profil büro cw-englisch 2018 - homepage · 2019-08-12 · dipl. ing. carsten wiese ingenieurbüro...
TRANSCRIPT
Dipl. Ing. Carsten Wiese Ingenieurbüro
Business Information
Engineering Office
Graduate Engineer Carsten Wiese
The Engineering Office of CW provides all services according to the HOAI
• Structural Planning
Contact: Ingenieurbüro CW
Dipl. Ing. Carsten Wiese
Ritterplan 4a
37073 Göttingen
Tel. 0551 / 54717-0
Fax 0551 / 54717-27
E-Mail : [email protected]
Internet: www.statik-cw.de
Dipl. Ing. Carsten Wiese Ingenieurbüro page 2
E-Mail: [email protected] Internet: www.statik-cw.de
RÉSUMÉ
Dipl. Ing. Carsten Wiese
Certified Member of the Chamber of Engineers Niedersachsen (Nr. 4993)
Certified Member of the List of Architects (Nr. 7162)
Certified Member of the List of Structural Engineers (Nr. 14993)
Personal Data:
Date of Birth: 1966
Nationality: German
Profession: Graduate Engineer (FH)
Degree: 1991
Fachhochschule Hildesheim / Holzminden
Major in Structural Engineering
Qualifications: Project Management for Structural Planning
Development of structural designed plans
Development of design and approval planning
Creating structural and architectural reports
Construction Supervision
Career:
1991 - 1992: Ingenieurbüro Götz, Hildesheim
1992 - 2006: Ingenieurgruppe Wiese GmbH (IGW), Göttingen / Berlin
• Partner of IGW since 01.01.1995
• Authorised Signatory of IGW / Göttingen
since 21.07.1997
• Authorised Signatoryt of IGW / Berlin
since 30.09.1997
since 2006: Business Manager Ingenieur- & Architekturbüro CW
Dipl. Ing. Carsten Wiese Ingenieurbüro page 3
E-Mail: [email protected] Internet: www.statik-cw.de
Projects (abstract)
The office CW supervised the structural and architectural planning for the following:
• Reconstruction of the District Court Berlin-Mitte
• Extension and remodelling of the Vocational School III in Göttingen
• Extension and reconstruction of a social building in Northeim
• New construction of a service centre in Bodenfelde
• New construction of a seven floor hotel in Berlin
• Statical investigations of several gyms in Göttingen
• New Construction of the townhouse O7, Berlin-Friedrichswerder
• Reconstruction of a mansion into a Savings Bank-branch in Bodenfelde
• Inventory taking and evaluation of a hall roof construction of the Kodak co.
• inventory taking of 120 flats of the Kreiswohnungsbau-Gesellschaft Northeim
• Sheet-pile wall calculations for the Moroccan Embassy in Berlin
• Statement for reconstruction of a multi-storey car park in Köln
• New construction of halls in Ludwigsfelde and Göttingen
• New construction of a daycare facility for children in Salzgitter
• New construction of a hall with distribution centre in Nörten-Hardenberg
• Redevelopment of 86 residential units in Göttingen
• Extension (new construction refectory) Hainberg-Gymnasium Göttingen
• Modification and extension of a nursery in Göttingen
• Rebuilding of a hall in Nörten-Hardenberg after an impact of fire
• New construction of a service building in Kunduz, Afghanistan
Projects before 2006
The staff of the CW office was also involved in the structural planning of the following
projects:
• Statical calculations for the construction site clearance, Friedrichswerder-West
• New construction of the Jewish Museum (architect Daniel Libeskind)
• New construction of the Exhibition Halls in Berlin (architect Prof. O.M. Ungers &
partners)
• Modification of the National University Library in Göttingen
• New construction of the Family Court (architect Prof. O.M. Ungers & partners)
• New construction of the music hall in Berlin (architect Hans Scharoun)
• New construction of the City Centre in Wolfsburg
• New construction of the Marketplace Centre in Neubrandenburg
Dipl. Ing. Carsten Wiese Ingenieurbüro page 4
E-Mail: [email protected] Internet: www.statik-cw.de
Projects (extract)
The staff of the CW office was also involved in the following projects.
