the lawrence group documentation
DESCRIPTION
A brief summary of a 7-month architecture internship through the University of Kansas School of Architecture with The Lawrence Group Architects.TRANSCRIPT
University of KansasARCH 803Health and Wellness Internship
s a m a n t h a a u e r health + wellness internship saint louis, missouri 2012
Contents INTO + OVERVIEW
TIME LINE
PROJECTS
REFLECTION
0406
20
SD DD CA CONSTRUCTION
NAZARETH
SEMO
ST. PIUS STARBUCKS
06
LG
introduction + overviewHelping Our Clients Realize Their Dreams Our mission has remained
consistent over the past quarter century
ST. LOUIS NEW YORK PHILADELPHIACAROLINAS TEXAS
THE LAWRENCE GROUPSMULTI-DISCIPLINARY
architectureCORPORTATEEDUCATIONHEALTHCAREHOSPITALITY MEDIAMIXED USE RESIDENTIAL RETAIL SENIOR LIVING SUSTAINABLE DESIGN
interiorsCOLORSNICHE
LANDSCAPELANDSCAPE PLANNING URBAN DESIGN
PLANNING BLOCK CODE REGION NEIGHBORHOOD
DEVELOPMENT
CONSTRUCTION
GRAPHICS
04
INTERN HAPPY HOUR
LG SOFTBALL TEAM
E X P E R I E N C E :
COLLABORATION VARIOUS BUILDING TYPESSITE VISITS SOCIAL ACTIVITIES PROJECT ARCHITECTOFFICE MANAGEMENTMATERIAL REVIEW CONSULANT COORDINATIONSHOP DRAWINGS
SCHEMATIC DESIGNS DESIGN DEVELOPMENTCONSTRUCTION ADMIN.
06
may jun jul aug
NAZARETH SEMO
DRURY
DANCE STL
may jun jul aug
08
sept oct nov dec
ST PIUS STARBUCKS
N. GRAND APTS.
NAZARETH LIVING CENTER INDENDENDENT SENIOR LIVING
renderings by andrey Mishev
Client: nazareth living centerLocation: 2 nazareth lane saint louis, missouri 63129
context: residential neighborhood senior living complex: assited living, skilled nursing
10
brief: I have been involved with this project since may 2011. in august 2012, I was given project architect responsibilities as a result of an associate’s maternity leave during the construction administration phase. i attended meetings with the owner and other members of the design team.
program: 50 living units parking garagelibrary, card room, meditation room, fitness, exercise, doctors office, kitchen, dining, family party room
c o n s t r u c t i o n o b s e r v a t i o n
12
marketing plans
6'-4"
6'-4"
105R
EC
YC
L'GTR
AS
H/
S1-1
STA
IRN
OR
TH
S2-1
STA
IRS
OU
TH
133C
LOS
ET
TEC
H
132JA
NITO
R
102C
OR
RID
OR
A101
UN
IT
A103
UN
IT
A105
UN
IT
E-1
ELE
V137
ELE
C
121LO
UN
GE
122C
OR
RID
OR
123C
OR
RID
OR
130C
OR
RID
OR
131E
LEC
ME
CH
/
134C
OR
RID
OR
RO
OF
BE
LOW
RO
OF
BE
LOW
A111
UN
ITA
DA
A117
UN
IT
A119
UN
IT
A118
UN
IT
A112
UN
ITA
DA
C116
UN
IT
C114
UN
IT
C115
UN
IT
C113
UN
IT
S1-1A
S2-1
105A
130
135
131
132
133
135R
EC
YC
L'GTR
AS
H/
101LO
BB
YE
LEV
137
138R
OO
MC
AR
D138
A123
UN
ITA
121U
NIT
136C
OR
RID
OR
129R
OO
MM
ED
IA
127S
TOR
EG
EN
ER
AL
128S
TOR
AG
E
120C
ON
FER
EN
CE
FAM
ILY P
AR
TY/
125JA
NITO
R
124R
ES
TRM
.P
UB
LIC
126R
ES
TRM
.P
UB
LIC
106B
AR
107D
ININ
G R
OO
M
108B
EV
ER
AG
E
109C
OO
K
111P
RE
P
119FR
EE
ZER
118C
OO
LER
117H
ALL
116R
ES
TRM
.S
TAFF
115LIN
EN
S
114JA
NITO
R
113O
FFICE
112S
TOR
AG
ED
RY
110R
OO
MD
ISH
S1-1B
104102
109 113
114
116
117
120A
122
123
124126
125
127
128
129A
4'-6" HIG
H W
ALL
107A
1A
5.02
44 seats
UP
DN
UPD
N
120B
RO
OF
BE
LOW
129B
107B
9a
A5.01
117A
117AM
EC
H.
