THE WORLD BANK ENERGY THE WORLD BANK ENERGY WEEK 2006 WEEK 2006 (6 – 8 MARCH, 2006) (6 – 8 MARCH, 2006) CHALLENGES FACED IN INCREASING CHALLENGES FACED IN INCREASING MODERN ENERGY ACCESS: THE MODERN ENERGY ACCESS: THE CASE OF UGANDA. CASE OF UGANDA. KEY NOTE ADDRESS BY: KEY NOTE ADDRESS BY: HON. SYDA N. M. BBUMBA HON. SYDA N. M. BBUMBA MINISTER OF ENERGY AND MINERAL DEVELOPMENT, MINISTER OF ENERGY AND MINERAL DEVELOPMENT, GOVERNMENT OF THE REPUBLIC OF UGANDA GOVERNMENT OF THE REPUBLIC OF UGANDA 6TH MARCH, 2006. 6TH MARCH, 2006. THE WORLD BANK THE WORLD BANK WASHINGTON D.C. WASHINGTON D.C.

Upload: charla-carroll

Post on 24-Dec-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: THE WORLD BANK ENERGY WEEK 2006 (6 – 8 MARCH, 2006) CHALLENGES FACED IN INCREASING MODERN ENERGY ACCESS: THE CASE OF UGANDA. KEY NOTE ADDRESS BY: HON

THE WORLD BANK THE WORLD BANK ENERGY WEEK 2006 ENERGY WEEK 2006 (6 – 8 (6 – 8

MARCH, 2006)MARCH, 2006)

CHALLENGES FACED IN CHALLENGES FACED IN INCREASING MODERN ENERGY INCREASING MODERN ENERGY

ACCESS: THE CASE OF ACCESS: THE CASE OF UGANDA.UGANDA.

KEY NOTE ADDRESS BY:KEY NOTE ADDRESS BY:

HON. SYDA N. M. BBUMBAHON. SYDA N. M. BBUMBAMINISTER OF ENERGY AND MINERAL DEVELOPMENT, MINISTER OF ENERGY AND MINERAL DEVELOPMENT,

GOVERNMENT OF THE REPUBLIC OF UGANDAGOVERNMENT OF THE REPUBLIC OF UGANDA6TH MARCH, 2006.6TH MARCH, 2006.THE WORLD BANKTHE WORLD BANKWASHINGTON D.C.WASHINGTON D.C.

Page 2: THE WORLD BANK ENERGY WEEK 2006 (6 – 8 MARCH, 2006) CHALLENGES FACED IN INCREASING MODERN ENERGY ACCESS: THE CASE OF UGANDA. KEY NOTE ADDRESS BY: HON

BACKGROUNDBACKGROUND Greatly honoured to have been invited to give a key Greatly honoured to have been invited to give a key

note address note address An opportune moment to share Uganda’s experiencesAn opportune moment to share Uganda’s experiences Uganda has spearheaded energy sector reforms in Uganda has spearheaded energy sector reforms in

Sub-Saharan AfricaSub-Saharan Africa Aim was to create a financially viable and efficient Aim was to create a financially viable and efficient

power sector that could accelerate electricity accesspower sector that could accelerate electricity access Uganda is also implementing a large rural Uganda is also implementing a large rural

electrification electrification project with World Bank support project with World Bank support National electricity access is 9%, but rural access is National electricity access is 9%, but rural access is

only 3%only 3% Market-led reforms involved the enactment of a new Market-led reforms involved the enactment of a new

Electricity Act in 1999, restructuring of the vertically Electricity Act in 1999, restructuring of the vertically integrated electricity utility company and the integrated electricity utility company and the privatisation of business in generation and distribution.privatisation of business in generation and distribution.

Government’s role now virtually restricted to that of Government’s role now virtually restricted to that of creating an enabling environment, which includes creating an enabling environment, which includes policy, regulation and general oversight.policy, regulation and general oversight.

