staff interviews were
collected from Town personnel.
TASK 3 – POPULATION GROWTH AND WATER
DEMAND PROJECTIONS
The recommendations of the Master Plan are still pertinent to the current growth and
demand projections, as population growth has been flat to negative and local industrial
development is still in the feasibility and planning stages–. The Hanna water system
has supported approximately 2,100 people in the past so there could be a substantial
increase in current population without requiring additional system capacity. Based on
the available data; population growth will not adversely impact overall water demand in
the foreseeable future. With minor repairs and improvements the water system can
support additional population.
TASK 4 – INVENTORY AND EVALUATION OF
THE EXISTING SYSTEM
The Hanna water system has supported approximately 2,100 people in the past so there
could be a substantial increase in current population without requiring additional
system capacity. With the exception of the top five priority areas identified in Task 7,
the Hanna Water system infrastructure has no known issues requiring immediate repair
or replacement.
The raw water reservoir, WTP and existing one million gallon storage tank are
acceptable for the current and projected demand. There are no pump stations in the
system. The PRV station maintains pressure throughout the Town. There are no
identified bottlenecks in the supply or distribution system that prevents the Town from
supplying water to customers.
7014.390/October 31, 2014 4 Executive Summary
TASK 5 – HYDRAULIC MODEL AND GIS
The hydraulic model developed for the 2012 Master Plan was reviewed and updated
with the most recent year of water production records provided by the Town and
calibrated by hydrant flow testing. Extended period simulations and fire flow scenarios
were also developed to assess the water system’s ability to service the Town. In
addition, a proposed looping water main to Elmo was modeled for impacts to fire flow
and water system function. To verify and calibrate the model, flow testing was
performed on five fire hydrants in Hanna.
The GIS provided with the 2012 Master Plan was reviewed and updated with a valve
shape file and swing tie attributes. Valve locations, along with many other components
of the water system, were digitally mapped with the use of ArcGIS. A unique shapefile
was created for the water valves. The valve locations were approximated from the
information given on the swing tie attribute table. Street intersections, valve size, and
field measurements were all utilized for placing the valve as correctly as possible.
When locations were still in question, aerial imagery was used in an attempt to locate
the valve. All valves were placed on the map with best information available.
TASK 5A – SWING TIE ATTRIBUTION
A swing tie is a method of locating equipment based on horizontal measurements to
fixed landmarks such as fire hydrants and power poles. Swing tie measurements are
usually made during the final phases of a construction project. A swing tie table, for
the valves in Hanna, was created and linked to the GIS. Existing maps were cross-
referenced to determine the location and size of pipe for the existing valves. From the
information gathered from the maps, a swing tie table was constructed to identify all of
the existing valves. Once completed, a field analysis was conducted to verify that the
valves and the landmarks utilized for the swing tie information were still present.
TASK 6 – EVALUATION OF SYSTEM
OPERATIONS
The operation of the system has not significantly changed since the 2012 Master Plan.
The two notable improvements to the system are the installation of the Supervisory
Control And Data Acquisition (SCADA) system proposed in the Master Plan and
repairing the existing pressure reducing valve system.
7014.390/October 31, 2014 5 Executive Summary
The SCADA system was installed and is currently operational. At this time it is
primarily used for observing the functions of the water treatment plant, and only
controls the ferric chloride process. The Town is considering expansion of the SCADA
system to obtain additional system data and is reviewing recommendations for
programming improvements to optimize utilization of the system and the efficiency of
the plant.
TASK 7 – CONCEPTUAL DESIGNS AND COST
APPROXIMATIONS
Conceptual level designs and cost estimates have been developed for the project areas
identified by extensive review of existing information and record documents. Plan
view drawings and tabulated cost approximations are presented in Appendix B of the
Level II Study Final Report.
The plan view drawings are suitably scaled and of sufficient detail to identify important
project parameters such as: valves, fittings, water service connections, cross connection
control and surface restoration. The drawings have been developed from information in
past reports and as-built drawings.
The cost estimates are the engineer’s opinion of probable construction cost and are
made on the basis of experience and qualifications. Tabulated cost approximations
have been prepared from the developed project plans and include design, permitting,
land acquisition, construction engineering, construction, and construction
contingencies, along with material quantities such as length of pipe, number of fitting
and connections, and road surface. The cost approximations presented in Table 1 are
based on the year this study is completed with recommended inflation factors for the
proposed construction schedule for those sections to be completed in the future. The
table also identifies Commission-eligible and non-eligible project costs.