72"
48"
48"
1A
5.03
105B
2A
7.03
2A
7.02
1A
7.04
3A
5.02
6'-0"
TYP
.
8'-11 1/2"12'-11 1/4"15'-0 7/8"15'-0 7/8"15'-0 7/8"13'-1 7/8"13'-1 7/8"14'-2 5/8"16'-1 3/4"27'-10 1/4"
18'-11 7/8"
3'-2 1/8"
3'-2"4'-7 5/8"
18'-10 1/2"
13'-5 7/8"3'-0 5/8"
12'-2 1/2"
14'-10 7/8"13'-1 7/8"35'-2"12'-8 1/4"10'-9 1/8" 12'-4 5/8"13'-1 7/8"15'-0 7/8"15'-0 7/8"13'-6 1/4"
6'-6"
18'-1 1/4" 15'-6"
6 3/4"
10'-0 3/4" 13'-1 7/8"
2'-4"
23'-1 3/4" 12'-8 1/4" 35'-2" 13'-1 7/8" 18'-8 5/8"
9'-0 3/4"
3'-3 1/4" 21'-10 3/4"
20'-10 3/4"
82'-2 1/2"
℄℄
℄
℄
℄℄
4"
℄6'-6"
℄
℄
4"
℄ ℄
25'-9 1/4"
8'-1 1/8"
℄
15'-6 3/4"5'-0 5/8"℄
15'-0 7/8"15'-0 7/8"
13'-5 3/4"
SIM
.
104C
OR
RID
OR
6'-5 1/4"
6'-0"
TYP.
8'-3 1/4"
1'-1 5/8"
3'-7 1/2"
4'-7 3/4"
℄
℄℄
3'-3 5/8" 7'-1 5/8"
11'-1 7/8"
4'-3 5/8"
℄
6'-0 3/4"
1'-8 3/8"
2'-0 3/8"
4'-9"℄
3'-5 1/8" 24'-0"
2A
7.01
D1
D1s
D1
D1
D1
D1
D2
D2
D2s
D2
W2s
ALIG
N
D1s
D1s
D1s
D2s
W4
W3
D2
D1
D1
D1
D2
D2
SIM
.
SIM
.
7'-7 3/4"
℄11'-0 3/8"
℄
21'-3 3/8"
8'-7 5/8"
21'-5 1/4"
31'-10 3/4"
150°
150°
120°
120°
D2s
D2D
4s
D2s
SIM
.
4'-0"4'-0"
D4s
D2s
D2s
D2s
D4s
D2D
2
D2sD
2s
D2D
2
D2
W4
D2
D1
D1
S1 TY
P.
S1
TYP
.
8'-11 1/4"
℄
D2D
2
D2sD
2s
D2
D4 D
2
7'-5 7/8"7'-5 7/8"
D4s
D2
TYP
.
9'-2 1/2"15'-10 3/8"
6'-0"
TYP
.
10 1/2"TYP.
6'-0"
TYP
.
28'-5 3/8" TYP
.28'-5 3/8" TY
P.
28'-5 3/8" TYP
.28'-5 3/8" TY
P.
10'-8"
6'-0"TY
P.
13'-10 1/8"
11'-0"
19'-8 1/2"
℄
6'-0"
TYP.
5'-7 5/8"7'-0 7/8"2'-1 7/8"
9'-0 7/8"
12'-3"
5'-0"
TYP
.
