SECRETARIADE TRANSPORTESSECRETARIADE TRANSPORTES
Delmo Pinho
Subsecretary of Transport
Tokyo – May/2016
THE MOBILITY CRISIS
STRATEGIES OF RIO DE JANEIRO TO SOLVE IT
SECRETARIADE TRANSPORTES RIO DE JANEIRO STATE
Source: IBGE/IMF
Location: southeast of Brazil (57% of the GNP);
Area: 43.910 km² (0,5% of the area of the country)
Population: 15,4 million (8,4% of the country total)
GNP: US$ 185 Billion(11,2% of Brazil´s GNP)
SECRETARIADE TRANSPORTES
Source: PDTU 2012
21 municipalities4.700 km²
11,9 million people
22,5 million trips /day
15,4 million motorized trips /day11 million in Public Transport
75% of thestate population
RIO METROPOLITAN REGION (2012)
Metropolitan Region - The growth of the urban area(Between 1980 and 2010, it expanded an average of 60
km²/year)
Fonte: PDTU 2003 Fonte: ZEE/RJ
1975 2007
Fonte: projeção Firjan
2025
60km x 45km = 2.700 km2
2013
SECRETARIADE TRANSPORTES
Red - 425m Yellow - 850m Blue - 1,700mGreen - 2,000m
TOD – Pilot Project Queimados / RJ
SECRETARIADE TRANSPORTES
Concessionaire
Strategic Project ofImmediate Surroundings
Densification andRequalification. Mixed
land use
Area of Influence.
TOD Transit Oriented Development
SECRETARIADE TRANSPORTES
Vision
According to the experience of the state, investingin intramural infrastructure is not enough.
Thus, the goal is to further strengthen the TODphilosophy, as a part of public policies related tometropolitan planning.
Smaller scale TOD projects can have a significant impact for the metropolitan region.
TOD – Pilot Project
SECRETARIADE TRANSPORTES
Rio - AGENDA OF INTERNATIONAL EVENTS
2011 – World Military Games/ Rock in Rio2012 – UN / Rio+202013 – World Youth Day (Catholic Church)
– FIFA Confederations Cup2014 – FIFA World Cup2015 – Rio 450 year anniversary - Copa América2016 – Olympic Games
SECRETARIADE TRANSPORTES
HIGH PERFORMANCE BELT
SECRETARIADE TRANSPORTES
More than US$ 4,5 billion in investiments
Construction of 4 BRTs and Line 4 ofthe metro
Modernization of themetro-rail system
Refurbishing of 89 stations andpurchase of 520 new rail cars, refurbished ofothers and 35 newmetro trais
PUBLIC TRANSPORT 2007/2016
“HIGH PERFORMANCE BELT”
SECRETARIADE TRANSPORTES
BRT SYSTEM
Transoeste
Transcarioca BRT Av. Brasil
Transolímpica
SECRETARIADE TRANSPORTES PUBLIC TRANSPORT IN RIO
GOLS FOR 2016 / 2018
Trains
1,0 milliontrips/day
Metro - Lines1+2
1,1 milliontrips/day
Ferries
120.000 trips/day
BRS
500.000 trips /day
BRTs
800.000 trips /day
Metro – Line 4300.000 trips/day
35% of thetrips in Public
Transportof goodquality
made bymediun and
highcapacitysystens
LIGHT RAIL – DEPLOYMENT IN 3 STEPS
berths in operation
SECRETARIADE TRANSPORTES
Avenida Rio Branco
SECRETARIADE TRANSPORTES
Avenida Rio Branco
SECRETARIADE TRANSPORTES
Thank you!