UNITING THE NATION’S ELECTRIC POWER GRID. THE TRES AMIGAS SUPERSTATION. ABB Western Utility Executive Conference September 28, 2010. 20 th Century Electric Transmission Grid. Utility Controlled. 21 st Century Electric Transmission Grid. Customer Desires & Configurations. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: THE TRES AMIGAS SUPERSTATION

THE TRES AMIGAS SUPERSTATION

ABB Western Utility Executive Conference

September 28, 2010

UNITING THE NATION’S ELECTRIC POWER GRID

Page 2: THE TRES AMIGAS SUPERSTATION

2

20th Century Electric Transmission Grid

Utility Controlled

Page 3: THE TRES AMIGAS SUPERSTATION

3

21st Century Electric Transmission Grid

Customer Desires & Configurations

Page 4: THE TRES AMIGAS SUPERSTATION

4

LARGE INTERCONNECTED AC TRANSMISSON SYSTEMS

Page 5: THE TRES AMIGAS SUPERSTATION

5

Common Interconnected AC System Problems

Long Distance Transmission

• Line losses

• System Voltage Stability/Levels

• Reactive Power Loading

• Steady state

• Transient Stability

• Subsynchronous Oscillations

• Latency issues (ie Spinning Reserves)

• Inductive and Capacitive limitation factors

Interconnections

• Uncontrolled Load flow problems and bottlenecks– Congestion Issues– Inter Area loop flow– Cascading Blackouts

• Oscillation Stability

• Frequency control

• Voltage Stability

• Physical interactions between power systems

Diminishing Returns with large interconnected AC Systems

Page 6: THE TRES AMIGAS SUPERSTATION

6

Common Interconnected AC System Problems

High Cost of Interconnections– Reliability Costs: NERC, RC, Relaying– N-1 criteria often creates underutilization of transmission

lines– Complex coordinating arrangements (RTOs, IA, JOAs, etc.)– Need for sophisticated and costly system impact studies– Participation agreement complications with multiple

impacted entities– Regional/Subregional perturbations/phenomena difficult

and costly to analyze and manage – Deterministic planning practices do not capture the true

economic value of transmission additions/upgrades

Page 7: THE TRES AMIGAS SUPERSTATION

7

Next Step – The Evolution to Fast Acting HVDC

• The only way to interconnect large AC power grids with different phases is via HVDC (High Voltage Direct Current) facilities– AC/DC/AC Stations– Hybrid Transmission systems (AC/DC…DC/AC)– Multipoint nodes – Long distance DC Transmission lines

• HVDC has the ability to control the direction and magnitude of the power flow at each node of a multipoint configuration thereby facilitating the precise needs of the interconnection points without adverse impacts to the interconnecting grid

• HVDC has the flexibility not only to adapt to grids with different AC system real time characteristics but to also facilitate optional ancillary services to each interconnection node

Page 8: THE TRES AMIGAS SUPERSTATION

8

“PRESENTLY, ONLY 30% OF ALL POWER GENERATED USES POWER ELECTRONICS SOMEWHERE BETWEEN THE POINT OF GENERATION AND END USE.  BY 2030,

80%OF ALL ELECTRIC POWER WILL FLOW THROUGH POWER ELECTRONICS .”

Power electronics moves beyond devices that simply provide increased awareness, such as Phasor measurement systems. These devices will respond to, interface with and control real time power flows.

From USDOE Office of Electric Delivery and Energy Reliability

Page 9: THE TRES AMIGAS SUPERSTATION

9

Benefits of Power electronics

• Increased power system reliability and security

• Increased efficiency and loading of existing transmission and distribution infrastructure

• Huge gains in real time power flow control

• Improved voltage and frequency regulation

• Improved power system transient and dynamic stability

• More flexibility in siting transmission and generation facilities

• The distinction between consumer devices and utility devices will largely be eliminated electrically

Page 10: THE TRES AMIGAS SUPERSTATION

10

21st century smart grid technologies compared with those in use today.

Source: IBM Institute for Business Value

Page 11: THE TRES AMIGAS SUPERSTATION

11

Page 12: THE TRES AMIGAS SUPERSTATION

12

Hierarchical View of the Issues facing the European Transmission System Operators (TSOs)

Single

European Electricity Market

•Pan-European Transmission Grid•Load-Generation Balance

•Congestion management•Ancillary services

•Settlement•Balancing Mechanisms

•Variable Renewable energy Generation•Storage

•Demand Side Management

Source: ENTSO-E: The pathway towards common European network operation

Page 13: THE TRES AMIGAS SUPERSTATION

13

China: Current HVDC National Grid Plan

Page 14: THE TRES AMIGAS SUPERSTATION

14

Europe: Extended Grid Plan

• From Iceland (Northwest) to Israel (Southeast)= 3,200 mi

• Concept of grid is 25,000 miles of line

Solar Power

Wind Power

Geothermal

Hydro

Biomass

The new high-voltage network would range from the Sahara to the polar cap. The concept calls for main lines that are 40,000 kilometers long. And parts of it already exist.

Connections already in place or planned

Vision of ABB and DLR

Page 15: THE TRES AMIGAS SUPERSTATION

15

The Location

Tres Amigas Is Ideally Situated in Eastern New Mexico Near the Borders of CO, OK and TX Serving as a Three-Way Interconnection of

WECC, Eastern and ERCOT

Page 16: THE TRES AMIGAS SUPERSTATION

16

The Location: Regional Renewable Resource Potential

Significant Regional Wind & Solar Capacity Factors in Excess of 35%

Source: NREL

Page 17: THE TRES AMIGAS SUPERSTATION

17

From the 2010 Transmission Summit in Sweetwater

17

w/ HVDC Proposals

Page 18: THE TRES AMIGAS SUPERSTATION

18

The Tres Amigas SuperStation

Page 19: THE TRES AMIGAS SUPERSTATION

19

Tres Amigas SuperStation….

Uniting the Electric Grid