Page 3: THE WORLD BANK ENERGY WEEK 2006 (6 – 8 MARCH, 2006) CHALLENGES FACED IN INCREASING MODERN ENERGY ACCESS: THE CASE OF UGANDA. KEY NOTE ADDRESS BY: HON

BACKGROUND cont’dBACKGROUND cont’d We are still grappling with more questions than We are still grappling with more questions than

answers with regard to this route we have chosen to answers with regard to this route we have chosen to taketake..

Have the reforms created any impact?Have the reforms created any impact? Has there been improved service delivery?Has there been improved service delivery? Why have we not been able to increase investments Why have we not been able to increase investments

to increase generation capacity to enable us meet to increase generation capacity to enable us meet demand and confidently expand access? demand and confidently expand access?

Virtually the answers to all these questions are in the Virtually the answers to all these questions are in the negative. Why?negative. Why?

What has gone wrong? What has gone wrong? Is it correct that the government’s role should be Is it correct that the government’s role should be

confined to merely creating an enabling confined to merely creating an enabling environment? environment?

Shouldn’t there be some strategic interventions by Shouldn’t there be some strategic interventions by GovernmentGovernment ? ?

Page 4: THE WORLD BANK ENERGY WEEK 2006 (6 – 8 MARCH, 2006) CHALLENGES FACED IN INCREASING MODERN ENERGY ACCESS: THE CASE OF UGANDA. KEY NOTE ADDRESS BY: HON

IMPACT OF POWER SECTOR REFORMS - IMPACT OF POWER SECTOR REFORMS - OUR EXPERIENCEOUR EXPERIENCE

To increase electricity access, there must be several To increase electricity access, there must be several prerequisites to realise the objective. prerequisites to realise the objective.

First there must be adequate generation capacityFirst there must be adequate generation capacity Secondly, there must be adequate financing to ensure Secondly, there must be adequate financing to ensure

that this required capacity is built and the associated that this required capacity is built and the associated access infrastructure (transmission and distribution access infrastructure (transmission and distribution network) is put in place. network) is put in place.

Thirdly, electricity services must be affordable.Thirdly, electricity services must be affordable. Following the reforms; our expectation was that the Following the reforms; our expectation was that the

process of realising projects by the private sector process of realising projects by the private sector would be on a fast track.would be on a fast track.

Today, apart from the two concessions of the existing Today, apart from the two concessions of the existing generation and distribution, there is negligible generation and distribution, there is negligible progress in new private sector projects. progress in new private sector projects.

Page 5: THE WORLD BANK ENERGY WEEK 2006 (6 – 8 MARCH, 2006) CHALLENGES FACED IN INCREASING MODERN ENERGY ACCESS: THE CASE OF UGANDA. KEY NOTE ADDRESS BY: HON

IMPACT OF POWER SECTOR REFORMS- IMPACT OF POWER SECTOR REFORMS- OUR EXPERIENCE cont’dOUR EXPERIENCE cont’d

This is inspite of the fact that there has been a lot This is inspite of the fact that there has been a lot of private sector interest to participate in of private sector interest to participate in developing large hydropower and other small developing large hydropower and other small renewable energy generation projects.renewable energy generation projects.

So, why has this interest not translated into So, why has this interest not translated into implementation of projects?implementation of projects?

One of the main reasons has been the differences One of the main reasons has been the differences in perception between ourselves and our in perception between ourselves and our development partners, especially the World Bank.development partners, especially the World Bank.

Government attracted three independent power Government attracted three independent power producers for the Bujagali (250MW), Kalagala producers for the Bujagali (250MW), Kalagala (450MW) and Karuma (150MW) hydro projects.(450MW) and Karuma (150MW) hydro projects.

Page 6: THE WORLD BANK ENERGY WEEK 2006 (6 – 8 MARCH, 2006) CHALLENGES FACED IN INCREASING MODERN ENERGY ACCESS: THE CASE OF UGANDA. KEY NOTE ADDRESS BY: HON

IMPACT OF POWER SECTOR REFORMS- OUR IMPACT OF POWER SECTOR REFORMS- OUR EXPERIENCE cont’dEXPERIENCE cont’d

WORLD BANK NEW ISSUES INCLUDED:WORLD BANK NEW ISSUES INCLUDED: Uganda’s macro-economic stability would be overturned Uganda’s macro-economic stability would be overturned

by such massive investments. So, our development by such massive investments. So, our development partners forced us to settle for one project, i.e. Bujagali.partners forced us to settle for one project, i.e. Bujagali.

