The 5 th Interna+onal Indonesia Gas Infrastucture Conference and Exhibi+on (Indopipe 2014) YOGYAKARTA

Upload: lenhan

Post on 03-Feb-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The5 thInternaonalIndonesiaGas Infrastucture ...indonesiangassociety.com/wp-content/uploads/2016/06/TS-3-Triono.pdf · " P.$ Brandan$– Stabat$44.6$km$(ROW$exis+ng)$ ... PIPELINE

The  5th  Interna+onal  Indonesia  Gas  Infrastucture  Conference  and  Exhibi+on  

(Indopipe  2014)    

YOGYAKARTA      

Page 2: The5 thInternaonalIndonesiaGas Infrastucture ...indonesiangassociety.com/wp-content/uploads/2016/06/TS-3-Triono.pdf · " P.$ Brandan$– Stabat$44.6$km$(ROW$exis+ng)$ ... PIPELINE

CHOPPER : Customer Satisfaction, HSE Concern, Operation Excellent, Profit, Personal Improvement

PT PERTAMINA GAS

PT Pertamina Gas is an Indonesian gas company engaged in the upstream and downstream sectors (middle stream). The company responsible for commercial trading gas, gas transportation, gas processing and other business related to natural gas and itself derivatives. !PT Pertamina Gas is Establish by commodities increased need for domestic gas as an alternative energy to substitute oil fuel as well that would be give an additional value for business of PT Pertamina(Persero). !

The experience of PT Pertamina during 30th years in managing the gas business is expected to be a focus for the provision and professional in managing and developing business networks and resources of gas in the country.!

Page 3: The5 thInternaonalIndonesiaGas Infrastucture ...indonesiangassociety.com/wp-content/uploads/2016/06/TS-3-Triono.pdf · " P.$ Brandan$– Stabat$44.6$km$(ROW$exis+ng)$ ... PIPELINE

CHOPPER : Customer Satisfaction, HSE Concern, Operation Excellent, Profit, Personal Improvement

THE BUSINESS SECTOR OF PT PERTAMINA GAS

GAS  PROCESSING   Concern  to  develope  /  build    gas  processing  facili+es    

•  Make   a   rela+ons   with   company   that   concern   with   infrastructure   of  distribu+on.    

•  Build  an  IPP  and  make  a  rela+ons  with  another  company  especially                        PT  PLN.    •  Build  an  LNG  receiving  system  as  a  supported  for  consumer  that  should  

be  away  from  gas  resources.  

• GAS  DISTRIBUTION  • INDEPENDENT  POWER  PRODUCER  • LNG  RECEIVING    TERMINAL  

       GAS  TRADING    

•  Concern   to   do   gas   commercial/trading   by   producer   and  consumers  

•  Concern   to   do   deriva+ves   gas   commercial/trading     [Mix   LPG  &  Condensates.    

       GAS  TRANSPORTATION   Concern  to  build  pipeline  network    for    gas  transporta+on    

Page 4: The5 thInternaonalIndonesiaGas Infrastucture ...indonesiangassociety.com/wp-content/uploads/2016/06/TS-3-Triono.pdf · " P.$ Brandan$– Stabat$44.6$km$(ROW$exis+ng)$ ... PIPELINE

CHOPPER : Customer Satisfaction, HSE Concern, Operation Excellent, Profit, Personal Improvement

   

 

PT PERTAMINA GAS PROJECTS

NO   PT  PERTAMINA  GAS  PROJECTS  

1   Gas  Transmission  Pipeline  from  Arun    to  Belawan  Project  

2   Gas  Pipeline  from  Belawan  to  KIM    and  KEK  Project  

3   Gas  Pipeline  from  Muara  Karang    to  Muara  Tawar  Project  

4   Gas  Pipeline  from  Porong    to    Gra+  Project  

Page 5: The5 thInternaonalIndonesiaGas Infrastucture ...indonesiangassociety.com/wp-content/uploads/2016/06/TS-3-Triono.pdf · " P.$ Brandan$– Stabat$44.6$km$(ROW$exis+ng)$ ... PIPELINE

Gas  Transmission  Pipeline  from  Arun  to  Belawan  Project  

Page 6: The5 thInternaonalIndonesiaGas Infrastucture ...indonesiangassociety.com/wp-content/uploads/2016/06/TS-3-Triono.pdf · " P.$ Brandan$– Stabat$44.6$km$(ROW$exis+ng)$ ... PIPELINE

CHOPPER : Customer Satisfaction, HSE Concern, Operation Excellent, Profit, Personal Improvement

Government instruction by Ministry letter No. S-141/MBU/2012

Gas Transmission Pipeline from Arun to Belawan Project

Page 7: The5 thInternaonalIndonesiaGas Infrastucture ...indonesiangassociety.com/wp-content/uploads/2016/06/TS-3-Triono.pdf · " P.$ Brandan$– Stabat$44.6$km$(ROW$exis+ng)$ ... PIPELINE

