Thirty Meter Telescope (TMT) Project Status

Tomo Usuda (TMT-Japan Director)

CONFIDENTIAL

2

http://tmt.nao.ac.jp/gallery/index.htmlTMT movie (140sec)

3

Subaru’s Synergy with TMT

• Direct imaging of exoplanets and exploration of life outside of the solar system

• Uncover the first born star/galaxy• Understand dark matter and dark energy

Subaru Telescope(8.2m)

Discovery of numerous galaxies approximately 13 billion light-years away

Successful direct imaging of exoplanets

Science goals of TMT

TMT will attempt to solve the mysteries of universe uncovered by Subaru Telescope

Exploration of the accelerating universe based on wide field galaxy survey using HSC/PFS

TMT (30m)

4

Brief History of TMT2007 Feb: GOPIRA’s (Japan’s O/IR Astronomy community) endorsement2009 July: Maunakea (MK), Hawaii selected as site2013 April: Conservation District Use Permit (CDUP) completed all court review successfully2013 July: Scientific Authorities Sign the TMT Master Agreement2014 May 6: TMT International Observatory (TIO) was formed as the legal entity (Caltech, UC, China, and Japan)2014 May: Governing Board of TIO voted to start the Construction Phase2014 July: Final Approval for sublease of the construction site at MK2014 Oct 7: Ground Breaking Ceremony2014 Dec 2: India becomes a full member at 10% level2015 Mar-Apr: Major construction was started but suspended2015 Apr 21: Canada becomes a full member with $243.5M (CAD)2015 Dec 2: Hawaii Supreme Court invalidated the CDUP issued by BLNR to the UH to build TMT at MK

5

Status of the CDUPReapproval for TMT

Dec 2 2015: The Supreme Court of Hawaii decision on CDUP issued.Feb 2016: The Third Circuit Court further remands the permit application to the Board of Land and Natural Resources (BLNR) in Hawaii, and as a result, the contested case hearing process is reopened by BLNR.May 2016: Hearing Officer to preside over the BLNR hearing is selected and actual preparations for the hearing is initiated.Prehearing conferences (May 16, June 17, Aug 5, 12, & 29) & Oct. 3Sep 26 2016: Site Visit

6

Status of the CDUPReapproval for TMT

Dec 2 2015: The Supreme Court of Hawaii decision on CDUP issued.Feb 2016: The Third Circuit Court further remands the permit application to the Board of Land and Natural Resources (BLNR) in Hawaii, and as a result, the contested case hearing process is reopened by BLNR.May 2016: Hearing Officer to preside over the BLNR hearing is selected and actual preparations for the hearing is initiated.Prehearing conferences (May 16, June 17, Aug 5, 12, & 29) & Oct. 3Sep 26 2016: Site VisitOct 11 2016: First Evidentiary Hearing @HiloJan 2017: Decision by Hearing Officer (Ms. Riki M. Amano)Apr 2017: Decision by BLNROnsite construction expected to resume in 6 months following CDUP approval. Expected resume date is April 2018 (cf. Another 6 month margin is available in case of delay)

7

Hawaiiʼs Public Opinion: We Continue to Support TMT

12/28/2015 – 1/9/2016 (post-HSC decision)Honolulu Star-Advertiser public opinion pollPerformed by Ward Research Inc., *619 polled“Do you support or oppose moving ahead with the construction of the TMT on Mauna Kea?”

Yes 67%No 27%

(The poll is 39% Yes and 59% No when the result is limited to native Hawaiians)

5/15/2016 (prior to the pre-hearing)Honolulu Star-Advertiser readers poll*1341 polled“What do you think about the restartof the TMT permitting process?”

Positive 88%(1182)Negative 8%( 107)

*Approximately 4% margin of error

New Hawaiʼi IslandMayor: Mr. Harry Kimstated to support TMT

(Aug. 18)

8

Hawaiiʼs Public Opinion: We Continue to Support TMT

Local shows of support for TMT. Voice in support of TMT construction is becoming more visible.

9

PUEO (Perpetuating Unique Educational Opportunities)

Hawai’i Governor Ige listens native Hawaiians

PUEO presidentKeahi Warfield

@Subaru HQ

10

TMT Backup PlanSite Other than Hawaii

Construction in Hawaii is still the first choice, but a course of action must be considered in case construction in Hawaii is deemed not possible. Each partner country is in the process of compiling opinions on this issue.

Schedule proposed by TMT International Observatory:Oct 26~27, 2016 Board meeting: Narrow down alternate sites (cf. La Palma @Spain, SPM @Mexico, MacKenna & Honar @Chile) for the backup plan

The conditions and timing for the decision on whether or not to construct in Hawaii (switch to BackupPlan) is under discussion

ß For Japan, Hawaii is very essential, it is not easy to change the plan.TMT-J SAC holds several meetings to understand the current status of TMT project and to make decision on the direction regarding the following to prepare for the possibility of construction not taking place in Hawaii (Aug 2 Kyoto, Sep 1 Sendai, Sep 6 Hilo, Sep 9 Tokyo, Sep 12 Hiroshima).Discussions continue at TMT SAC meetings (last one on Sep 26th)

11

Members’ contributions

EnclosureTelescopeM1 blank

M1 polish

M2

M3

AO

FacilityControl Systems& Software

Instruments30% 40%

15%15%

12

1)International StatusChina

(1) M1 Polishing (15%)Subscale (1.1m) test was successfully done. Design of M1 SMP system was done. Mass production will be started in 2018.

