the use of a geographic information system (gis)the use of...

33
The use of a Geographic Information System (GIS) The use of a Geographic Information System (GIS) with integrated human health risk assessment capabilities to optimize the remediation strategy to optimize the remediation strategy for a sensitive brownfield redevelopment Á V Seminário Internacional sobre Remediação e Revitalização de Áreas Contaminadas - Sao Paolo, 6 November 2007 Charlie Miller Sanofi-Aventis Charlie Miller , Sanofi Aventis Frédéric Hamilton, Environ France

Upload: others

Post on 31-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

The use of a Geographic Information System (GIS)The use of a Geographic Information System (GIS) with integrated human health risk assessment capabilitiesto optimize the remediation strategyto optimize the remediation strategyfor a sensitive brownfield redevelopment

ÁV Seminário Internacional sobre Remediação e Revitalização de Áreas Contaminadas - Sao Paolo, 6 November 2007Charlie Miller Sanofi-AventisCharlie Miller, Sanofi Aventis

Frédéric Hamilton, Environ France

Page 2: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

Foreword

As the project and land sale discussions are still on-going theAs the project and land sale discussions are still on-going, the presentation will focus on the technical approach and associated tools illustrated with a hypothetical case.

Key parameters are taken from the real case, but all figures, site layout and associated data have been made up.

Page 3: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

Context and objectivesj

Key project parameters- 11 ha industrial site in urban area : chemical developmentp- Sensitive use redevelopment : school, nursery, residential areas, hospital,

etc…- Short deadlines : final site closure by the end of 2006 / future construction

works should begin by the end of 2008

In the French regulatory context, the remediation project is validated by the administration if residual risk assessmentvalidated by the administration if residual risk assessment shows that residual concentrations are compatible with detailed future site use

Need to develop a sophisticated tool in order to - Manage and archive large number of data- Run risk assessment simulations quickly in order to anticipate the influence of

architectural changes in the project- Meet deadlines and optimize the project costs

Page 4: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

Site closure and remediation process

OWNER

Key Steps

1 – Site closure1 Site closure

2 – Site investigations

3 – Characterization of future site use

Use of GIS & Database

Upload of data in GIS and risk-based assessment to optimize works and future use projects

4 – Remediation works

j

Field observations

BUYER/REDEVELOPPER6 – Redevelopment

5 – Deed restrictions

Page 5: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

1 – Site Closure

Remediation of industrial site f i i B fi ld d lfor a sensitive Brownfield redevelopment

Description

Sensitive Future Use

School, residential housing, hospital, nursery…

2006 : Site closure

p

Surface 11 ha

Activity 1912 – 1937 : metals pre-treatment 1938 – 2007 : chemical development Other stakeholders

Resources Max : 475 employeesMin : 142 (2006) employees

Hydrogeology AlluviumsG d t t 15 d th

Global redevelopment plan defined with all stakeholders such as town hall, regulatory authorities, redeveloper

Groundwater at 15m depth

Page 6: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

Remediation of industrial sitefor a sensitive Brownfield redevelopment

OWNER

Key Steps

1 – Site closure1 Site closure

2 – Site investigations

3 – Characterization of future site use

Use of GIS & Database

Upload of data in GIS and risk-based assessment to optimize works and future use projects

4 – Remediation works

j

Field observations

BUYER/REDEVELOPPER6 – Redevelopment

5 – Deed restrictions

Page 7: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

2 – Site InvestigationsHistory

Industrial Area

History

Pilot Units

Industrial Area

Raw material storage

On-site disposal Waste

storageAdministrative

ffi

On-site disposal cross-sectionResidential

Area

offices

Area

Sit h t i ti l l b t d i ti ith th iti d thi d t tSite characterization plan elaborated in cooperation with authorities and third party expert:

soil borings and monitoring wells based on a 15 m x 15 m x 1m gridup to 7 or 15 m depth – for 45 substances

Page 8: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

2 – Site investigationsSoilSoil

Log

Lab certificates

S l

Automated importation of data

Samples

Page 9: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

2 – Site InvestigationsGroundwaterGroundwater

Log

Lab certificates

PCE lPCE plume

VOCls concentrations in Pz1 (µg/l)

1000

1500

2000

2500

VOCl

s (p

pm)

PCE

TCE

Cis 1,2-DCe

Cis 1,2-DCA

Chloroform

0

500

28-s

ept.-

06

3-no

v.-0

6

19-d

ec.-0

6

6 fe

b.-0

7

29 m

ar.-0

7

10-m

ai-0

7

13-ju

in-0

7

23-ju

il.-07

V

1,1-DCE

VC

Averagevalue

Page 10: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

2 – Site investigationsSummarySummary

Industrial areaIndustrial area

SamplingSampling

•Soil

•Groundwater

Residential area

•Demolition material

area

Over 200 000 data were generated byOver 200 000 data were generated by site investigations of 11ha site

