Team Members Acknowledgements Tara Wiese, AECOM Kyle Reidsma, AECOM Dan Whitenger, AECOM Jeff Brinks, PE Mark Lenters, Ourston Roundabout Engineering From left to right: Kurtis Duemler, Micah Doorn, Nathan Breese, Ryan Betts The Roundabout Project 2017: Team 09 Existing layout of the SW side of campus Proposed layout of the SW side of campus Construct a single-lane roundabout for the intersection of the entrance drive from Burton and Knollcrest Circle Drive. The proposed roundabout will: Handle traffic more efficiently Reduce pedestrian conflicts Reduce confusion and unwelcoming impression to visitors Construct Knollcrest Circle Drive to the outside (west) of the parking lot. This includes: Removing the need for pedestrians to cross traffic after parking Relocating parking spots to account for the new route of the road Rearranging visitor parking lot to incorporate a new landscaped area and add parking Designing a proposed rain garden that will reduce the rain water runoff Solution In 2016, Calvin College released a master plan of the college’s campus, and one aspect of the master plan is vehicular circulation improvements. This project consists of two main components highlighted in the master plan: Redesign the intersection where the entrance drive from Burton Street meets Knollcrest Circle Drive Relocate the southwestern portion of Knollcrest Circle Drive Project Description Design Highlights 130’ outside diameter roundabout Roundabout designed for a 45’ coach bus Maximum queue length of 2 vehicles 99.6% parking spots maintained Rain garden to drain 93,405 ft 2 of pavement 4 new visitor parking spaces 8 crosswalks removed Estimated cost of about $3.7 million

Upload: others

Post on 11-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: The Roundabout Project - engr.calvinblogs.orgengr.calvinblogs.org/16-17/srdesign09/.../2016/10/Team09-Final-Post… · Team Members. Acknowledgements • Tara Wiese, AECOM • Kyle

Team Members

Acknowledgements

• Tara Wiese, AECOM • Kyle Reidsma, AECOM• Dan Whitenger, AECOM • Jeff Brinks, PE• Mark Lenters, Ourston Roundabout Engineering

From left to right: Kurtis Duemler, Micah Doorn, Nathan Breese, Ryan Betts

The Roundabout Project

2017: Team 09

Existing layout of the SW side of campus Proposed layout of the SW side of campus

• Construct a single-lane roundabout for the intersection of the entrance drive from Burton and Knollcrest Circle Drive. The proposed roundabout will:• Handle traffic more efficiently• Reduce pedestrian conflicts• Reduce confusion and unwelcoming impression to visitors

• Construct Knollcrest Circle Drive to the outside (west) of the parking lot. This includes:• Removing the need for pedestrians to cross traffic after parking • Relocating parking spots to account for the new route of the road• Rearranging visitor parking lot to incorporate a new landscaped area and add parking• Designing a proposed rain garden that will reduce the rain water runoff

Solution

In 2016, Calvin College released a master plan of the college’s campus, and one aspect of the master plan is vehicular circulation improvements. This project consists of two main components highlighted in the master plan:• Redesign the intersection where the entrance drive from Burton Street meets Knollcrest

Circle Drive• Relocate the southwestern portion of Knollcrest Circle Drive

Project Description

Design Highlights

• 130’ outside diameter roundabout• Roundabout designed for a 45’ coach bus• Maximum queue length of 2 vehicles• 99.6% parking spots maintained • Rain garden to drain 93,405 ft2 of pavement • 4 new visitor parking spaces• 8 crosswalks removed• Estimated cost of about $3.7 million