Page 1: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

The status ofGiovanni Losurdo -INFN Firenze-Urbino

on behalf of the

Virgo Collaboration

Workshop on GW detection– Gingin, Oct. 4-7, 2005

Page 2: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 2

FRANCE - CNRS

• ESPCI – Paris

• IPN – Lyon

• LAL – Orsay

• LAPP – Annecy

• OCA - Nice

ITALY - INFN

• Firenze-Urbino

• Frascati

• Napoli

• Perugia

• Pisa

• Roma

Inaugurated July 2003

Page 3: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 3

Sensitivity Goal

seismic

thermal

shot

LIGO

First attempt to extend the detection band down to a few Hz!

Page 4: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 4

Thermal noise

The superattenuator

MeasuredUpper Limit

Page 5: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 5

A short summary

July 2003: Inauguration. Start of full detector commissioning

February 2004: first lock in “recombined” mode

(Michelson+FP)

October 2004: first lock in “recycled” mode

September 2005: inspiral range for NS/NS >1 Mpc

Autumn 2003: single cavity Feb. 2004: recombined Oct. 2004: recycled

Page 6: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 6

Inspiral range for NS/NS 30 kpc

Nov 03

Dec 04

Page 7: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 7

ITF bistability

Jan-May 05: commissioning slowed down by ‘jumps’

Physical origin not fully understood. Solved after work on alignment, locking, detection

ITF p

ow

er

(W)

Time (s)

Page 8: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

C6 and before

(June-July 05)

Page 9: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 9

Some ITF adjustments (injection bench alignment, tuning of demodulation phases, photodiode centering) allowed to get rid of the ‘jumps’

ITF stability improved by implementing angular drift control using wavefront sensing

Low frequency control noise reduced by improving the locking driving matrix

Locking procedure fully automated

15 days run (29 July – 12 August)

Remarkable improvement in sensitivity and stability

Page 10: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 10

C6 sensitivity

Page 11: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 11

0 5 10 14days

Recycling cavity power

C6 stability

Duration: 336h

Locking: 89.3%

Science mode: 86.2%

Longest lock stretch: 40 hours!

Page 12: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 12

C6 inspiral range

04/08(15:00 LT):

spurious beams damped on NE bench

04/08(15:00 LT):

spurious beams damped on NE bench

10/08 (14:00LT):

laser beam re-aligned on the IMC

10/08 (14:00LT):

laser beam re-aligned on the IMC

11/08 (15:30LT):

laser power stabilization reconfigured

11/08 (15:30LT):

laser power stabilization reconfigured

GPS: 807818236 ( 297kPc)

GPS: 807842186 ( 300kPc)

GPS: 807818236 ( 297kPc)

GPS: 807842186 ( 300kPc)

04/08(15:00 LT):

spurious beams damped on NE bench

04/08(15:00 LT):

spurious beams damped on NE bench

10/08 (14:00LT):

laser beam re-aligned on the IMC

10/08 (14:00LT):

laser beam re-aligned on the IMC

11/08 (15:30LT):

laser power stabilization reconfigured

11/08 (15:30LT):

laser power stabilization reconfigured

GPS: 807818236 ( 297kPc)

GPS: 807842186 ( 300kPc)

GPS: 807818236 ( 297kPc)

GPS: 807842186 ( 300kPc)

04/08(15:00 LT):

spurious beams damped on NE bench

04/08(15:00 LT):

spurious beams damped on NE bench

10/08 (14:00LT):

laser beam re-aligned on the IMC

10/08 (14:00LT):

laser beam re-aligned on the IMC

11/08 (15:30LT):

laser power stabilization reconfigured

11/08 (15:30LT):

laser power stabilization reconfigured

GPS: 807818236 ( 297kPc)

GPS: 807842186 ( 300kPc)

GPS: 807818236 ( 297kPc)

GPS: 807842186 ( 300kPc)

Best range: 0.4 Mpc

Inspiral range for NS/NS: optimal orientation

Stray beam dumpingon end benches

Power stabloop improvement

Page 13: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 13

C6 noise budget

Noise fully understood. Main contributions:– Length/angular control noise– Actuation (DAC) noise – Frequency noise