Page 11: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

2 - Site investigationsOrganization in GIS

Automated grid of the site (15 m x 15 m x 1 m h)

Organization in GIS

g ( )

Page 12: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

2 - Site investigationsOrganization in GIS

-Identification (reference name/id)

Localisation (x y z l h p z top z bottom)

Organization in GIS

-Localisation (x, y, z, l, h, p, z top, z bottom)

-History

- Past use (basement, backfill, …)

- Future Use

- Areas (grids) requiring excavation

- Analysis

- Geology

- …

Page 13: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

2 - Site investigationsOrganization in GISOrganization in GIS

Layer 4: Soil borings

Layer 3: APCs

Layer 2: Piezometers

Layer 1: Current and future buildings

Storage of data by grid and by layer

Layer 4: Soil borings

Page 14: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

Remediation of industrial sitefor a sensitive Brownfield redevelopment

OWNER

Key Steps

1 – Site closure1 Site closure

2 – Site investigations

3 – Characterization of future site use

Use of GIS & Database

Upload of data in GIS and risk-based assessment to optimize works and future use projects

4 – Remediation works

j

Field observations

BUYER/REDEVELOPPER6 – Redevelopment

5 – Deed restrictions

Page 15: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

3 – Characterization of future site useRedevelopment projectRedevelopment project

Site layout

Integration in GISIntegration in GIS

All data associated with redevelopment project is uploaded in GIS

•Depth of excavation•Building activities•Ventilation rates•Construction specifications•….

Grid layer

Page 16: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

Remediation of industrial sitefor a sensitive Brownfield redevelopment

OWNER

Key Steps

1 – Site closure1 Site closure

2 – Site investigations

3 – Characterization of future site use

Use of GIS & Database

Upload of data in GIS and risk-based assessment to optimize works and future use projects

4 – Remediation works

j

Field observations

BUYER/REDEVELOPPER6 – Redevelopment

5 – Deed restrictions

Page 17: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

Risk ModuleConceptual Site ModelConceptual Site Model

+

Page 18: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

Risk Module Equations

[ ]Cx10xL ER

L/D H + )F K( +

H

=V s3B

Seffs

assococws

s

si⎤⎡

⎥⎦

⎤⎢⎣

⎡ ξ

θρθρ e

Equations

Fate & Transport equations

( ) [ ]C x 10x

1/

L/D + L ERL/D +

V ss

effS

B

Seffs

si

−⎥⎦

⎤⎢⎣

⎡⎥⎦

⎤⎢⎣

⎡ ξξ eAQ

ebs

eff/LD ⎤⎡

• from international literature: J&E, VOLASOIL, CSOIL,..

• for all types of media: soil & gw vapors, plant uptake, …

[ ]3

ξ

bs

GWeff

ws

B

GWeff

ws

ξ

B

gwws

gwi 101e

)/A(Q/LD

LER/LD

e

eERL

/LDH

×

−×⎥⎥⎦

⎢⎢⎣

⎡+⎥⎥⎦

⎢⎢⎣

×+

×⎥⎥⎦

⎢⎢⎣

⎡×

=Exposure equations

• for all types of pathways: vapor inhalation soil & plant• for all types of pathways: vapor inhalation, soil & plant uptake, dermal contact…

FEFIRCs ×××365BW

FEFIRCsDJE×

×××=

365BW10EFJFAFSACDJE

-6ss

×××××××

=

Page 19: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

Risk ModuleDatabase StructureDatabase Structure

- Physchem & tox data

- Henry’s law

- Koc

- Inhalation slope factor

- Oral tolerable daily intake

- …

- Building properties

- Building ventilation rate

- Building perimeter

- Room height

f

- Dust emission

- Vapor migration

- Crawl space

- …

- Transfer pathwaysp g

- Soil characteristics

- Porosity- Lifetime duration

- Human exposure parameters

- …- Exposure duration

- Exposure frequency

- Soil, water ingestion rateSoil, water ingestion rate

- Skin surface

- …

Page 20: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

Risk ModuleDatabaseDatabase

Employé (adulte travaillant dans les locaux)Employé (adulte travaillant dans les locaux)

Page 21: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

GIS & Risk moduleInterpretation of data

Site database

Interpretation of dataRisk database

Visual risk characterization

Geology,

Depth,

Scenario,

Transport equations,+ Visual risk characterizationDepth,

Concentrations,

….

Transport equations,

Ventilation rates,

….