7014.390/October 31, 2014 6 Executive Summary
Project Area
Non-Eligible
Main
Classification
Date
InstalledGeneral Comments
Schedule for
Replacement
(Year)
Estimated
Cost
1 4TH STREET EAST Distribution 1971 Primarily distribution. Glued joint PVC W/Joint failure. 1 $285,550
2 4TH STREET WEST Distribution 1971 No taps, primary looping line. Glued joint PVC W/Joint failure. 1 $167,265
3 FRONT STREET EAST Distribution 1980Minimal taps, carries significant fire flow for areas on west end of Old Town.
Metallic fitting corrosion and failure. 2$315,979
4 FRONT STREET WEST Distribution 1980Minimal taps, carries significant fire flow for areas on west end of Old Town.
Metallic fitting corrosion and failure. 2$163,399
5 OLD TOWN SOUTH Distribution UK Primarily distribution in the oldest part of town. 3 $336,659
6 OLD TOWN EAST Distribution UK Primarily distribution in the oldest part of town. 4 $416,732
7 OLD TOWN WEST Distribution UK Primarily distribution in the oldest part of town. 5 $242,188
8 OLD TOWN DISTRIBUTION Distribution UK Primarily distribution in the oldest part of town. 6 $447,062
12 SOUTH 3RD STREET Distribution 1981 Minimal taps, carries significant fire flow for areas on west end of Old Town 10 $453,737
18 SOUTH TANK LOOP Distribution NA New water main, primary loop from storage tank to Old Town 16 $363,710
25 EAST AVENUE Distribution 1980 Elmo north end distribution line, several taps. 20 $221,306
26 FIFTH STREET ALLEY Distribution 1980 Elmo distribution line, several taps. 20 $197,943
27 THIRD STREET ALLEY Distribution 1980 Elmo distribution line, several taps.20
$257,279
28 FIRST STREET ALLEY Distribution 1980 Elmo distribution line, several taps. 20 $370,988
29 ROSEBUD AVENUE Distribution 1981 Elmo distribution line, several taps. $267,094
Project Area
WWDC Eligible
Main
Classification
Date
InstalledGeneral Comments
Schedule for
Replacement
(Year)
Estimated
Cost
9 OLD TOWN TRANSMISSION Transmission UK Main Transmission from WTP to Tank.7
$733,815
10 SOUTH JEFFERSON Transmission UK No taps, primary line from supply to north side of town and to fill storage tank 8 $159,091
11 SOUTH WEST Transmission 1978 No taps, primary line from supply to north side of town and to fill storage tank 9 $358,859
13 WEST RR CROSSING Transmission 1981 No taps, primary line from supply to north side of town and to fill storage tank 11 $99,727
14 SOUTH Transmission 1981 No taps, primary line from supply to town and to fill storage tank 12 $500,645
15 SOUTH EAST Transmission 1981 No taps, primary line from supply to town and to fill storage tank 13 $546,576
16 EAST Transmission 1978 No taps, primary line from supply to town and to fill storage tank 14 $269,444
17 STATE HIGHWAY Transmission 1980 Minimal taps, primary line from supply to Elmo 15 $818,334
19 NORTH TANK LOOP Transmission NA New water main, primary loop from storage tank to Elmo 17 $387,561
20 TANK LOOP EAST Transmission 1980 No taps, primary line from storage tank to Jones Addition and Elmo 18 $218,949
21 TANK Transmission 1980 No taps, primary line from storage tank to entire system 19 $95,721
22 TANK LOOP WEST Transmission 1980 Minimal taps, primary line from storage tank to west and south sides of town 20 $436,741
23 NORTH JEFFERSON Transmission 1977 Primary line from supply to north side of town and to fill storage tank 20 $403,259
24 WEST ELMO Transmission 1980 Elmo west end transmission line, no taps. 20 $314,039
Table 1 – Town Priorities and Tentative Project Schedules
7014.390/October 31, 2014 7 Executive Summary
TASK 8 – ENVIRONMENTAL REPORT
For the Master Plan, an environmental report (ER) was produced by Western
EcoSystems Technology, Inc. for portions of the Town that were identified as needing
infrastructure improvements2.
The current list of priority areas to be investigated as identified in the Scope of Services
encompasses a larger area than what has been studied in the Master Plan ER. The
additional areas include Elmo, the Jones Addition and all areas south of the UPRR
tracks. To investigate these additional areas, applicable State and Federal Agencies
were contacted and requested to provide any concerns or additional investigation
requirements for the proposed project areas.
Based on the responses received, the only item that may result in additional
investigation is if any of the project areas are determined to be in a wetland. If
wetlands will be impacted a permit may be required from the USACE.
TASK 9 – IDENTIFICATION OF CONSTRAINTS
In the Town of Hanna, project constraints range from environmental and access
constraints, to regulatory and compliance constraints. A spreadsheet of project
constraints has been identified in Task 9 of the Final Report with details on qualifying
funding and specific project constraints.
TASK 10 – INPUT FROM LOCAL OFFICIALS
The second project meeting was a combined meeting to present growth and demand
projections, and conceptual project designs. The meeting was held on June 30, 2014 in
Hanna. The Town council, Mayor and operation’s staff were on hand to provide input
on project progress and specific conceptual design concerns. The items presented and
discussed included a review and update of the 2012 Master Plan, identifying and
prioritizing project areas, and discussion of funding scenarios and schedules for projects
based upon priorities.
It was noted that most areas of the Town would be impacted at some point by the
proposed infrastructure replacement projects. The Town acknowledged that the
projects would be locally disruptive while in progress.