Pipeline  Length   -­‐  Arun    –  SLS  A  70    km  -­‐  SLS  A  –  P.  Batu  202  km  -­‐  P.  Batu  –  P.  Brandan  6.5  km  (ROW  exis+ng)  -­‐  P.  Brandan  –  Stabat  44.6  km  (ROW  exis+ng)  -­‐  Stabat  –  Belawan  28  km    

Linepipe  Specifica+on     24”  OD,  API  5L  X52,  0,5  inch  WT,  3LPE  outer  2  mm  

Flow  Capacity   200  MMSCFD  

Compression  System   Two    Compressor  Gas  Sta+ons  (  SKG  Rantau  Panjang,  SKG  Pangkalan  Brandan)  

First  &  Last  Point   Arun  (Point  B)    –  Belawan    

Opera+ng  Pressure     780  psig  

Design  Pressure   860  psig  

Construc+on  Period   18      Month  

Gas  Resource    Arun  Regasifica+on  Unit  

Status     Open  Access  

Toll  Fee   Subject  to  BPH  Migas  approval  

PROJECT DESCRIPTION Gas Transmission Pipeline from Arun to Belawan Project

Page 8: The5 thInternaonalIndonesiaGas Infrastucture ...indonesiangassociety.com/wp-content/uploads/2016/06/TS-3-Triono.pdf · " P.$ Brandan$– Stabat$44.6$km$(ROW$exis+ng)$ ... PIPELINE

SCHEDULE  

PROJECT  TIME  SCHEDULE  

Gas Transmission Pipeline from Arun to Belawan Project

Page 9: The5 thInternaonalIndonesiaGas Infrastucture ...indonesiangassociety.com/wp-content/uploads/2016/06/TS-3-Triono.pdf · " P.$ Brandan$– Stabat$44.6$km$(ROW$exis+ng)$ ... PIPELINE

PIPELINE ROUTE

HDD Wampu River

HDD Batang Sarangan River

HDD Babalan River

HDD Tamiang River

SKG P. Berandan

SKG R. Panjang

Metering St. Arun

Metering St. PLN Belawan

Gas Transmission Pipeline from Arun to Belawan Project

Page 10: The5 thInternaonalIndonesiaGas Infrastucture ...indonesiangassociety.com/wp-content/uploads/2016/06/TS-3-Triono.pdf · " P.$ Brandan$– Stabat$44.6$km$(ROW$exis+ng)$ ... PIPELINE

CHOPPER : Customer Satisfaction, HSE Concern, Operation Excellent, Profit, Personal Improvement

PIPELINE ROUTE of Nangroe Aceh Darussalam Province

WILAYAH KECAMATAN PANJANG (km)

LUAS (Ha) AREA/PEMILIK

ACEH UTARA

       

  35,0 49,0 PT Arun/DJKN

  38,0 53,2 Exxon Mobil

ACEH TIMUR

Indra Makmu 18,0 25,2 PT.Medco

Pantee Bidari      

Pantee Bidari 29,8 41,7 Ex.Asamera

Ranto Peureulak 6,2 8,7 Masyarakat

Ranto Peureulak 4,4 6,1 PTPN-I

Peureulak 3,2 4,5 Masyarakat

Peureulak Timur 6,1 8,6 PT.Wahyu Rizki

Peureulak Timur 7,7 10,7 PT.Minamas

Sungai Raya 4,6 6,5 PT.Patria Kamau

Bireun Bayeun 3,1 4,3 PT.Damar Siput

Bireun Bayeun 11,1 15,5 PTPN-I

Bireun Bayeun 1,8 5,9 PT.ARCO

Bireun Bayeun 0,3 14,5 Masyarakat

LANGSA Langsa Baro 4,2 2,5 PT.Timbang Langsa

Langsa Baro 10,4 0,4 PTPN-I

ACEH TAMIANG

Manyak Payeud 0,9 1,3 PT.ARCO

Karang Baru 6,0 8,3 Masyarakat

Karang Baru 1,5 2,1 PTPN-I

Karang Baru 6,5 9,1 Masyarakat

Karang Baru 2,1 2,9 PTPN-I

Karang Baru 34,2 47,9 PEP Rantau

TOTAL 235,0 329,0  

Gas Transmission Pipeline from Arun to Belawan Project

Page 11: The5 thInternaonalIndonesiaGas Infrastucture ...indonesiangassociety.com/wp-content/uploads/2016/06/TS-3-Triono.pdf · " P.$ Brandan$– Stabat$44.6$km$(ROW$exis+ng)$ ... PIPELINE

CHOPPER : Customer Satisfaction, HSE Concern, Operation Excellent, Profit, Personal Improvement

PIPELINE ROUTE of Sumatera Utara Province Gas Transmission Pipeline from Arun to Belawan Project