Did Uganda actually have the demand to warrant even Did Uganda actually have the demand to warrant even one project of 250MW? On this, unending studies were one project of 250MW? On this, unending studies were carried out by the World Bank Group.carried out by the World Bank Group.

Bujagali became a subject of demonisation by Bujagali became a subject of demonisation by environmental groups which had other agenda .This environmental groups which had other agenda .This debate was allowed to derail the implementation of the debate was allowed to derail the implementation of the project for seven years to the point when the developer, project for seven years to the point when the developer, AES, which was also experiencing a financial squeeze at AES, which was also experiencing a financial squeeze at that time, decided to withdraw .that time, decided to withdraw .

RESULT:RESULT:Uganda is now experiencing an Uganda is now experiencing an unprecedented energy crisis as the prolonged unprecedented energy crisis as the prolonged drought is playing havoc with the water levels of drought is playing havoc with the water levels of Lake VictoriaLake Victoria

Page 7: THE WORLD BANK ENERGY WEEK 2006 (6 – 8 MARCH, 2006) CHALLENGES FACED IN INCREASING MODERN ENERGY ACCESS: THE CASE OF UGANDA. KEY NOTE ADDRESS BY: HON

IMPACT OF POWER SECTOR REFORMS- OUR IMPACT OF POWER SECTOR REFORMS- OUR EXPERIENCE cont’dEXPERIENCE cont’d

Our two power stations have total installed Our two power stations have total installed capacity of 380MW, but only 135MW can be capacity of 380MW, but only 135MW can be generated now due to the drought. It is generated now due to the drought. It is estimated that this will fall to 80MW by June estimated that this will fall to 80MW by June this year if the drought conditions persist. this year if the drought conditions persist.

We have now been forced to go for the We have now been forced to go for the expensive thermal (diesel) power, something expensive thermal (diesel) power, something that could have been avoided if our plans for that could have been avoided if our plans for hydro power projects had not been derailed hydro power projects had not been derailed by theoretical debates.by theoretical debates.

So how can we talk of increased access with So how can we talk of increased access with this expensive un affordable thermal power?this expensive un affordable thermal power?

Page 8: THE WORLD BANK ENERGY WEEK 2006 (6 – 8 MARCH, 2006) CHALLENGES FACED IN INCREASING MODERN ENERGY ACCESS: THE CASE OF UGANDA. KEY NOTE ADDRESS BY: HON

IMPACT OF POWER SECTOR REFORMS- OUR IMPACT OF POWER SECTOR REFORMS- OUR EXPERIENCE cont’dEXPERIENCE cont’d

Another challenge associated with generation projects Another challenge associated with generation projects has been difficulties in financial resource mobilisation. has been difficulties in financial resource mobilisation.

The Bujagali project took almost 7 years to reach The Bujagali project took almost 7 years to reach financial closure before the sponsor withdrew. financial closure before the sponsor withdrew.

Government has also promoted and received interest Government has also promoted and received interest in small, grid connectable renewable energy projects in small, grid connectable renewable energy projects to the tune of over 100MW consisting of mainly small to the tune of over 100MW consisting of mainly small hydros and sugar bagasse co-generation. hydros and sugar bagasse co-generation.

A weak local financial market, inadequate guarantees A weak local financial market, inadequate guarantees and weak equity positions of some sponsors have and weak equity positions of some sponsors have contributed to the stalling of project implementation. contributed to the stalling of project implementation.

Mechanisms, such as a Credit Support Facility to Mechanisms, such as a Credit Support Facility to support local participating financial institutions, are support local participating financial institutions, are now being instituted to enable these projects to movenow being instituted to enable these projects to move

Therefore, while a lot of start-up has been made, it has Therefore, while a lot of start-up has been made, it has not translated into our expectations as we initiated the not translated into our expectations as we initiated the reform process almost 10 years ago.reform process almost 10 years ago.