+

Estimation of volume of excavation / backfill

Estimation of remediation costs

Page 22: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

GIS & Risk module Optimization of remediation worksOptimization of remediation works

Page 23: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

GIS & Risk module Optimization of remediation worksOptimization of remediation works

Initial redevelopment project Assessment of 2 scenarios

Outdoor areasAssessment of worst case exposure scenario (adult, 8 h/day, direct exposure to soils)

Future constructed areaAssessment of worst case exposure scenario (child, 24h/24h no basement no underground structures)soils) 24h/24h, no basement, no underground structures)

Page 24: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

GIS & Risk module Optimization of remediation worksOptimization of remediation works

Initial redevelopment project Assessment of 2 scenarios

Risk interpretation

Outdoor areasAssessment of worst case exposure scenario (adult, 8 h/day, direct exposure to soils)

Future constructed areaAssessment of worst case exposure scenario (child, 24h/24h no basement no underground structures)soils) 24h/24h, no basement, no underground structures)

Page 25: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

GIS & Risk module Optimization of remediation worksOptimization of remediation works

Risk interpretation

Simulation of remediation works

Building concrete volume Identification of grids/areas

generating unacceptable riskBackfill/earth volume

Cost estimate

Page 26: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

GIS & Risk module Optimization of remediation worksOptimization of remediation works

Joint optimization of detailed future use project and remediation worksOutdoor areas

•removal of all waste from on-site disposal area excavation to 11 m depth

•redefinition of future use parking areas, green areas

Indoor areas•building specifications presence of crawl space, technical galleries, air renewal rate…

Future parking

Excavation of on-sitedisposal area

Future green areas

Page 27: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

GIS & Risk module Optimization of remediation worksOptimization of remediation works

Optimization of the global project after several evolutions and simulations

Initial risks OptimizedInitial projectInitial risks pInitial project

Final risks Final project

Page 28: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

GIS & Risk module Optimization of remediation worksOptimization of remediation works

Optimization – SummaryOptimization Summary- Final redevelopment optimized based on risks

Construction specifications (crawl space and minimum air renewal rates)- Construction specifications (crawl space and minimum air renewal rates)- Clean top spoil layer of 50 cm in green areas- Recycling of demolition materials as backfill for delineated areasy g- Precise definition of areas to excavate (by grid)

Page 29: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

Remediation of industrial sitefor a sensitive Brownfield redevelopment

OWNER

Key Steps

1 – Site closure1 Site closure

2 – Site investigations

3 – Characterization of future site use

Use of GIS & Database

Upload of data in GIS and risk-based assessment to optimize works and future use projects

4 – Remediation works

j

Field observations

BUYER/REDEVELOPPER6 – Redevelopment

5 – Deed restrictions

Page 30: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

4. Remediation works

DemolitionExcavation of former on-site disposal

area

Grinded concrete Material sorting and segregation

Page 31: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

4. Remediation worksGIS & Risk moduleGIS & Risk module

Use of GIS & Risk module during work phaseUse of GIS & Risk module during work phase- Continuous update of database as works are being performed- Responsiveness to “surprises” (identification of new hot spot, backfill, (

etc.) and manage quickly excavated material- Traceability of excavated material

As work progressed the tool enabled the use of real time data to confirm- As work progressed, the tool enabled the use of real time data to confirm the results of the risk assessment

Page 32: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

5. Deed restrictions

PCE plume (water) • Groundwater use beneath the site is limited/restricted

• Access to monitoring wells for surveillance

No impact off-site(concentration < drinking water standards)

• Access to monitoring wells for surveillance

• Former on-site disposal area redeveloped as a parking

•Sensitive buildings have basements where air(concentration < drinking water standards)

Concentrations on-site compatible with future use (no risks associated with vapor exposure)

•Sensitive buildings have basements where air renewal rates > 3 changes per hour

• Utility corridor (air renewal rates > 2 changes per hour)

• Clean top layer of soil (50 cm)

• Any modification (new construction or modification of redevelopment project) is subject to a new risk assessment

Former on-site disposalFormer on-site disposal backfilled with concrete

Page 33: The use of a Geographic Information System (GIS)The use of ...seminario.ekosbrasil.org/wp-content/uploads/2016/... · 3 – Characterization of future site use Use of GIS & Database

Conclusion

The GIS & Risk module tool has proven to be efficientI h l j h- In the early project phase

- To carry constructive discussions with the redeveloper to define and validate a final optimized redevelopment planT d hi t i d t- To manage and archive extensive data

- During the work phase - To quickly address “surprises”

T t l t t bilit f f d ti i ti l- To guarantee a complete traceability of performed operations, in particular backfilling with site demolition material and delineation of contaminated areas

- Along the whole project Establishment of tr st relationships ith third parties (administration e pert- Establishment of trust relationships with third parties (administration, expert advisor, redeveloper, …)

- Readiness and easiness for simulation (prospective risk assessment along the project)project)

- Ability to meet the deadlines