112.82°
1'-3"
6'-6"
2'-11 5/8" 5'-0" 42'-5 1/8"
5'-0"
R64'-0"
CE
NTE
R O
FR
AD
IUS
AT P
ATIO
PA
TIO
33'-0 1/4"
9 7/8"
3'-2"3'-0 3/4"
14'-0 1/8"
6'-6"12'-7 3/8"
8'-2"
1'-5 3/4"
-7-1/2"
+0"
21
22
19
20A
5.02
1st Floor Phase 1
Design Development
10145.002
Northstar Nazareth Living Center
5' 10' 20'0
October 18, 2012
east elevation
first floor
88'-2 1/2"GARAGE FLOOR
1/2"=1'-0"WALL SECTION BALCONY @ GARAGE
A6.112
100'-0"FIRST FLOOR
UNITDWELLING
1" DRIP
SLOPE = 1/4: 12
BALCONY
R-19 BATTINSULATION
6 MIL MOISTUREBARRIER BELOW SLAB
GARAGE
PAINTED 8" CMU(NOM.), RE: STRUCT.
CONC. SLAB ONGRANULAR FILL, RE:STRUCT.
SLOPE2% MAX
7'-0
"4"
BOND BEAM, RE: STRUCT.
BASE BID: VINYL SIDINGADD ALTERNATE: BRICK VENEER
THRESHOLD SET INMASTIC
VINYL RAILING WITHSQUARE BALLUSTERS
STEEL POUR STOP- (PT),RE: STRUCT.
3A8.03
13A8.03
COLUMN BEYOND
SLOPE2% MAX
2X4 VINYL CLAD LAY-INCEILING SUSPENDEDFROM METAL DECK
7 1/
2"
RE: A0.05
PROVIDE PECORAWATERPROOFING ATCONC. PATIO SLABSABOVE GARAGE
Cro
ss R
efer
ence
:P
roje
ct:
Pro
ject
No.
:Is
sue
Dat
e:11
/16/
1210
145.
002
AS
I 9-A
6.11
AS
I No.
9N
azar
eth
Livi
ng C
ente
r 2
Naz
aret
h La
ne, S
t. Lo
uis
Mis
sour
i 631
02
co
ns
ul
ta
nt
c
oo
rd
ina
tio
n
sh
op
dr
aw
ing
r
ev
iew
+ s
ol
ut
ion
s
6'-4"
6'-4"
105R
EC
YC
L'GTR
AS
H/
S1-1
STA
IRN
OR
TH
S2-1
STA
IRS
OU
TH
133C
LOS
ET
TEC
H
132JA
NITO
R
102C
OR
RID
OR
A101
UN
IT
A103
UN
IT
A105
UN
IT
E-1
ELE
V137
ELE
C
121LO
UN
GE
122C
OR
RID
OR
123C
OR
RID
OR
130C
OR
RID
OR
131E
LEC
ME
CH
/
134C
OR
RID
OR
RO
OF
BE
LOW
RO
OF
BE
LOW
A111
UN
ITA
DA
A117
UN
IT
A119
UN
IT
A118
UN
IT
A112
UN
ITA
DA
C116
UN
IT
C114
UN
IT
C115
UN
IT
C113
UN
IT
S1-1A
S2-1
105A
130
135
131
132
133
135R
EC
YC
L'GTR
AS
H/
101LO
BB
YE
LEV
137
138R
OO
MC
AR
D138
A123
UN
ITA
121U
NIT
136C
OR
RID
OR
129R
OO
MM
ED
IA
127S
TOR
EG
EN
ER
AL
128S
TOR
AG
E
120C
ON
FER
EN
CE
FAM
ILY P
AR
TY/
125JA
NITO
R
124R
ES
TRM
.P
UB
LIC
126R
ES
TRM
.P
UB
LIC
106B
AR
107D
ININ
G R
OO
M
108B
EV
ER
AG
E
109C
OO
K
111P
RE
P
119FR
EE
ZER
118C
OO
LER
117H
ALL
116R
ES
TRM
.S
TAFF
115LIN
EN
S
114JA
NITO
R
113O
FFICE
112S
TOR
AG
ED
RY
110R
OO
MD
ISH
S1-1B
104102
109 113
114
116
117
120A
122
123
124126
125
127
128
129A
4'-6" HIG
H W
ALL
107A
1A
5.02
44 seats
UP
DN
UPD
N
120B
RO
OF
BE
LOW
129B
107B
9a
A5.01
117A
117AM
EC
H.