Page 9: THE WORLD BANK ENERGY WEEK 2006 (6 – 8 MARCH, 2006) CHALLENGES FACED IN INCREASING MODERN ENERGY ACCESS: THE CASE OF UGANDA. KEY NOTE ADDRESS BY: HON

MANAGING THE TRANSITIONMANAGING THE TRANSITION As we went about implementing the reforms, it was As we went about implementing the reforms, it was

assumed that we could break away from the assumed that we could break away from the traditional public sector service delivery and go traditional public sector service delivery and go straight into private sector delivery models. straight into private sector delivery models.

This is the way our World Bank supported Energy for This is the way our World Bank supported Energy for Rural Transformation (ERT) project was designed. Rural Transformation (ERT) project was designed. Our experience to-date has proved this assumption Our experience to-date has proved this assumption wrong.wrong.

It takes time to package good projects and arouse It takes time to package good projects and arouse the interest of the private sector. In addition local the interest of the private sector. In addition local business entrepreneurship requires time for business entrepreneurship requires time for sensitisation and capacity building to be able to sensitisation and capacity building to be able to participate, plus the for usual caution that is common participate, plus the for usual caution that is common with investors entering an uncertain rural market.with investors entering an uncertain rural market.

Our recommendation is that in implementing Our recommendation is that in implementing reforms, there must be a recognised transition reforms, there must be a recognised transition process process

Therefore, resources should be allocated to both the Therefore, resources should be allocated to both the market-oriented reform initiatives as well as public market-oriented reform initiatives as well as public sector delivery efforts.sector delivery efforts.

Page 10: THE WORLD BANK ENERGY WEEK 2006 (6 – 8 MARCH, 2006) CHALLENGES FACED IN INCREASING MODERN ENERGY ACCESS: THE CASE OF UGANDA. KEY NOTE ADDRESS BY: HON

TARGETING POVERTY REDUCTIONTARGETING POVERTY REDUCTION It is established that electricity access to rural areas It is established that electricity access to rural areas

contributes to poverty reduction by catalysing contributes to poverty reduction by catalysing productive uses of energy and enabling increased productive uses of energy and enabling increased incomes among the population, thus resulting into incomes among the population, thus resulting into economic growth. economic growth.

Electricity services are also essential for improved Electricity services are also essential for improved social services, i.e, health, education and water social services, i.e, health, education and water supply, as well as facilitating telecommunication supply, as well as facilitating telecommunication services. services.

There has been a debate between developing There has been a debate between developing countries and our development partners as to what countries and our development partners as to what should come first: demand to justify extending should come first: demand to justify extending electricity or supply of electricity to excite economic electricity or supply of electricity to excite economic activities and provide the services? activities and provide the services?

In our view, the two are not mutually exclusive. In our view, the two are not mutually exclusive. Uganda’s experience is that extension of electricity to Uganda’s experience is that extension of electricity to an area which did not necessarily have existing an area which did not necessarily have existing demand at the time of project implementation helped demand at the time of project implementation helped the development of viable load centres within a the development of viable load centres within a short time due to the economic activities excited by short time due to the economic activities excited by the availability of electricity.the availability of electricity.

Page 11: THE WORLD BANK ENERGY WEEK 2006 (6 – 8 MARCH, 2006) CHALLENGES FACED IN INCREASING MODERN ENERGY ACCESS: THE CASE OF UGANDA. KEY NOTE ADDRESS BY: HON

TARGETING POVERTY REDUCTION cont’dTARGETING POVERTY REDUCTION cont’d

Our development partners should support an access Our development partners should support an access planning approach that incorporates both aspects. planning approach that incorporates both aspects. Where there is already demand, the private sector can Where there is already demand, the private sector can be supported to go there. be supported to go there.

Where there is need to supply electricity first in order Where there is need to supply electricity first in order to excite demand, resources could be channelled to excite demand, resources could be channelled through the public sector to extend the infrastructure through the public sector to extend the infrastructure and then bring in the private sector as implementation and then bring in the private sector as implementation proceeds in one way or the other (e.g. new company, proceeds in one way or the other (e.g. new company, existing distribution service provider, cooperative, etc).existing distribution service provider, cooperative, etc).