New construction of a farm building
Kunduz / Afghanistan
New construction of a data Center
New construction of a data Center
New construction of a high school
Northeim / Niedersachsen
New construction of a Hall
Nörten-Hardenberg /Niedersachsen
Rebuilding of a Commercial building
Berlin
New construction of a commercial building
Wolfsburg (2019) New construction of a residential building
Braunschweig
Dipl. Ing. Carsten Wiese Ingenieurbüro page 5
E-Mail: [email protected] Internet: www.statik-cw.de
New construction of the city-gallery
Wolfsburg
Extension of a hall
Northeim / Niedersachsen
New construction of the Exhibition Halls
Berlin
New construction of the Jewish Museum
Berlin
New construction of a residential building
Braunschweig
New construction of the do-it-yourself store
Braunschweig
Rebuilding of the district court
Berlin
Rebuilding of an office building
Senatsverwaltung Berlin
Dipl. Ing. Carsten Wiese Ingenieurbüro page 6
E-Mail: [email protected] Internet: www.statik-cw.de
New construction of a sports hall
Groß-Schneen / Niedersachsen
New construction of a residential building
Northeim / Niedersachsen
Rebuilding of the marketplace
Bad Nenndorf / Niedersachsen
New construction of the Music Hall
Berlin
New construction of a bank building
Göttingen
New construction of a commercial building
Göttingen
New construction of an data center
New construction of an office building
Berlin
Dipl. Ing. Carsten Wiese Ingenieurbüro page 7
E-Mail: [email protected] Internet: www.statik-cw.de
New construction of a Kindergarten
Moringen / Niedersachsen
New construction of an data center
New construction of a residential building
Northeim / Niedersachsen
Extension of a high school
Göttingen
New construction of a Hall
Northeim / Niedersachsen
Rebuilding HTZ
Berlin
New construction of the Family Court
Berlin
Rebuilding of a residential building
Northeim / Niedersachsen
Dipl. Ing. Carsten Wiese Ingenieurbüro page 8
E-Mail: [email protected] Internet: www.statik-cw.de
Some Projects in Detail (extract) Project New construction of a service building in Kunduz
Camp Kunduz, Afghanistan Performance General planning (structural and architectural planning)
Client Staatliches Hochbauamt Heidelberg
The approx. 4.900 m² commercial building for the German troops in northern
Afghanistan contains a kitchen, catering and storage areas, also social rooms and
walk-in freezers. Special design requirements were necessary because of the
geographical position (earthquake region). Also the safety (proximity to enemy fire)
had been a great challenge. The turnkey planning includes structural elements and
built-in units. For the interior of the building most material had to be transported from
Germany which took about 3 - 5 weeks.
Planning and construction time was only 12 months.
Dipl. Ing. Carsten Wiese Ingenieurbüro page 9
E-Mail: [email protected] Internet: www.statik-cw.de
Project New construction of a hall with distribution centre
Performance Structural planning
Client Fa. Rohde AG, Nörten-Hardenberg
The new building complex with 3.000 m² of selling, dispatching, packing, common rooms
and distributing.
Dipl. Ing. Carsten Wiese Ingenieurbüro page 10
E-Mail: [email protected] Internet: www.statik-cw.de
Project Reconstruction of the District Court, Berlin-Mitte
Performance Structural planning
Client Senat Berlin
For the reconstruction of the building a multitude of different floor and roof
constructions needed a static proof. Next to statical calculations various loading
tests were made on the historical and wide-span dome-shaped roof. The roof
constructions of the 12 building units completely had to be replaced or
redeveloped.
Dipl. Ing. Carsten Wiese Ingenieurbüro page 11
E-Mail: [email protected] Internet: www.statik-cw.de
Project Reconstruction and new construction of the former
planning department into a housing complex with underground car park in Northeim
Performance Structural planning, building physics
Client Kreissparkasse Northeim
The former planning department of Northeim has been modified into a modern,
senior-oriented housing complex with 12 residential units. The building consists of a
redeveloped historical building, a rebuilt central structure and a new construction.
The old building is with cellar and below the new construction is the underground
car park. For the statical calculation of the old building and the complex roof
construction were no actual statics available. The intention was to maintain most of
the existing building fabric.