(2) M3 system (100%)1/4 scale Prototype and testing

(3) LGS (Laser Guide Star)Prototype and test, Preparation for mass production (6 for 1st light & 3)

(4) Early Light Science InstrumentsIRIS: Optical dispersion componentsWFOS: Conceptual design works for several subsystems

M1 SMP system

M3 (1/4 scale) prototype

LGS prototype

13

1)International StatusIndia

(1) M1 Polishing (15%)Licensing technology with Coherent (Tinsley) in US. Mass production will be started in 2018 in India

(2) M1 SSA (Segment Mirror Support Assembly: 100%)Prototype and test, Preparation for mass production

(3) M1 Actuators, Edge sensors, etc.Prototype and test, Preparation for mass production

(4) Control Software for early light science instrumentsConceptual design works for WFOS

13M1 SSA prototype

M1 Edge sensors

M1 Actuators

14

1)International StatusCanada

OIWFS

NFIRAOS

IRMS

IRIS

Enclosure

(1) Enclosure (100%)Final Design: donePreparation of fabrication has been started in FY2015

(2) NFIRAOS (100%)Final Design Phase (FDR is scheduled in 2017 February)

(3) IRIS:On the Instrument Low-order Wavefront Sensor (OIWFS)Preliminary Design Phase (PDR is scheduled in 2016 Nov)Final Design will be started in 2017

15

1)International StatusUSA

(1) M1 Polishing (40%), IBF & Final check (100%)Prototype and test at Coherent (Tinsley) & Harris (ITT). Preparation for mass production which will be started in 2018.

(2) M1CS (Control System: 100%)Design, Prototype and test are on going. Mass production in India.

(3) Early Light Science InstrumentsIRIS: IFU mode. Preliminary Design phaseIRMS: Clone of MOSFIRE developed by UCLA/CaltechWFOS:System design and Optics design. PI/PM recruiting now.

M1 PrototypeM1 2D ProfilometerSeismic test of

M1 control system

16

2)Japan’s ContributionsTelescope

M1 blank

M1 polish Instruments30%

1) Design fabrication / installation of the telescope structure, 2) Providing all the primary mirror segment blanks, 3) Polishing 30% of the primary mirror blanks, 4) Developing part of the First Generation Instruments, and 5) Cash contributions to cover common expenses etc.

17

2)TMT-J activities:M1 Blank & Polishing

Process of works FY2013 FY2014 FY2015 FY2016 totalM1 Blank (plano-plano) 60(29) 35(0) 74(31) 40(21) 209(81)Spherical Grinding 12(0) 19(0) 63(29) 60(52) 154(81)Aspherical Grinding 12 16 33 8 69Aspherical Polishing 6 16 22Hex Cutting 0 0 0

107 Blanks produced (2015 Oct)50th Blank backside Polished

Numbers() for partners

18

2)TMT-J activities:Telescope Structure (STR)

2013 Nov 12~14: PDR2014 Apr 15~16: PDR for STR control system2014 Nov 18~21: PDR for M1 Segment Handling System 2015 Feb 17~20: FDR-P1 for STR mechanical system2015 Jul 27~29: FDRP2 for STR control system

“FDR design of telescope software and control system is progressing well in many areas, but has not yet reached FDR level” à “A delta review will be required”

2015 Oct 8~9: Long-lead Procurement Review (LPR) for EL-Journal, Lower-tube, Az Pintle bearing2016 Feb 24~25: delta-FDRP2 for STR control system2016 Dec 7~9: FDRP3 for SHS etc.FY2017~2018: FDRC & Production Readiness Reviews

19

2)Telescope StructureSegment Handling System

CONFIDENTIAL

20

2)Telescope StructureSegment Handling System

Prototype of Segment Lifting Fixture

21

2)TMT-J activities:Early light Sci. instruments

IRIS (near-IR Imager and Spectrometer):l=0.8~2.4 µm, FOV=34”x34”, R=4000~8000Preliminary Design Phase started since April 2013 and scheduled for completion in December 2016

WFOS (Wide-field Optical spectrometer)l=0.31~1.1 µm, FOV=40.3’ squared, R=1000~8000Conceptual Design Handover Workshop held in Oct 13, 2013A short “mini-study” design review was held in April 2015 @NAOC (China)

22

2)TMT-J activities:4th Science Forum

Kyoto, Japan, 24-26 May 2016First TMT Forum in AsiaA great success! Total 136 participants (Japan 52)https://conference.ipac.caltech.edu/tmtsf2016/

23

2)TMT-J activities:Public Outreach

Fukuoka

Tokyo

Kagawa

HyogoIbaraki

Osaka

Kanagawa

ChibaKyoto

Aichi

Miyagi

Ehime

Radio

SaitamaNagano

45 lectures in science museums, schools etc.43 @14 Prefectures, 2 Radio lectures

24

SummaryBoth TIO and TMT-J appreciate Hawaii for astronomy at MaunakeaCDUP re-approval process is on going. The first light is delayed to 2027 from 2024We are working to overcome the current severe situationCommunity supports are important for TMT and Maunakea observatories