72"
48"
48"
1A
5.03
105B
2A
7.03
2A
7.02
1A
7.04
3A
5.02
6'-0"
TYP
.
8'-11 1/2"12'-11 1/4"15'-0 7/8"15'-0 7/8"15'-0 7/8"13'-1 7/8"13'-1 7/8"14'-2 5/8"16'-1 3/4"27'-10 1/4"
18'-11 7/8"
3'-2 1/8"
3'-2"4'-7 5/8"
18'-10 1/2"
13'-5 7/8"3'-0 5/8"
12'-2 1/2"
14'-10 7/8"13'-1 7/8"35'-2"12'-8 1/4"10'-9 1/8" 12'-4 5/8"13'-1 7/8"15'-0 7/8"15'-0 7/8"13'-6 1/4"
6'-6"
18'-1 1/4" 15'-6"
6 3/4"
10'-0 3/4" 13'-1 7/8"
2'-4"
23'-1 3/4" 12'-8 1/4" 35'-2" 13'-1 7/8" 18'-8 5/8"
9'-0 3/4"
3'-3 1/4" 21'-10 3/4"
20'-10 3/4"
82'-2 1/2"
℄℄
℄
℄
℄℄
4"
℄6'-6"
℄
℄
4"
℄ ℄
25'-9 1/4"
8'-1 1/8"
℄
15'-6 3/4"5'-0 5/8"℄
15'-0 7/8"15'-0 7/8"
13'-5 3/4"
SIM
.
104C
OR
RID
OR
6'-5 1/4"
6'-0"
TYP.
8'-3 1/4"
1'-1 5/8"
3'-7 1/2"
4'-7 3/4"
℄
℄℄
3'-3 5/8" 7'-1 5/8"
11'-1 7/8"
4'-3 5/8"
℄
6'-0 3/4"
1'-8 3/8"
2'-0 3/8"
4'-9"℄
3'-5 1/8" 24'-0"
2A
7.01
D1
D1s
D1
D1
D1
D1
D2
D2
D2s
D2
W2s
ALIG
N
D1s
D1s
D1s
D2s
W4
W3
D2
D1
D1
D1
D2
D2
SIM
.
SIM
.
7'-7 3/4"
℄11'-0 3/8"
℄
21'-3 3/8"
8'-7 5/8"
21'-5 1/4"
31'-10 3/4"
150°
150°
120°
120°
D2s
D2D
4s
D2s
SIM
.
4'-0"4'-0"
D4s
D2s
D2s
D2s
D4s
D2D
2
D2sD
2s
D2D
2
D2
W4
D2
D1
D1
S1 TY
P.
S1
TYP
.
8'-11 1/4"
℄
D2D
2
D2sD
2s
D2
D4 D
2
7'-5 7/8"7'-5 7/8"
D4s
D2
TYP
.
9'-2 1/2"15'-10 3/8"
6'-0"
TYP
.
10 1/2"TYP.
6'-0"
TYP
.
28'-5 3/8" TYP
.28'-5 3/8" TY
P.
28'-5 3/8" TYP
.28'-5 3/8" TY
P.
10'-8"
6'-0"TY
P.
13'-10 1/8"
11'-0"
19'-8 1/2"
℄
6'-0"
TYP.
5'-7 5/8"7'-0 7/8"2'-1 7/8"
9'-0 7/8"
12'-3"
5'-0"
TYP
.