Dipl. Ing. Carsten Wiese Ingenieurbüro page 12
E-Mail: [email protected] Internet: www.statik-cw.de
Project Reconstruction of the former “Reichsschuldenverwal-
tung“ into an office building of the Senate of Health and Human Services in Berlin – Kreuzberg
Performance Structural planning
Client Senat Berlin
Annotation:
The building consists of 10
building units.
The picture only shows a
view of the front face of
building unit 3.
For the reconstruction of the building all ceiling constructions had to be investigated
on load-bearing capacity.
The influence of the World War II and the following redevelopment in the seventies
led to several structural systems such as reinforced block floors, ribbed ceilings,
coffered ceilings and reinforced concrete ceilings. A lot of the ceiling panels had
be renewed for the new requirements. Therefore supporting constructions had to be
calculated. In the old building nine new lift shafts were assembled. Significant
calculation of supporting constructions had to be made here, too. For the
supporting of the bearing walls small supporters were used.
Dipl. Ing. Carsten Wiese Ingenieurbüro page 13
E-Mail: [email protected] Internet: www.statik-cw.de
Project Energetic investigations und concrete redevelopment of residential units in Göttingen
Performance Building physics, architectural planning
Client Eigentümergemeinschaft / Hausverwaltung Dawe
The front face of the residential units in the Hauptstraße 80-86 in Göttingen had
significant damages of structure. Missing insulation as well as construction and
building failings caused moisture problems and mould formations inside. Minor
concrete covers in the area of the balcony slab and the balcony parapet, incorrect
dewatering and wrongly made floor construction required additional
redevelopment measures.
Dipl. Ing. Carsten Wiese Ingenieurbüro page 14
E-Mail: [email protected] Internet: www.statik-cw.de
Project Modification of the National University Libary,
Göttingen
Performance Architectural and structural planning
Client Staatliches Baumanagement Göttingen
Annotation:
The libary consists of 7
building units.
The picture only shows a
view of the front face of
building unit 1.
Due to change of use (installation of heavy trolley containers for archiving) in several
floors the existing floor constructions, disk systems and column constructions had to
be investigated on load-bearing capacity. Remediation measures were necessary
because of the insufficient load-bearing capacity of the floors. For the different
construction stages physical safety measures were proved.
Dipl. Ing. Carsten Wiese Ingenieurbüro page 15
E-Mail: [email protected] Internet: www.statik-cw.de
Project Redevelopment of a bearing reinforced concrete
construction after an impact of fire in Langelsheim
Performance Investigation, remedial design, structural planning
Client Exner Technology GmbH, Langelsheim
The reinforced concrete walls and columns were heavily damaged by an impact of
fire. The company Exner Technology GmbH decided to rebuild the building by using
the remained steel structure. CW was contracted to:
• investigate the structure
• develop a remedial design
• structural analysis for stability
Dipl. Ing. Carsten Wiese Ingenieurbüro page 16
E-Mail: [email protected] Internet: www.statik-cw.de
Project Structural Safety Building Logbook, statical investigations of several gyms
Performance Structural planning
Client Landkreis Göttingen
After a tragic collapse of a ceiling construction of an ice rink in Bad Reichenhall, the
Landkreis Göttingen had decided to check the roof and the ceiling construction of
several gyms in Göttingen. CW had been contracted to investigate the stability of
the ceiling construction of 5 gyms. 1
Dipl. Ing. Carsten Wiese Ingenieurbüro page 17
E-Mail: [email protected] Internet: www.statik-cw.de
Technical Equipment / Software
Structural planning LP 1-4 Infograph Finite Elements Calculations
2D Beam and Shell Structures
3D Beam and shell Structures
Prestressing of Beam and Shell Structures
Carrying Capacity Checks
Serviceability Checks
Lochner Finite Elements Calculations
Program Building
Windloads / Reinforcements
Rooftops
Foundation Engineering (div. programs)
Wooden Structure (div. programs)
Steel Construction (div. programs)
Reinforced Concrete Construction (div. programs)
Composite Construction
Continuous Beam
Masonry
Frameworks
Loading Assumption
Structural Planning LP 5+6
DICAD / STRAKON Implementation Planning
Reinforcement Planning
Construction Planning
Detailed Planning
Cuts
Reinforcing Steel – Quantity Determination (per plan)
Reinforcing Steel – Quantity Determination (per project)