the no limit concept
DESCRIPTION
Presentation by Albert Keizer (No Limit Ships)TRANSCRIPT
![Page 1: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/1.jpg)
HSB workshop
![Page 2: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/2.jpg)
No Limit is a concept
![Page 3: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/3.jpg)
Geo-plus Geo Motion
![Page 4: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/4.jpg)
Jan De Nul DN 75
![Page 5: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/5.jpg)
MMT Sweden Seabeam
![Page 6: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/6.jpg)
Bravehaert Shipping FreedomUsed by Port of Rotterdam
![Page 7: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/7.jpg)
Government Qatar Al Massah
![Page 8: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/8.jpg)
MRTS Archangelsk Гладиуc
![Page 9: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/9.jpg)
GEO Plus Geo Connection
![Page 10: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/10.jpg)
Under construction5 x pilot vessels ass. Barkmeijer
![Page 11: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/11.jpg)
No Limit 24,40 Survey vessel
![Page 12: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/12.jpg)
NO LIMIT CONCEPT
• Seaworthiness• Low draught• Safety• Comfortable• Reliability• Representative• Developed for hydrographic survey
![Page 13: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/13.jpg)
THE MARKET
• Initially recreational market for ocean-going vessels
• Further expansion to the professional market
• Choosing specialisation in hydrography
![Page 14: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/14.jpg)
A MARKET VIEW
• Equipment options are increasing• People
effective and comfortable workstation• Vessels conditions for the people and equipment
![Page 15: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/15.jpg)
REQUIREMENTS• Dedicated survey boats Cost efficiency
More deployment daysLow operating costs of the boatLess personnel costsLow maintenance costs
High qualityInteraction
boat/equipment/people
![Page 16: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/16.jpg)
Research into technical options
• Boat movements• Vibrations• Air bubbles• Speed• Reliability• Ambient circumstances
![Page 17: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/17.jpg)
SOLUTIONS
• Adapting the dimensions
• Single-role instead of Multi-role
• Higher transit and survey speeds
• Use of a concept
![Page 18: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/18.jpg)
TECHNICAL DETAILING
• The use of monohull boats• Reliable on-board installation• Protected installation of sensors• Built-in sensors (fixed mount)• Improvement of comfort and working
conditions
![Page 19: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/19.jpg)
Dubai service on the beach
![Page 20: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/20.jpg)
![Page 21: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/21.jpg)
![Page 22: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/22.jpg)
![Page 23: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/23.jpg)
![Page 24: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/24.jpg)
![Page 25: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/25.jpg)
![Page 26: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/26.jpg)
![Page 27: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/27.jpg)
![Page 28: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/28.jpg)
![Page 29: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/29.jpg)
![Page 30: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/30.jpg)
Wheelhouse 1940
![Page 31: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/31.jpg)
Surveyors desk 1940
![Page 32: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/32.jpg)
Accommodation 1940
![Page 33: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/33.jpg)
Accommodation 1940
![Page 34: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/34.jpg)
No limit Survey vessels
• Purpose built Survey vessel• Hull Integrated Sensors, preventing from
damage • Deep and Shallow waters• High sea and sheltered water• Accommodation for overnight stay at sea
![Page 35: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/35.jpg)
Optimal in hull integrated sensors
Advantages:
• Preventing from damage• Reliable data at speed upto 20 knots• Wide soundings. Five times waterdepth• Soundings at least upto 2 meters waveheight
![Page 36: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/36.jpg)
Various• Lloyds Register certification• Proven concept• Recognised for their capabilities• High customer satisfaction, repeat orders• Presentable• Spacious wheelhouse with large working area
for surveyors• Dedicated survey mast (separated from ships
navigation mast)
![Page 37: The No Limit Concept](https://reader038.vdocuments.us/reader038/viewer/2022103013/5451614eb1af9f6b1a8b4a59/html5/thumbnails/37.jpg)