112.82°
1'-3"
6'-6"
2'-11 5/8" 5'-0" 42'-5 1/8"
5'-0"
R64'-0"
CE
NTE
R O
FR
AD
IUS
AT P
ATIO
PA
TIO
33'-0 1/4"
9 7/8"
3'-2"3'-0 3/4"
14'-0 1/8"
6'-6"12'-7 3/8"
8'-2"
1'-5 3/4"
-7-1/2"
+0"
21
22
19
20A
5.02
1st Floor Phase 1
Design Development
10145.002
Northstar Nazareth Living Center
5' 10' 20'0
October 18, 2012
A7.047
1'-6 1/2"
105RECYCL'G
TRASH/
105A
S1-
1B
104
EXHAUSTSHAFT ABOVE
TRASH CHUTEABOVE
+0"
-3"
REMOTE POWERUNIT
FUSED DISCONNECTSWITCH BOX
1'-6
1/2
"
NOTE:COORDINATE COMPACTOR/CONTAINER LOCATION WITHTRASH CHUTE.
2 CU. YARDCOMPACTIONCONTAINER
℄
℄
TRASHCOMPACTOR
W3 W5
105B
U1
3"
PROVIDE (2)ADDITIONAL LAYERS OF5/8" GYP. BOARD THISSIDE OF WALL
7 1/4"
7 1/4"
1/4":12" Slope Max.1/8":12" Slope Min.
12'-5
3/4
"
1/2"=1'-0"Trash Chute Plan - First Floor
A7.041
Project No.:Cross Reference:Project:Issue Date:
Nazareth Living Center 2 Nazareth Lane, St. Louis, MO 63129
09/25/201210145.002
ASI No. 4
ASI No. 4-1/A7.04
3/4"=1'-0"KITCHEN ISLAND ELEVATION
3
4'-0"
4 1/
2"1'
-4"
7"7"
2'-1
0 1/
2"EQ.
1'-8" 8" 1'-8"
EQ.
3'-0
" MA
TCH
AD
J
KIT
CH
EN
CTR
TOP
HT
STONE COUNTERTOPWITHOUT BACKSPLASH(PROVIDE 1" RADIUS ATCORNERS, TYP.) - COLORSHALL MATCH ADJ. KITCHENCOUNTERTOP
OPTIONAL DRAWER LOCK
LOCKABLE CASTERS -LOCATE WHEEL FLUSH WITHF.O. CABINET AS TO NOTCREATE A TRIP HAZARD
BASE CABINET WITHDRAWERS - (PROVIDEMODIFIED FULL OVERLAYCABINET DRAWERS PERSPEC)
CABINET HARDWARESHALL MATCH ADJKITCHEN HARDWARE
NOTE:CABINET DRAWER ANDDOOR PROFILE/STYLE/COLOR/SIZE SHALL MATCHADJ KITCHEN CABINETRY
FULL HEIGHT, TRAY BASECABINET
MATCH ADJ KITCHENCABINETRY, TYP.
Cross Reference:Project: Project No.:Issue Date:
2 Nazareth Lane, St. Louis, MO 63129Nazareth Living Center
Kitchen Island Elevations
ASI-A4.01-3
1014511/15/2012
ma
te
ria
l s
el
ec
tio
n
pr
od
uc
t d
es
ign
mo
ck
up
pa
ne
l
ar
ch
ite
ct
’s
su
pp
le
me
nt
al
in
st
ru
ct
ion
s
14
pioneer network conferencepresentation
4
The Sarah Community Anna House Story
Household Renovation
St. Joseph�’s Home429 SF/Bed
The Sarah Community Anna House Story
Household Renovation
Brooking Park Memory Care460 SF/Bed
The Sarah Community Anna House Story
Neighborhood �– New Construction
MeadowlandsMemory Care
559 SF/Bed
The Sarah Community Anna House Story
Neighborhood �– New Construction
Clarity Pointe565 SF/Bed
The Sarah Community Anna House Story
Dining Experience
ACTIVITY HOUSEHOLD
The Sarah Community Anna House Story
Dining Experience
NEIGHBORHOOD NEIGHBORHOOD
4
The Sarah Community Anna House Story
Household Renovation
St. Joseph�’s Home429 SF/Bed
The Sarah Community Anna House Story
Household Renovation
Brooking Park Memory Care460 SF/Bed
The Sarah Community Anna House Story
Neighborhood �– New Construction
MeadowlandsMemory Care
559 SF/Bed
The Sarah Community Anna House Story
Neighborhood �– New Construction
Clarity Pointe565 SF/Bed
The Sarah Community Anna House Story
Dining Experience
ACTIVITY HOUSEHOLD
The Sarah Community Anna House Story
Dining Experience
NEIGHBORHOOD NEIGHBORHOOD
brief: a study on creating effiecient resident-oriented programmatic floor plans in senior living establishments, creating a welcoming sense of community. These are described as neighbor-hoods and allow for an enhanced focus on health and experience of the residents.
