The Reconstruction of theTony Dapolito Recreation Center1 Clarkson Street New York, NY 10014
March 20, 2018
March 20, 2018 — Slide 2Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Table of Contents:
• Site Location
• Historical Context
• Existing Conditions
• Scope of Work
• Roof Parapet Security Fencing
• Roof Parapet Security Fencing - Mockup Photos
• Coping Stones
• Expansion Joints
• Stair 3 Windows
March 20, 2018 — Slide 3Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Clarkson St7t
h A
ve S
outh
Site LocationSite
Greenwich Village Historic District
N
March 20, 2018 — Slide 4Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Photograph showing original facade. ca. 1908. The Brick Builder, Vol. 17, No. 11.
Plate 140
Historical Context - Photographs
March 20, 2018 — Slide 5Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
3
1
2
new 7th ave alignment
original 7th ave alignment
1. 1908: Original building foot print.
2. 1922: Addition to conform with new 7th Avenue alignment.
3. 1929: Swimming pool addition
4. 1939: Outdoor pool addition
4
Historical Context - Building History
N
March 20, 2018 — Slide 6Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Existing Conditions - View from 7th Ave S and Carmine St.
March 20, 2018 — Slide 7Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Existing Conditions - View from Clarkson St.
March 20, 2018 — Slide 8Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Existing Conditions - View from Clarkson St.
March 20, 2018 — Slide 9Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Existing Conditions - View from Leroy St.
March 20, 2018 — Slide 10Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Existing Conditions - View from Leroy St.
March 20, 2018 — Slide 11Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Existing Conditions - Stair 3
March 20, 2018 — Slide 12Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Existing Conditions - Parapet and Fencing
March 20, 2018 — Slide 13Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Existing Conditions - Colonnade
March 20, 2018 — Slide 14Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Existing Conditions - Before Installation of Nets
March 20, 2018 — Slide 15Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Existing Conditions - Materials
Existing Flemish Bond:
Replacement brick to match existing.
New mortar for reconstruction and
repointing to match original.
Existing Limestone Cornice:
Existing limestone to be salvaged where
possible or matched.
Existing Stucco:
New colonnade ceiling stucco to match
existing
Existing Limestone Coping Stones:
Existing Cast Stone Coping Stones:
Existing Coping stones to be replaced
with cast stone coping stones. Color and
texture to match existing
March 20, 2018 — Slide 16Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Scope of Work
Restoration & Other Facade Work:Exterior repairs on street facade and side or rear facade.
• Stabilization of limestone elements (cornice, banding, soffi t).
• Reconstruction of parapet wall:
-Addition of expansion joints to prevent future cracking caused by expansion and contraction of new parapet.
-Raising of parapet wall at the minimally visible parapet at the secondary facade facing Leroy Street for proper attachment of safety fencing without creating a large number of waterproofi ng vulnerabilities and requiring signifi cant costly work.
• Reconstruction of stair shaft enclosure.
• Masonry crack repairs and repointing.
• Replacement of existing limestone coping stones for cast stone coping stones.
Heating, Ventilation & Air Conditioning
Equipment:
Thru-Wall HVAC equipment on rear or
side facade.
• Addition of exhaust vent to east wall
of stair tower to mitigate humidity.
High humidity levels have been
identifi ed as the culprit for steel
corrosion and brick deterioration in
the stair tower.
Window & Door Work:
Replacement of windows on street fa-
cade and rear or side facade.
• Replacement of existing aluminum
double hung windows with fi xed
aluminum windows in order to
provide fi re and impact safety rating.
Other:
Fences and Gates.
• New 10’ security fencing to replace
existing and improve life safety. As a
recreation center, the occupiable roof
requires 10’ safety fencing according
to applicable NYC Building Code
March 20, 2018 — Slide 17Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Scope of Work - 3rd Floor Plan
Masonry reconstruction
Net removal and limestone stabilization
Masonry repair
Replace existing fencing with new fencing
New fl ooring/roofi ng
Replace limestone copings with cast stone
N
Colonnade
Outdoor Area
Stair 3
Parapet and Fencing
Raised Parapet and Fencing
New fi re-rated windows at Stair 3, typ.
March 20, 2018 — Slide 18Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Scope of Work - 3rd Floor Plan
N
Colonnade Roof
Stair 3Roof
Masonry reconstruction
Net removal and limestone stabilization
Masonry repair
Replace existing fencing with new fencing
New fl ooring/roofi ng
Replace limestone copings with cast stone
March 20, 2018 — Slide 19Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Scope of Work - West Elevation
Stair 3
Masonry reconstruction
Net removal and limestone stabilization
Masonry repair
Replace existing fencing with new fencing
New fl ooring/roofi ng
Replace limestone copings with cast stone
New Exhaust Vent
Raised Parapet Wall
expansion joint at parapet wall, typ
March 20, 2018 — Slide 20Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Scope of Work - South Elevation N
Colonnade
Masonry reconstruction
Net removal and limestone stabilization (limestone to repaired and reset)
Masonry repair
Replace existing fencing with new fencing
New fl ooring/roofi ng
Replace limestone copings with cast stone
March 20, 2018 — Slide 21Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Scope of Work - East ElevationN
Colonnade
Stair 3Parapet and Fencing
Masonry reconstruction
Masonry repair
Replace existing fencing with new fencing
New fl ooring/roofi ng
Replace limestone copings with cast stone
New fi re-rated windows at Stair 3, typ.