Without looking at both approaches, we cannot achieve Without looking at both approaches, we cannot achieve equitable distribution while we run the danger of equitable distribution while we run the danger of keeping some of our population in poverty.keeping some of our population in poverty.

Page 12: THE WORLD BANK ENERGY WEEK 2006 (6 – 8 MARCH, 2006) CHALLENGES FACED IN INCREASING MODERN ENERGY ACCESS: THE CASE OF UGANDA. KEY NOTE ADDRESS BY: HON

CHOICE OF APPROPRIATE DELIVERY CHOICE OF APPROPRIATE DELIVERY MODELS.MODELS.

One of the major challenges is how to achieve equitable One of the major challenges is how to achieve equitable distribution, which is politically and socially desirable, distribution, which is politically and socially desirable, while the reforms emphasize private sector infrastructure while the reforms emphasize private sector infrastructure development and service delivery.development and service delivery.

In Sub-Saharan African countries, while the majority of the In Sub-Saharan African countries, while the majority of the rural population is poor, there are still evident economic rural population is poor, there are still evident economic disparities which will make certain areas or regions disparities which will make certain areas or regions unviable for profit motivated private sector concessions. unviable for profit motivated private sector concessions.

Recently, in Uganda, we packaged five distribution Recently, in Uganda, we packaged five distribution projects selected from different regions for private sector projects selected from different regions for private sector bidding. These were meant to be pilot concessions to bidding. These were meant to be pilot concessions to gauge the appetite of the private sector. Three of the five gauge the appetite of the private sector. Three of the five projects, from better economically endowed areas, got projects, from better economically endowed areas, got bidders while two, from less endowed regions, received bidders while two, from less endowed regions, received none. Yet, these two areas and many others like them none. Yet, these two areas and many others like them have to be served. have to be served.

Page 13: THE WORLD BANK ENERGY WEEK 2006 (6 – 8 MARCH, 2006) CHALLENGES FACED IN INCREASING MODERN ENERGY ACCESS: THE CASE OF UGANDA. KEY NOTE ADDRESS BY: HON

CHOICE OF APPROPRIATE DELIVERY CHOICE OF APPROPRIATE DELIVERY MODELS cont..MODELS cont..

We have found it prudent to make a determination of We have found it prudent to make a determination of such disadvantaged areas and provide plans for their such disadvantaged areas and provide plans for their electrification on a non-profit basis, where communities electrification on a non-profit basis, where communities can participate in the installation, operation and can participate in the installation, operation and maintenance of the local infrastructure. These could be maintenance of the local infrastructure. These could be grid connected or remote, off-grid communities. This grid connected or remote, off-grid communities. This would be under a cooperative management approach. would be under a cooperative management approach.

The next challenge in this aspect is how to appropriately The next challenge in this aspect is how to appropriately design the system in such a way that the tariffs charged design the system in such a way that the tariffs charged can cover all the operational and maintenance costs and can cover all the operational and maintenance costs and cover any loan repayments incurred.cover any loan repayments incurred.

This calls for appropriate low cost technological choices This calls for appropriate low cost technological choices for electrifying the poor and financing approaches that for electrifying the poor and financing approaches that would include capitalisation of community in-kind would include capitalisation of community in-kind contributions (labour, way leaves, materials, etc) as contributions (labour, way leaves, materials, etc) as equity.equity.

Page 14: THE WORLD BANK ENERGY WEEK 2006 (6 – 8 MARCH, 2006) CHALLENGES FACED IN INCREASING MODERN ENERGY ACCESS: THE CASE OF UGANDA. KEY NOTE ADDRESS BY: HON

CHOICE OF APPROPRIATE DELIVERY CHOICE OF APPROPRIATE DELIVERY MODELS cont..MODELS cont..