16
4
The Sarah Community Anna House Story
Household Renovation
St. Joseph�’s Home429 SF/Bed
The Sarah Community Anna House Story
Household Renovation
Brooking Park Memory Care460 SF/Bed
The Sarah Community Anna House Story
Neighborhood �– New Construction
MeadowlandsMemory Care
559 SF/Bed
The Sarah Community Anna House Story
Neighborhood �– New Construction
Clarity Pointe565 SF/Bed
The Sarah Community Anna House Story
Dining Experience
ACTIVITY HOUSEHOLD
The Sarah Community Anna House Story
Dining Experience
NEIGHBORHOOD NEIGHBORHOOD
4
The Sarah Community Anna House Story
Household Renovation
St. Joseph�’s Home429 SF/Bed
The Sarah Community Anna House Story
Household Renovation
Brooking Park Memory Care460 SF/Bed
The Sarah Community Anna House Story
Neighborhood �– New Construction
MeadowlandsMemory Care
559 SF/Bed
The Sarah Community Anna House Story
Neighborhood �– New Construction
Clarity Pointe565 SF/Bed
The Sarah Community Anna House Story
Dining Experience
ACTIVITY HOUSEHOLD
The Sarah Community Anna House Story
Dining Experience
NEIGHBORHOOD NEIGHBORHOOD
south east missouri state UNIVERSITY-RIVER CAMPUS MIXED USE
Client: south east missouri state university Location: 518 S Fountain St Cape Girardeau, MO 63702
program: student housing academic program- art studios
context: river campus
18
MUSICSPACE ALLOCATION DIAGRAMS
9/24/2012
H01
3125 SF
CHORAL REHEARSAL
H02CHAMBER
H08
H11
OFFICE120 SF
900 SF
H10INSTRUMENTSTORAGE
500 SF
H09
400 SF
CHORALLIBRARY
H07H12 H13
H06
SECTIONALCLASSROOM-03
H05
SECTIONALCLASSROOM-02
H04
H03SECTIONALCLASSROOM-01
500 SF
OFFICE120 SF
OFFICE120 SF
PRACTICE ROOMS
120 SF
120 SF
120 SF
500 SF
500 SF
SHARED SPACESSPACE ALLOCATION DIAGRAMS
9/24/2012
A03
K02CLASSROOM
3300 SF
K03STUDENT BREAKROOM
300 SF
K03STAFF
250 SF
K07RESTROOM
1000 SF
K05COMMON GALLERY
TBD
THEATER & DANCESPACE ALLOCATION DIAGRAMS
9/24/2012
J01
4200 SF
DANCE STUDIO
J10 J11J09
J03SHOWER
J02WOMEN'SLOCKER ROOM
2160 SF
J06DIRECTING
OFFICE120 SF
J04 J05MEN'S LOCK.ROOMS
SHOWER
750 SF
320 SF
OFFICE120 SF
OFFICE120 SF
J12TRAINING ROOM
music
theater & Dance shared spaces
CERAMICSSPACE ALLOCATION DIAGRAMS
9/24/2012
B14OUTDOOR CERAMICS YARD
OUTDOOR STORAGE
B12 B11
B13
400 SF
PROJECTSTORAGE
OFFICES120 SF EA.