expansion joint at parapet wall, typ
Net removal and limestone stabilization (limestone to repaired and reset)
New fi re-rated windows at Stair 3
March 20, 2018 — Slide 22Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Scope of Work - North ElevationN
Stair 3Parapet and Fencing
Masonry reconstruction
Masonry repair
Replace existing fencing with new fencing
New fl ooring/roofi ng
Replace limestone copings with cast stone
Expansion joint at parapet wall, typ
Net removal and limestone stabilization (limestone to repaired and reset)
ALIGN
Raised parapet wall
March 20, 2018 — Slide 23Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Existing view from Clarkson St Proposed view from Clarkson St
Existing wire fencing Proposed stainless steel wire fencing
Parapet FencingN
March 20, 2018 — Slide 24Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Parapet Fencing
Existing view from Leroy St Proposed view from Leroy St
Existing wire fencing Proposed stainless steel wire fencing
N
March 20, 2018 — Slide 25Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Parapet Fencing
Existing view from Leroy St Proposed view from Leroy St
Existing wire fencing Proposed stainless steel wire fencing
N
March 20, 2018 — Slide 26Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Proposed Security Fencing Section - 10’ Tall
Parapet Security Fencing
Existing Security Fencing Section - 6’ TallExisting wire fencing
CL
SS ROPE SYSTEM: 2MM ST. STL.MESH WITH 2"OPENING ON 0.5" ST.
STL. CABLE
GALV. ANGLE 0'-2" LONG WELDEDTO POST
GALV. ANGLE 0'-3" LONG FIXED TOROD AND ANGLE BY SCREW
5/8"
5/8"
HSS2X2X1/4" BEAD BLASTED SSPOST @ 4'-0" O.C. LATERAL DESIGN
FORCE FOR POST AT TOP ANDBOTTOM MESH ATTACHMENTS DUE
TO MESH PRETENSION FORCES:40LBS, VERTICAL DESIGN FORCEFOR POST AT SUPPORT DUE TO
MESH PRETENSION FORCES:600LBS.
GALV. 2L4X3X5/16" X 1'-7" LONGWELDED TO BEAD BLASTED SS POST
EXISTING ROOFING
3"
10'-0
"
10"
(6) 3/4" DIA. GALV. ASTM A307THREADED RODS W/ 8" EMBED.
LENGTH IN HILTI HIT-HY 270 ADHESIVE@ 8" O.C. INSTALL ANCHORS IN THECENTER OF THE BREAK ON EITHER
SIDE OF POST
4"
1'-7
"
GALV.19x14x3/8" PLATE WITHWELDED ON (6) 1/2" DIA. THREADS ON
EITHER SIDE OF POST FIXED BY NUT
5/8"GALV. CHANNEL 0'-2" LONG WELDED
TO BEAD BLASTED SS POST
ROD FIXED TO CHANNEL BY SCREW
2" M
IN.
cL 5/8"
8"
R 18 "
R1
8"
8"
CL
SS ROPE SYSTEM: 2MM ST. STL.MESH WITH 2"OPENING ON 0.5" ST.
STL. CABLE
GALV. ANGLE 0'-2" LONG WELDEDTO POST
GALV. ANGLE 0'-3" LONG FIXED TOROD AND ANGLE BY SCREW
5/8"
5/8"
HSS2X2X1/4" BEAD BLASTED SSPOST @ 4'-0" O.C. LATERAL DESIGN
FORCE FOR POST AT TOP ANDBOTTOM MESH ATTACHMENTS DUE
TO MESH PRETENSION FORCES:40LBS, VERTICAL DESIGN FORCEFOR POST AT SUPPORT DUE TO
MESH PRETENSION FORCES:600LBS.
GALV. 2L4X3X5/16" X 1'-7" LONGWELDED TO BEAD BLASTED SS POST
EXISTING ROOFING
3"
10'-0
"
10"
(6) 3/4" DIA. GALV. ASTM A307THREADED RODS W/ 8" EMBED.