2 Western EcoSystems Technology, Inc., City of Hanna Waterline Replacement Environmental Review,
November , 2012
7014.390/October 31, 2014 8 Executive Summary
TASK 11 – SCHEDULE OF ACTIVITIES
Project schedule is based on specific project milestones. The main project milestones
for water main projects are: funding application deadlines, design, bidding and finally
construction. Table 5 in Task 11 of the Final Report presents the schedule of the
twenty-nine projects divided into WWDC Eligible and Non-WWDC Eligible projects.
The Town’s top priorities are scheduled in next ten years, with the remaining projects
anticipated to occur twenty years or more in the future.
TASK 12 – LIFE CYCLE COST ANALYSIS AND
FINAL COST ESTIMATES
Life cycle cost is an essential approach to decide on alternative rehabilitation strategies
for infrastructure systems. There are twenty nine conceptual projects proposed in Task
7. Of the twenty nine projects twelve have been identified as very old or failing
infrastructure requiring immediate replacement and seventeen are projects that are
expected to last longer than the twenty year project planning horizon. The
recommended projects are all traditional replacement projects with the exception of the
North and South Tank Loops. The replacement pipe material recommended is PVC;
both for its long term durability and the Town’s familiarity with working with PVC.
The life cycle estimated project total costs are presented in Table 7 in Task 12 of the
Final Report. The itemized estimated project costs developed in Task 7 and presented
in Appendix B of this report were used for the design and construction costs. To assess
the future costs of the projects, an inflation rate of 3% was added to each project based
on the anticipated schedule developed in Task 11. To accommodate the operation and
maintenance costs a $0.25 per foot cost was assessed to each project area over a twenty
year period. Finally, to give the true cost of a project funded in the future with loaned
money, a 2.5% interest rate was applied for a twenty year period. The lifetime costs for
projects planned in twenty years are drastically more than the current year project cost,
however it is important to remember that the final costs will not be realized until 20
years after the project is completed, or 40 years from the date of this report.
TASK 13 – WATER SYSTEM FINANCING
The Hanna water system operates as a Water Enterprise Fund. This section reviews the
enterprise fund operation to determine current and anticipated future water system
revenues and expenses. The statutory requirement of every water enterprise fund is to
be financially self-supporting.
7014.390/October 31, 2014 9 Executive Summary
Based on the requirements given in the scope of work and a review of the 2013-2014
budget, Hanna’s water system is not self-supporting. While the expenses are met, an
increase in the base rate of $5.30 would be required for the water fund to provide an
emergency fund equal to 2.5% of the annual operating costs. A base rate increase is
recommended rather than an incremental tiered rate increase, as previous tiered rate
increases resulted in a net reduction of the consumption revenues.
FUNDING SCENARIOS To assess the costs of the projects, several funding scenarios have been investigated.
These scenarios vary from a direct funding by user rates to the use of different loan and
grant programs. The funding scenarios and impact to monthly rates are summarized
Table 2. The six scenarios investigated are described as follows:
1. Scenario one anticipates that only user fees will be utilized to fund the projects
without state, federal or outside funding assistance.
2. Scenario two assumes there will be some combination of WWDC and SLIB
loans and WWDC grants to fund the projects.
3. Scenario three shows the impact to user rates if RUS loans were utilized for the
entire projects costs for all projects.
4. Scenario four shows the impact to user rates if SLIB loans were utilized for the
entire projects costs for all projects.
5. Scenario five shows the impact to user rates if RUS grants for 30% of the project
costs and loans for 70% of the project costs were utilized for the entire projects
costs for all projects.
6. Scenario six shows the impact to user rates if SLIB loans were utilized for the
entire projects costs for all projects. This assumes that Hanna would continue to
qualify for 75% principal forgiveness, and that program funding would continue
for the entire planning horizon.
Various combinations of financing options may require varying amounts of Town
matching funds. This match obligation may require individual user rates to increase.
Any additional funding that can be leveraged as matching funds such as the 1% specific
purpose tax, will reduce the required rate increase amount accordingly. Further rate
adjustments may be required to pay for projects more than 20 years in the future.
To complete the priority projects, the required base rate would vary from $49 to $145
per month. As a comparison, 2.5% of Hanna’s Annual Median Household Income is
approximately $68 per month.
7014.390/October 31, 2014 10 Executive Summary
Table 2 – Funding Summary
Funding Source Interest
Rate
Approx
Mo Rate
Increase
Current
Base
Rate
Total
Monthly
Rate
No Outside Funding Assistance NA
Non-WWDC Projects $110
WWDC Projects $432 $35 $577
67% WWDC Grant W/WWDC and SLIB Loan
Non-WWDC Projects 2.50% $34
WWDC Projects 4.0% $8 $35 $77
100% RUS Loan
Non-WWDC Projects 3.25% $46
WWDC Projects 3.25% $23 $35 $104
100% SRF Loans
Non-WWDC Projects 2.50% $35
WWDC Projects 2.50% $21 $35 $91
30% RUS Grant and 70% RUS Loan
Non-WWDC Projects 3.25% $26
WWDC Projects 3.25% $15 $35 $76
SLIB Loan W/75% Principal Forgiveness
Non-WWDC Projects 2.50% $9
WWDC Projects 2.50% $5 $35 $49