B10
750 SF
GLAZE
B09
700 SF
KILN ROOM
200 SFRECEIVING
B08
B07
400 SF
CLAY MATERIALSTORAGE
B06 CLAYMIXING
150 SF
B05
1600 SF
INDEPENDENT STUDIOS
B03
1,100 SF
WHEEL THROWING
1,000 SF
B02ADV. CLASSROOM
B01
1250 SF
HAND BUILDING AND METAPHOR
RCVG
TBD
PAINTINGSPACE ALLOCATION DIAGRAMS
9/24/2012
C06
2000 SF
INDEPENDENT STUDIOS
C05
C04SPRAY BOOTH
C01PAINTING
2000 SF
C03MODEL
OFFICE
FRAME MAKING
C02 120 SF
J03SHOWER
J02WOMEN'SLOCKER ROOM
J04
J05
ROOMS
SHOWER
750 SF 320 SFMEN’S LOCK.
100 SF
TBD150 SF
SCULPTURESPACE ALLOCATION DIAGRAMS
9/24/2012
F06OFFICE
120 SF
F05SPRAY BOOTH
200 SF
F04STORAGE250 SF
F02STORAGE
300 SF
1800 SF
F013D STUDIO
D02STORAGE
250 SF
D05
600 SF
INDEPENDENT WORKAREA
D04WOODS MAJORS STUDIO
1200 SF
D01WOOD SHOP
2200 SF
D06SPRAY BOOTH
100 SF
D07OFFICE
120 SF
E07
E06SPRAYBOOTH
300 SF
E02METALSSTORAGE
400 SF
E01METALS SHOP
2600 SF
E05STORAGE250 SF
E04STORAGE
CLASSROOM
250 SF
D07
F07
875 SF
E03D03
F03
TBD
ART/GENERAL EDUCATIONSPACE ALLOCATION DIAGRAMS
A03
A02OFFICE120 SF
A01
2,100 SF
CLASSROOM-01
1,000 SFA04TEACHING GALLERY
A05INDEPENDENT STUDIOS
OUTDOOR SCULPTURE EXHIBIT
A07
K02CLASSROOM
3300 SF
OFFICE120 SF
1,800 SF TBD
9/24/2012
space allocation diagramsart/gen. ed. ceramics painting
sculpture
brief:
schematic design design developmentspace allocation diagramscontext studiesprecedent studies 3-d modeling siting options
efficient floor plan options
UNIT A4 BEDROOM/ 4 BATH
BEDROOM
BEDROOM
BATH BATH
W/D
BATH BATH
BEDROOM
BEDROOM KIT
CH
EN
ETT
E
R
8'-6
"
14'-3"
8'-6
"
14'-3"
14'-3"
8'-6
"
8'-6
"
14'-3"
6'-6
"
6'-6
"
32'-0
"
DWELLING
13'-0"
DINING
Sketch/Page No.
refer to sheet A3.0
A01Unit A
612.127
Southeast Missouri State River Campus Residence Hall & Academic Program
07.05.12
Scale: 3/16" = 1'-0"
0 5'-4"2'-8"1'-4"
UNIT B4 BEDROOM/ 4 BATH
BATH
BEDROOMBEDROOM
BATH
KIT
CH
EN
ETT
E
RW/D
13'-0"
8'-6"
6'-6"
8'-6"
14'-3
"3'
-6"
14'-3
"
32'-0
"
BATH
BEDROOM BEDROOM
BATH
8'-6"
6'-6"
8'-6"
14'-3
"3'
-6"
14'-3
"
DWELLING
DINING
Sketch/Page No.
refer to sheet A3.0
A01612.127
Southeast Missouri State River Campus Residence Hall & Academic Program
Scale: 3/16" = 1'-0"
0 5'-4"2'-8"1'-4"
Unit B
07.05.12
UNIT HYBRID4 BEDROOM/ 4 BATH
BATH
BEDROOMBEDROOM
BATH
KIT
CH
EN
ETT
E
RW/D
13'-0"
8'-6"
6'-6"
8'-6"
14'-3
"3'
-6"
14'-3
"
32'-0
"
DWELLING
DINING
BATH BATH
BEDROOM
BEDROOM
8'-6
"
14'-3"
8'-6
"
14'-3"
Sketch/Page No.