LENGTH IN HILTI HIT-HY 270 ADHESIVE@ 8" O.C. INSTALL ANCHORS IN THECENTER OF THE BREAK ON EITHER
SIDE OF POST
4"
1'-7
"
GALV.19x14x3/8" PLATE WITHWELDED ON (6) 1/2" DIA. THREADS ON
EITHER SIDE OF POST FIXED BY NUT
5/8"GALV. CHANNEL 0'-2" LONG WELDED
TO BEAD BLASTED SS POST
ROD FIXED TO CHANNEL BY SCREW
2" M
IN.
cL 5/8"
8"
R 18 "
R1
8"
8"
March 20, 2018 — Slide 27Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Parapet Security Fencing - Mockup PhotosN
View from Clarkson St
March 20, 2018 — Slide 28Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Parapet Security Fencing - Mockup Photos
View from Leroy St
N
March 20, 2018 — Slide 29Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Parapet Security Fencing - Mockup Photos
View from Leroy St
N
March 20, 2018 — Slide 30Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Coping Stones
Existing Cast Stone Coping Stones:
Existing Coping stones to be replaced
with cast stone coping stones. Color and
texture to match existing
Existing Limestone Coping Stones:
Proposed Cast Stone Coping Stones
REPLACE EXISTING COPING STONESWITH CAST STONE COPINGS. TO
MATCH ORIGINAL IN SIZE, SHAPE, ANDTEXTURE, SECURE NEW COPING
STONE WITH STEEL DOWELS AS PERMANUFACTURER'S
RECOMMENDATIONS. ALLOW FORTHROUGH WALL FLASHING
INSTALLATION
INSTALL NEW STAINLESS STEELTHROUGH WALL FLASHING. NEW
MORTAR TO MATCH ORIGINAL
PROTECT EXISTING BRICK WALLTO REMAIN
± 1'-2"
VIF
VIF
1 12"
MAX
± 5
"1/
2"
MAX. 1" DIA. HOLE
LEAD WEATHER T CAPSET IN SEALANT
S.S.THRU-WALLFLASHING
1/2" DIA. S.S. ANCHORRODS, MIN. 2 PER STOMAX 24" O.C.
ROSEN PAPER
21 2"
March 20, 2018 — Slide 31Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Expansion Joints
Proposed location at bay end.
EXISTING BRICK MASONRY
3/8"
OPEN JOINT
NEW PARAPETWALL
EXISTINGPARAPET WALL
EXISTING BRICK MASONRY
3/8"
OPEN JOINT
NEW PARAPETWALL
EXISTINGPARAPET WALL
LEAD WEATHER"T" CAP BEYOND
FACE OF 1/2 CUTSALVAGED BRICK
BEYOND
EXP. JOINTS(SEALANT)
TRIM EXISTINGFOR 3/8" JOINT
Expansion joint at inner and outer wythe Thru-wall expansion joint
Expansion joint elevation
LEAD WEATHER"T" CAP BEYOND
FACE OF 1/2 CUTSALVAGED BRICK
BEYOND
EXP. JOINTS(SEALANT)
TRIM EXISTINGFOR 3/8" JOINT
March 20, 2018 — Slide 32Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Stair 3 Windows
Existing Windows (Double Hung) Proposed Fire-rated Windows (Fixed with horizontal mullion)
Existing window color
Proposed window color to
match existing.
March 20, 2018 — Slide 33Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Stair 3 Windows - Plan
NEW SS. HAND RAILS, TYP
NEW STEEL STRINGERS,LANDINGS, TREADS AND
RISERS, TYP
NEW FIRE-RATED DOOR WITHKERF DOOR FRAME
NEW MASONRY ENCLOSURE
PROVIDE STEEL PLATESAT (3) SIDES OF STAIR
TOWER ON LIMESTONEBANDING. (3) EACH SIDE
EVENLY SPACED. SEEA-503 DETL. 5
DW
A
A
410
"TY
P
10"
TYP
1'-0
"TY
P
1'-0"TYP
11'-5"12
'-1"
4'-2" 3'-312" 3'-111
2"4'
-07 8"
4'-1
3 4"3'
-103 8"
3A-404
4A-404
A-4043
7'-3"
10'-2"
13'-6 1/2"
NEW SS. HAND RAILS, TYP
NEW STEEL STRINGERS,LANDINGS, TREADS AND
RISERS, TYP
NEW FIRE-RATED DOOR WITHKERF DOOR FRAME
NEW MASONRY ENCLOSURE
PROVIDE STEEL PLATESAT (3) SIDES OF STAIR
TOWER ON LIMESTONEBANDING. (3) EACH SIDE
EVENLY SPACED. SEEA-503 DETL. 5
DW
A
A
410
"TY
P
10"
TYP
1'-0
"TY
P
1'-0"TYP
11'-5"12
'-1"
4'-2" 3'-312" 3'-111
2"4'
-07 8"
4'-1
3 4"3'
-103 8"
3A-404
4A-404
A-4043
7'-3"
10'-2"
13'-6 1/2"
New fi re-rated windows at Stair 3, typ.
March 20, 2018 — Slide 34Reconstruction of the Tony Dapolito Rec. Center - LPC Presentation
Stair 3 Windows - Details
Existing Window (Double Hung) Section Proposed Fire-rated Window (Fixed with mullion) Section
Existing Window (Double Hung) Plan Proposed Fire-rated Window (Fixed with mullion) Plan