the mobility crisis strategies of rio de janeiro to … · green - 2,000m tod – pilot project ......

16
SECRETARIA DE TRANSPORTES SECRETARIA DE TRANSPORTES Delmo Pinho Subsecretary of Transport Tokyo – May/2016 THE MOBILITY CRISIS STRATEGIES OF RIO DE JANEIRO TO SOLVE IT

Upload: others

Post on 19-Feb-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: THE MOBILITY CRISIS STRATEGIES OF RIO DE JANEIRO TO … · Green - 2,000m TOD – Pilot Project ... HIGH PERFORMANCE BELT. SECRETARIA DE TRANSPORTES More than US$ 4,5 billion in investiments

SECRETARIADE TRANSPORTESSECRETARIADE TRANSPORTES

Delmo Pinho

Subsecretary of Transport

Tokyo – May/2016

THE MOBILITY CRISIS

STRATEGIES OF RIO DE JANEIRO TO SOLVE IT

Page 2: THE MOBILITY CRISIS STRATEGIES OF RIO DE JANEIRO TO … · Green - 2,000m TOD – Pilot Project ... HIGH PERFORMANCE BELT. SECRETARIA DE TRANSPORTES More than US$ 4,5 billion in investiments

SECRETARIADE TRANSPORTES RIO DE JANEIRO STATE

Source: IBGE/IMF

Location: southeast of Brazil (57% of the GNP);

Area: 43.910 km² (0,5% of the area of the country)

Population: 15,4 million (8,4% of the country total)

GNP: US$ 185 Billion(11,2% of Brazil´s GNP)

Page 3: THE MOBILITY CRISIS STRATEGIES OF RIO DE JANEIRO TO … · Green - 2,000m TOD – Pilot Project ... HIGH PERFORMANCE BELT. SECRETARIA DE TRANSPORTES More than US$ 4,5 billion in investiments

SECRETARIADE TRANSPORTES

Source: PDTU 2012

21 municipalities4.700 km²

11,9 million people

22,5 million trips /day

15,4 million motorized trips /day11 million in Public Transport

75% of thestate population

RIO METROPOLITAN REGION (2012)

Page 4: THE MOBILITY CRISIS STRATEGIES OF RIO DE JANEIRO TO … · Green - 2,000m TOD – Pilot Project ... HIGH PERFORMANCE BELT. SECRETARIA DE TRANSPORTES More than US$ 4,5 billion in investiments

Metropolitan Region - The growth of the urban area(Between 1980 and 2010, it expanded an average of 60

km²/year)

Fonte: PDTU 2003 Fonte: ZEE/RJ

1975 2007

Fonte: projeção Firjan

2025

60km x 45km = 2.700 km2

2013

Page 5: THE MOBILITY CRISIS STRATEGIES OF RIO DE JANEIRO TO … · Green - 2,000m TOD – Pilot Project ... HIGH PERFORMANCE BELT. SECRETARIA DE TRANSPORTES More than US$ 4,5 billion in investiments

SECRETARIADE TRANSPORTES

Red - 425m Yellow - 850m Blue - 1,700mGreen - 2,000m

TOD – Pilot Project Queimados / RJ

Page 6: THE MOBILITY CRISIS STRATEGIES OF RIO DE JANEIRO TO … · Green - 2,000m TOD – Pilot Project ... HIGH PERFORMANCE BELT. SECRETARIA DE TRANSPORTES More than US$ 4,5 billion in investiments

SECRETARIADE TRANSPORTES

Concessionaire

Strategic Project ofImmediate Surroundings

Densification andRequalification. Mixed

land use

Area of Influence.

TOD Transit Oriented Development

Page 7: THE MOBILITY CRISIS STRATEGIES OF RIO DE JANEIRO TO … · Green - 2,000m TOD – Pilot Project ... HIGH PERFORMANCE BELT. SECRETARIA DE TRANSPORTES More than US$ 4,5 billion in investiments

SECRETARIADE TRANSPORTES

Vision

According to the experience of the state, investingin intramural infrastructure is not enough.

Thus, the goal is to further strengthen the TODphilosophy, as a part of public policies related tometropolitan planning.

Smaller scale TOD projects can have a significant impact for the metropolitan region.

