the little room project maryfe culiat joseph hernandez jesse kanda mary liang
Post on 19-Dec-2015
214 views
TRANSCRIPT
![Page 1: The Little Room Project Maryfe Culiat Joseph Hernandez Jesse Kanda Mary Liang](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d355503460f94a0d55f/html5/thumbnails/1.jpg)
The Little Room ProjectThe Little Room Project
Maryfe CuliatJoseph Hernandez
Jesse KandaMary Liang
![Page 2: The Little Room Project Maryfe Culiat Joseph Hernandez Jesse Kanda Mary Liang](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d355503460f94a0d55f/html5/thumbnails/2.jpg)
![Page 3: The Little Room Project Maryfe Culiat Joseph Hernandez Jesse Kanda Mary Liang](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d355503460f94a0d55f/html5/thumbnails/3.jpg)
United Cerebral Palsy Assoc. “Little Room”
“The purpose of the “Little Room” is to facilitate the blind child’s achievement of spatial relations and reaching behavior, but it can be of considerable help for sighted low-functioning children.”
Left: Short version
Right: Tall version
• The Little Room reduces outside environmental sounds• Objects with sensory simulation are hung through a plexiglass ceiling• Child receives feedback with little movement
![Page 4: The Little Room Project Maryfe Culiat Joseph Hernandez Jesse Kanda Mary Liang](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d355503460f94a0d55f/html5/thumbnails/4.jpg)
![Page 5: The Little Room Project Maryfe Culiat Joseph Hernandez Jesse Kanda Mary Liang](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d355503460f94a0d55f/html5/thumbnails/5.jpg)
Project Overview
• Our current objectives
1. Place a volume control on a floor piano in order to mute the sound.
2. Modify strings of lights with an on/off (flat) switch and light intensity switch (0-10 dial).
3. Add a light intensity control for a flashlight (0-10 dial).
4. Find and test alternative materials to replace “Little Room” walls.
![Page 6: The Little Room Project Maryfe Culiat Joseph Hernandez Jesse Kanda Mary Liang](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d355503460f94a0d55f/html5/thumbnails/6.jpg)
![Page 7: The Little Room Project Maryfe Culiat Joseph Hernandez Jesse Kanda Mary Liang](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d355503460f94a0d55f/html5/thumbnails/7.jpg)
Approach
• Roles– Maryfe: Lead Contact – Joseph: Project Manager– Jesse: Project Financer– Mary: Project Helper
![Page 8: The Little Room Project Maryfe Culiat Joseph Hernandez Jesse Kanda Mary Liang](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d355503460f94a0d55f/html5/thumbnails/8.jpg)
![Page 9: The Little Room Project Maryfe Culiat Joseph Hernandez Jesse Kanda Mary Liang](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d355503460f94a0d55f/html5/thumbnails/9.jpg)
Goals
• Complete all tasks as requested by UCP
• If requested, construct a fully functional “Little Room”
![Page 10: The Little Room Project Maryfe Culiat Joseph Hernandez Jesse Kanda Mary Liang](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d355503460f94a0d55f/html5/thumbnails/10.jpg)
![Page 11: The Little Room Project Maryfe Culiat Joseph Hernandez Jesse Kanda Mary Liang](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d355503460f94a0d55f/html5/thumbnails/11.jpg)
Proposed Schedule
Gantt Chart – The Little Room Project
Task Start Date Duration
2006
09 10 11 12
Install volume control on piano 2006-09-05 3 weeks
Modify lights for on/off & intensity switches 2006-09-26 2 weeks
Modify flashlights for intensity control 2006-10-06 1 week
Test alternative materials to replace walls 2006-10-13 ?
![Page 12: The Little Room Project Maryfe Culiat Joseph Hernandez Jesse Kanda Mary Liang](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d355503460f94a0d55f/html5/thumbnails/12.jpg)
![Page 13: The Little Room Project Maryfe Culiat Joseph Hernandez Jesse Kanda Mary Liang](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d355503460f94a0d55f/html5/thumbnails/13.jpg)
Potential Problems
• Defective Parts
• I/O interface considerations (D/A, A/D)
• Hazardous objects to child
• Project and Time Management
![Page 14: The Little Room Project Maryfe Culiat Joseph Hernandez Jesse Kanda Mary Liang](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d355503460f94a0d55f/html5/thumbnails/14.jpg)
![Page 15: The Little Room Project Maryfe Culiat Joseph Hernandez Jesse Kanda Mary Liang](https://reader036.vdocuments.us/reader036/viewer/2022062714/56649d355503460f94a0d55f/html5/thumbnails/15.jpg)
What We Hope to Gain
• Understanding of the real demands of an engineering project.
• Using Teamwork effectively.
• Ability to manage our resources and time effectively.
• Ability to apply our classroom knowledge to our project.