The project

September19, 2019| Miran Kavrečič, HSE

https://www.osmose-h2020.eu/

This project has received funding from the European Union’s Horizon 2020 research and innovation programmeunder grant agreement n° 773406.

Page 2: The project · OSMOSE PROJECT. 55 OSMOSE PROJECT. 66 The consortium ... Title of the presentation. 15. Main. steps. of the market. WP6: THE IDEA. Title of the presentation. 16. 1/3

22

HOST

This year is the 100th anniversary of UL

Founded in July 1919

Technical faculty was one of the 5 faculties

Milan Vidmar was one of the founders

Institue Milan Vidmar

Milan Vidmar interests: power engineering, chess, poetry… flexibility?

Page 3: The project · OSMOSE PROJECT. 55 OSMOSE PROJECT. 66 The consortium ... Title of the presentation. 15. Main. steps. of the market. WP6: THE IDEA. Title of the presentation. 16. 1/3

33

OSMOSE PROJECT

Optimal System-mix of Flexibility Solutions for Europen electricity

Page 4: The project · OSMOSE PROJECT. 55 OSMOSE PROJECT. 66 The consortium ... Title of the presentation. 15. Main. steps. of the market. WP6: THE IDEA. Title of the presentation. 16. 1/3

44

✓9 WPs

✓Of which 4 demo TSO led WP

Objective 1: forecast the optimal mix of flexibilty at pan-European system level

Objective 2: Propose improvements of existing market mechanisms and regulatory framework

Objective 3: Assess and increase the efficiency of flexibility solutions

OSMOSE PROJECT

Page 5: The project · OSMOSE PROJECT. 55 OSMOSE PROJECT. 66 The consortium ... Title of the presentation. 15. Main. steps. of the market. WP6: THE IDEA. Title of the presentation. 16. 1/3

55

OSMOSE PROJECT

Page 6: The project · OSMOSE PROJECT. 55 OSMOSE PROJECT. 66 The consortium ... Title of the presentation. 15. Main. steps. of the market. WP6: THE IDEA. Title of the presentation. 16. 1/3

66

The consortium

✓EU Funded (Grant: 21,8 M€)

✓33 partners

✓Leaders: RTE, CEA, ELES, REE,

TERNA, TUB

✓2018 - 2021

OSMOSE PROJECT

Page 7: The project · OSMOSE PROJECT. 55 OSMOSE PROJECT. 66 The consortium ... Title of the presentation. 15. Main. steps. of the market. WP6: THE IDEA. Title of the presentation. 16. 1/3

77

Presenters

OSMOSE PROJECT

WP2 WP5 WP6WP6

Page 8: The project · OSMOSE PROJECT. 55 OSMOSE PROJECT. 66 The consortium ... Title of the presentation. 15. Main. steps. of the market. WP6: THE IDEA. Title of the presentation. 16. 1/3

88

Takeaways

Who? 33 partners from across the EU

What? Using currently available tech in new way

When? 2018-2021

Where? EU

Why? To improve flexibility of the grid to enable more RES integration

How? By testing the concepts in 4 demos

OSMOSE PROJECT

Channelfutures.com

Page 9: The project · OSMOSE PROJECT. 55 OSMOSE PROJECT. 66 The consortium ... Title of the presentation. 15. Main. steps. of the market. WP6: THE IDEA. Title of the presentation. 16. 1/3

9

WP6: Near real-time cross-border energy market

September19, 2019| Miran Kavrečič, HSE, Gregor Goričar, ELES

https://www.osmose-h2020.eu/

This project has received funding from the European Union’s Horizon 2020 research and innovation programmeunder grant agreement n° 773406.

Page 11: The project · OSMOSE PROJECT. 55 OSMOSE PROJECT. 66 The consortium ... Title of the presentation. 15. Main. steps. of the market. WP6: THE IDEA. Title of the presentation. 16. 1/3

11

Focus of the teamWP6: THE IDEA

Title of the presentation

Extend trading

timeframe over

borders

Efficiently increase

energy exchange

over borders

Increase value of

conventional

flexible units

Currently limited to

1 h before delivery

on 1 h resolution

CBTC Currently

defined D-2 before

delivery

Flexibile units are

currently – more or

less, limited to

ancillary services

only to add value

to the flexibilty

capability

Page 12: The project · OSMOSE PROJECT. 55 OSMOSE PROJECT. 66 The consortium ... Title of the presentation. 15. Main. steps. of the market. WP6: THE IDEA. Title of the presentation. 16. 1/3

12

Focus of the teamWP6: THE IDEA

Title of the presentation

Extend trading

timeframe over

borders

Efficiently increase

energy exchange

over borders

Increase value of

conventional

flexible units

More flexibility for

intermittent

sources

More opportunities

for last-minutes

changes

Higer social

wellfare

Page 13: The project · OSMOSE PROJECT. 55 OSMOSE PROJECT. 66 The consortium ... Title of the presentation. 15. Main. steps. of the market. WP6: THE IDEA. Title of the presentation. 16. 1/3

13

Increased social-wellfare

More exchanged energy

Added value for flexible power units

Better usage of gird (Congestion management & Flexibility markets => OSMOSE)

Cross-border!