TOD – Pilot Project

Page 8: THE MOBILITY CRISIS STRATEGIES OF RIO DE JANEIRO TO … · Green - 2,000m TOD – Pilot Project ... HIGH PERFORMANCE BELT. SECRETARIA DE TRANSPORTES More than US$ 4,5 billion in investiments

SECRETARIADE TRANSPORTES

Rio - AGENDA OF INTERNATIONAL EVENTS

2011 – World Military Games/ Rock in Rio2012 – UN / Rio+202013 – World Youth Day (Catholic Church)

– FIFA Confederations Cup2014 – FIFA World Cup2015 – Rio 450 year anniversary - Copa América2016 – Olympic Games

Page 9: THE MOBILITY CRISIS STRATEGIES OF RIO DE JANEIRO TO … · Green - 2,000m TOD – Pilot Project ... HIGH PERFORMANCE BELT. SECRETARIA DE TRANSPORTES More than US$ 4,5 billion in investiments

SECRETARIADE TRANSPORTES

HIGH PERFORMANCE BELT

Page 10: THE MOBILITY CRISIS STRATEGIES OF RIO DE JANEIRO TO … · Green - 2,000m TOD – Pilot Project ... HIGH PERFORMANCE BELT. SECRETARIA DE TRANSPORTES More than US$ 4,5 billion in investiments

SECRETARIADE TRANSPORTES

More than US$ 4,5 billion in investiments

Construction of 4 BRTs and Line 4 ofthe metro

Modernization of themetro-rail system

Refurbishing of 89 stations andpurchase of 520 new rail cars, refurbished ofothers and 35 newmetro trais

PUBLIC TRANSPORT 2007/2016

“HIGH PERFORMANCE BELT”

Page 11: THE MOBILITY CRISIS STRATEGIES OF RIO DE JANEIRO TO … · Green - 2,000m TOD – Pilot Project ... HIGH PERFORMANCE BELT. SECRETARIA DE TRANSPORTES More than US$ 4,5 billion in investiments

SECRETARIADE TRANSPORTES

BRT SYSTEM

Transoeste

Transcarioca BRT Av. Brasil

Transolímpica

Page 12: THE MOBILITY CRISIS STRATEGIES OF RIO DE JANEIRO TO … · Green - 2,000m TOD – Pilot Project ... HIGH PERFORMANCE BELT. SECRETARIA DE TRANSPORTES More than US$ 4,5 billion in investiments

SECRETARIADE TRANSPORTES PUBLIC TRANSPORT IN RIO

GOLS FOR 2016 / 2018

Trains

1,0 milliontrips/day

Metro - Lines1+2

1,1 milliontrips/day

Ferries

120.000 trips/day

BRS

500.000 trips /day

BRTs

800.000 trips /day

Metro – Line 4300.000 trips/day

35% of thetrips in Public

Transportof goodquality

made bymediun and

highcapacitysystens

Page 13: THE MOBILITY CRISIS STRATEGIES OF RIO DE JANEIRO TO … · Green - 2,000m TOD – Pilot Project ... HIGH PERFORMANCE BELT. SECRETARIA DE TRANSPORTES More than US$ 4,5 billion in investiments

LIGHT RAIL – DEPLOYMENT IN 3 STEPS

berths in operation

Page 14: THE MOBILITY CRISIS STRATEGIES OF RIO DE JANEIRO TO … · Green - 2,000m TOD – Pilot Project ... HIGH PERFORMANCE BELT. SECRETARIA DE TRANSPORTES More than US$ 4,5 billion in investiments

SECRETARIADE TRANSPORTES

Avenida Rio Branco

Page 15: THE MOBILITY CRISIS STRATEGIES OF RIO DE JANEIRO TO … · Green - 2,000m TOD – Pilot Project ... HIGH PERFORMANCE BELT. SECRETARIA DE TRANSPORTES More than US$ 4,5 billion in investiments

SECRETARIADE TRANSPORTES

Avenida Rio Branco

Page 16: THE MOBILITY CRISIS STRATEGIES OF RIO DE JANEIRO TO … · Green - 2,000m TOD – Pilot Project ... HIGH PERFORMANCE BELT. SECRETARIA DE TRANSPORTES More than US$ 4,5 billion in investiments

SECRETARIADE TRANSPORTES

Thank you!