Page 12: The5 thInternaonalIndonesiaGas Infrastucture ...indonesiangassociety.com/wp-content/uploads/2016/06/TS-3-Triono.pdf · " P.$ Brandan$– Stabat$44.6$km$(ROW$exis+ng)$ ... PIPELINE

EPC PACKAGE

Package V. SCADA q  METERING STATION q  SCADA q  GMS & PMS

GA

S PI

PELI

NE

TRA

NSM

ISSI

ON

FR

OM

AR

UN

– B

ELAW

AN

Package I. EPC Gas Compressor Station

q  SKG Rantau Panjang q  SKG P. Berandan

CONSTRUCTION STATUS q  Cut & Fill : Completed q  Building, Warehouse Water

pond : on-progres Package II. EPC Pipeline

q  Pipa Size : 24” OD x 0.5” WT x 334 KM

q  Design Life : 20 THN

CONSTRUCTION STATUS q  Welding Completion : 316 KM q  River & Road Crossing

Completion : 104

Package III. LINEPIPE PURCHASING q  3LPE Pipe : 23.084 jts q  CWC Pipe : 1.500 jts

Package IV. EPC Compressor Unit q  3 Unit GTC + Acces+ Piping on skid-

SKG R. Panjang q  2 Unit GTC + Acces + Piping on skid-

SKG P. Brandan

STATUS GTC q  FAT GTC : April 2014 q  GTC On Site : July 2014

CONSTRUCTION STATUS q  FO Installation : 228 KM q  Metering Fabrication : In-Progress

DELIVERY STATUS q  Completed : 24.584 jts

Package III. LINEPIPE PURCHASING (Add)

q  3LPE Pipe : 5.000 jts

DELIVERY STATUS q  Completed : 5.000 jts

Gas Transmission Pipeline from Arun to Belawan Project

Page 13: The5 thInternaonalIndonesiaGas Infrastucture ...indonesiangassociety.com/wp-content/uploads/2016/06/TS-3-Triono.pdf · " P.$ Brandan$– Stabat$44.6$km$(ROW$exis+ng)$ ... PIPELINE

HDD Wampu River

HDD Batang Sarangan River

HDD Babalan River

HDD Tamiang River

SKG P. Berandan

SKG R. Panjang Metering St. Arun

Metering St. PLN Belawan

PPIPELINE    PROGRESS  PER  3.06.14  

Welding   :  316    KM  (Target  334  KM)  

Backfill   :  301  KM  (Target  334  KM)  

Road  Cross   :  79  (Target  96)  

River  Cross  (HDD)   :  3  (Target  4)  

River  Cross  (Non  HDD)   :  6  (Target  12)  

PIPELINE PROGRESS

ROW weldiing backfill

Gas Transmission Pipeline from Arun to Belawan Project

Page 14: The5 thInternaonalIndonesiaGas Infrastucture ...indonesiangassociety.com/wp-content/uploads/2016/06/TS-3-Triono.pdf · " P.$ Brandan$– Stabat$44.6$km$(ROW$exis+ng)$ ... PIPELINE

PROGRESS S-CURVE (OVERALL)

Per June 3rd 2014

Plan Progress per June 3rd , 2014, : 83,2460% Actual Progress per June 3rd , 2014, : 83,0424% Deviation per June 3rd t , 2014, : -0,2035% (behind)

Gas Transmission Pipeline from Arun to Belawan Project

Page 15: The5 thInternaonalIndonesiaGas Infrastucture ...indonesiangassociety.com/wp-content/uploads/2016/06/TS-3-Triono.pdf · " P.$ Brandan$– Stabat$44.6$km$(ROW$exis+ng)$ ... PIPELINE

LONG LEAD ITEM MATERIALS  

Long  Lead  Items   PO  (purchase  Order)  

FAT  (Factory  acceptance  Test)  

MoS  (Material  on  ite)  

SAT  (Site  Acceptance  Test)  

Shutdown  &  Blowdown  Valve  

18  Dec  2013   16  June  2014   16  July  2014   31  July  2014  

LBCV  Package   25  Oct  2013   5  May  2014   27  June  2014   11  July  2014  

Pig  Launcher/Receiver   25  Nov  2013   2  June  2014   27  June  2014   4  July  2014  

Turbine  Compressor   1  Aug  2013  31  March  –  21  April  2014  

4  June  2014   27  July  2014  

Metering  Skid   23  Oct  2013   25  April  2014   20  July  2014   10  Aug2014  

Gas Transmission Pipeline from Arun to Belawan Project

Page 16: The5 thInternaonalIndonesiaGas Infrastucture ...indonesiangassociety.com/wp-content/uploads/2016/06/TS-3-Triono.pdf · " P.$ Brandan$– Stabat$44.6$km$(ROW$exis+ng)$ ... PIPELINE

THANK YOU