Another challenge has been that of accessing basic Another challenge has been that of accessing basic electricity services to the dispersed households which can electricity services to the dispersed households which can only be served using solar PV systems. Main issue is only be served using solar PV systems. Main issue is affordability. In Uganda, we have piloted several affordability. In Uganda, we have piloted several approaches that include direct commercial sales with a approaches that include direct commercial sales with a performance based subsidy, promoting small systems (e.g performance based subsidy, promoting small systems (e.g two lights) and medium term (2 – 3 years) consumers two lights) and medium term (2 – 3 years) consumers financing. financing.

We have found a lot more promise in medium term We have found a lot more promise in medium term consumer financing. The critical issue is to create the right consumer financing. The critical issue is to create the right synergies between large financial institutions, equipment synergies between large financial institutions, equipment suppliers and rural based micro-finance institutions. In suppliers and rural based micro-finance institutions. In Uganda’s case, realising the lack of scale up using purely Uganda’s case, realising the lack of scale up using purely commercial sales by equipment vendors, a protracted commercial sales by equipment vendors, a protracted negotiation with the World Bank has resulted into an negotiation with the World Bank has resulted into an agreement in principle to use commercial/development agreement in principle to use commercial/development banks to provide medium to long-term financing to banks to provide medium to long-term financing to companies for leasing equipment or rural micro-finance companies for leasing equipment or rural micro-finance institutions for providing solar systems on loan. institutions for providing solar systems on loan.

Page 15: THE WORLD BANK ENERGY WEEK 2006 (6 – 8 MARCH, 2006) CHALLENGES FACED IN INCREASING MODERN ENERGY ACCESS: THE CASE OF UGANDA. KEY NOTE ADDRESS BY: HON

CHOICE OF APPROPRIATE DELIVERY CHOICE OF APPROPRIATE DELIVERY MODELS cont..MODELS cont..

To hedge the attendant risks, a guarantee fund To hedge the attendant risks, a guarantee fund for the banks is being established under the ERT for the banks is being established under the ERT project.project.

To increase affordability, subsidies will be To increase affordability, subsidies will be provided for targeted areas. The bottom line, in provided for targeted areas. The bottom line, in our view, is that scaling up PV access will require our view, is that scaling up PV access will require targeted incentives that bring the service within targeted incentives that bring the service within the monthly budgets of consumers for the needed the monthly budgets of consumers for the needed energy services.energy services.

Page 16: THE WORLD BANK ENERGY WEEK 2006 (6 – 8 MARCH, 2006) CHALLENGES FACED IN INCREASING MODERN ENERGY ACCESS: THE CASE OF UGANDA. KEY NOTE ADDRESS BY: HON

CONCLUSIONCONCLUSION Many countries in the Sub-Saharan African region Many countries in the Sub-Saharan African region

have taken, or are taking, up the challenge of have taken, or are taking, up the challenge of implementing energy sector reforms.implementing energy sector reforms.

In all this, the aim is to create a sector that can In all this, the aim is to create a sector that can respond appropriately to the needs of increasing respond appropriately to the needs of increasing modern energy access, especially electricity modern energy access, especially electricity services.services.

For those countries like Uganda, which For those countries like Uganda, which spearheaded the reforms in the region, the reality spearheaded the reforms in the region, the reality on the ground does not show that there has been a on the ground does not show that there has been a tangible move forward. tangible move forward.

The only conclusion that can be drawn is, The only conclusion that can be drawn is, therefore, that there is a need to re-examine and therefore, that there is a need to re-examine and redesign the strategies and the programmes that redesign the strategies and the programmes that we have put in place with the help of our we have put in place with the help of our development partners, basing them on the realities development partners, basing them on the realities of each reforming country other than the “one-size-of each reforming country other than the “one-size-fits-all” prescription which, apparently, is now fits-all” prescription which, apparently, is now being applied.being applied.

Page 17: THE WORLD BANK ENERGY WEEK 2006 (6 – 8 MARCH, 2006) CHALLENGES FACED IN INCREASING MODERN ENERGY ACCESS: THE CASE OF UGANDA. KEY NOTE ADDRESS BY: HON

I THANK YOUI THANK YOU