Page 14: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

After C6

(mid Aug-mid Sep 05)

Page 15: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 15

Actions after C6

Control noise reduction:– Autoalignment fully implemented!– Better length control noise rejection– Increase of modulation depth

DAC noise reduction– Full hierarchical control implemented (actuation over 3

stages)– Low gain/noise coil driver

Frequency noise reduction– More power on the photodiode providing the error signal

Important achievements:

Anderson technique demonstrated

SA control design demonstrated

ITF left locked during night !

Page 16: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 16

Autoalignment

Page 17: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 17

Pick-up of Sideband power

Automatic alignment of NE mirror using wavefront sensing of output dark-fringe: NO, YES

DC output power beforethe output mode cleaner

Pick-up of power recycling cavity power

DC output power afterthe output mode cleaner

AA effect on ITF signals

Page 18: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 18

Limited dynamic range requires to split forces over more control stages

Reducing the force on the mirror allows to reduce actuation noise

Hierarchical Control

DC-0.01 Hz

0.01-5 Hz

5-50 Hz

10 mN

Force applied to the mirror (a.u.) without hierarchical control

Force applied to the mirror with hierarchical control (same a.u.)

with tidal control with tidal control & re-allocation to

the marionette

1 mN

IP displacement

Page 19: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 19

zCorr reduction

Marionette/RM crossover @5 Hz

After reallocation zCorr rms reduced by 100 Allows switching to low noise coil driver (talk by A.Gennai)

Without marionette700 nm rms

With marionette7 nm rms

Page 20: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 20

Automation

Page 21: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 21

Automation

Lock Acq procedure fully automated

5 mins

Lock to DF variable finesse

AA ONOMC lock

MarionetteLow noise CD

techniqueLines ON

Page 22: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 22

C7 run

Many new features implemented, good sensitivity improvement

NS/NS inspiral range beyond Andromeda

New run decided before ITF scheduled shutdown

C7: 14-19 September

Page 23: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 23

C7 vs C6 sensitivity

Page 24: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 24

C7 duty cycle

Too many improvements in a short

A couple of stormy days

duty cycle worse than C6

…though still goodLocked: 70%Science mode: 64%

Page 25: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 25

C7 inspiral range

Best range: 1.65 Mpc for NS/NS, 8.6 Mpc for BH/BH

Page 26: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 26

C6 C7

Mpc

Page 27: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 27

DA commissioning

Two online analysis for chirp detection running

NS/NS events injected September 19

September 15

Injected events

1.2-1.6 S.M. Grid

1-3 S.M. Grid

Page 28: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 28

Page 29: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 29

Page 30: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Virgo upgrades

(Oct-Dec 2005)

Page 31: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 31

Problems with injection system

A small fraction (bigger than expected) of the light reflected by the interferometer is retro-diffused by the input mode cleaner mirror: spurious interference

Temporary solution: reduce the power (/10).

Virgo has been working with Pin=0.7 W

Final solution: install a Faraday isolator

A new injection bench is needed.Frequency noise Recycling mirror:

- aligned- not aligned

Page 32: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 32

Injection bench upgrade

New bench:– Larger surface available for optics mounting– Higher rigidity– New wires

Faraday isolator TGG (Terbium Gallium Garnet) produced by EOTec:– Compliant with 20 W laser– 40 dB isolation measured

Brewster dielectric polarizers

Rotator

Page 33: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 33

PR mirror: curved and compound– Nasty internal resonances, very

annoying for the locking– Misalignments and jitter induced by

translation

To be replaced with a standard flat Virgo mirror

PR transfer function

PR mirror replacement

Page 34: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 34

Progress summary

Page 35: The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005

Australia-Italy Workshop on GW – Gingin, Oct. 4, 2005 G.Losurdo – INFN Firenze-Urbino 35

2006 plan

Get close to DESIGN

SENSITIVITY

Make aSCIENCE RUN