What to expect?WP6: KEEP IN MIND

01

03

02

04

Title of the presentation

05

Page 14: The project · OSMOSE PROJECT. 55 OSMOSE PROJECT. 66 The consortium ... Title of the presentation. 15. Main. steps. of the market. WP6: THE IDEA. Title of the presentation. 16. 1/3

14

Main steps of the market

Flexibility providers (FP), after

intrday GCT, optimize their

portfolio and offer newly

available flexibility which creates

new opportunity for them.

WP6: THE IDEA

FlexEnergy Bid (FEB) from FP

and a snapshot from the

transmission system is used to

perfrom an optimal power flow

(OPF) simulation

An OPF is calculated and as

result,certain FEB might be

activated and executed

respecting network constraints

and security assessments

FEBs are executed in a closed-

loop manner so in case of

annomalies FEB can execution

can be stopped

Title of the presentation

Page 15: The project · OSMOSE PROJECT. 55 OSMOSE PROJECT. 66 The consortium ... Title of the presentation. 15. Main. steps. of the market. WP6: THE IDEA. Title of the presentation. 16. 1/3

15

Main steps of the marketWP6: THE IDEA

Title of the presentation

Page 16: The project · OSMOSE PROJECT. 55 OSMOSE PROJECT. 66 The consortium ... Title of the presentation. 15. Main. steps. of the market. WP6: THE IDEA. Title of the presentation. 16. 1/3

16

1/3 Real time assessment of CBTC

Transition from weekly planning of NTC to real-time

assesment

Provides 5 minut grid snapshots

FlexEnergy Bids activation based on optimal power

flow

Activation in order to support the grid

Challenges: snapshot creation, bid execution

WP6: MAIN PILLARS

Title of the presentation

FlexBorder ☺

Page 17: The project · OSMOSE PROJECT. 55 OSMOSE PROJECT. 66 The consortium ... Title of the presentation. 15. Main. steps. of the market. WP6: THE IDEA. Title of the presentation. 16. 1/3

17

2/3 FlexEnergy market platform

Close-loop operation

Optimal power flow based on grid snapshots and

FlexEnergy Bids

Bid activation and execution

Challenges: optimization speed, communication

WP6: MAIN PILLARS

Title of the presentation

SIIT

Page 18: The project · OSMOSE PROJECT. 55 OSMOSE PROJECT. 66 The consortium ... Title of the presentation. 15. Main. steps. of the market. WP6: THE IDEA. Title of the presentation. 16. 1/3

18

3/3 FlexEnergy management platform

Used by FlexEnergy providers – a tool, to develop

Enables creation of FlexEnergy Bids

Improve efficiency of commercial schedule realization

… including realization of FlexEnergy Bids

Input parameters from SCADA

Challenges: real-time measurments, efficient model of portfolio, real-time assessment of

flexibility

WP6: MAIN PILLARS

Title of the presentation

Page 19: The project · OSMOSE PROJECT. 55 OSMOSE PROJECT. 66 The consortium ... Title of the presentation. 15. Main. steps. of the market. WP6: THE IDEA. Title of the presentation. 16. 1/3

19

FlexEnergy bid

It‘s a inovation

Open-bid principle

Execution can be stopped

Grid position

Portfolio bid with GSK

Gradient limit

Also block-bid properties

WP6: FLEXENERGY BID

Title of the presentation

Page 20: The project · OSMOSE PROJECT. 55 OSMOSE PROJECT. 66 The consortium ... Title of the presentation. 15. Main. steps. of the market. WP6: THE IDEA. Title of the presentation. 16. 1/3

20

Market driven

This market is opportunity and not imbalance driven. It gives extra

opportunities to flexible units which are not used in acillary services. This

gives more flexibility to support intermittent sources. Only aFRR qualified

units.

Near-real time and cross-border

The market is a near-real time and cross-border. This extends the

opportunitiy to trade beyond current cross-border intraday GTC.

What to remember?WP6: RECAP

Power flow optimization

FlexEnergy Bids are executed in a way that the power flows are optimal

given the current grid status. This enables extra energy exchange over the

borders.

Close-loop operation

TSO have the control over the bid execution – if a problem occours during

the execution, bids can be set to 0 without any consequence for all the

parties involved.

01 03

0204

Title of the presentation

Page 21: The project · OSMOSE PROJECT. 55 OSMOSE PROJECT. 66 The consortium ... Title of the presentation. 15. Main. steps. of the market. WP6: THE IDEA. Title of the presentation. 16. 1/3

21

ThanksWP6

Title of the presentation

STAY FLEXIBLEALSO OVER THE BORDER