refer to sheet A3.0
A01612.127
Southeast Missouri State River Campus Residence Hall & Academic Program
Scale: 3/16" = 1'-0"
0 5'-4"2'-8"1'-4"
Unit C (Hybrid)07.05.12
UNIT TYPES STUDY
= net leaseable areagross areanet area
EFFICIENT FLOOR PLANS
SEMO RIVER CAMPUS MIXED USE
20
PROGRAM SITING OPTIONS
STUDENT HOUSING
ACADEMIC PROGRAMS
EXISTING BUILDINGS
CONCEPT: programmatically, establish a relationshipbetween the academic program spaces and the residential housing
Client: archdiocese of st. louis Location: 3310 S Grand Blvd Saint Louis, Missouri 63116program: catholic charities offices:
catholic family servies refugee centersouthside centerlamphousing resource childcare center
shared multi-purpose spaces
context: st. louis city
brief: abandoned school buildingProgramming Adjacenciesfield verifying existing conditions consultant coordinationAdaptive ReuseHistoric Preservationintegrating new systems multiple clients & programs
ST. PIUS VADAPTIVE REUSE`
brief: abandoned school buildingProgramming Adjacenciesfield verifying existing conditions consultant coordinationAdaptive ReuseHistoric Preservationintegrating new systems multiple clients & programs
22
3rd floor plan-demo 3rd floor plan-new
sharedrefugee centerheatlth + assistance
CLOSET
CLOSET
DSDS
PLAS. CLG @13'-2" A.F.F.
WOOD FLR'G
OFFICE
2x2 APC @7'-11 1/2" A.F.F.
CARPET
CLOSETWOOD FLR'G
12x12 VCT CLOSETVCT FLR'G
CLASSROOM12x12 VCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
PLAS. CLG @13'-2" A.F.F.
OFFICECARPET
PLAS. CLG @13'-2" A.F.F.
S
CLASSROOM12x12 VCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
12x12 VCT FLR'G
HALLWAYHISTORICAL
PLAS. CLG. @12'-5" A.F.F.
TERRAZZO FLR'G
CLASSROOM12x12 VCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
SD.F.
CLASSROOMVCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
CLASSROOMVCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
CLASSROOMVCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
CLOSETVCT FLR'G
TERRAZZO FLR'G
TERRAZZO FLR'G
TERRAZZO FLR'G
CLOSETCLOSET
QUARRY TILE FLR'G
CLOSETVCT FLR'G
F.S.
JAN.
CLOCK
UP
(13
)R@
7 7
/16"
-
DN
DN
DN
(13
)R.
@ 7
.5"+
UP
109'-9" F.F.
111'-10" F.F.
DSDS
DN
(8)
R.
@ 7
5/8
"U
P (
13)R
.@
7 3
/4"
BREAK RM
MULTIPURPOSEROOM
GRANTRECIPIENT
COPY
INTAKE
FAMILY CONF.
REFUGEE CENTER
HISTORICALHALLWAY
DIRECTOR
MECH. RM.
WS5
WS2
WS3
WS4
WS6
WS7
WS8
RECEPTION
WS5
WS1
WS2
WS3
WS4
WS6
WS7
WS8
ELEC./DATA
STAFF OFFICE
HEALTH &ASSISTANCE
CENTER
MECH.
STAFF WOMENS RR
STAFF MENS RR
3284
10'-6"11'-3"
5'-3 1/2" 15'-4 1/2"
2'-3 1/2"
2'-3
1/2
"1'
-8"
14'-1 1/8"7'-4"INSIDE SHAFT
6'-3
1/4
"IN
SID
E S
HA
FT9'
-9 1
/2"
19'-5
"
12'-3
1/4
"9'
-3 1
/8"
9'-5
1/4
"35
'-8"
ALIGN
ALIGN
16'-3" 4'-5"
5'-10" 4'-5"10'-5"
11'-0" 9'-8"
14'-1
1 3/
4"
11'-1
3/8
"
8'-6"5'
-9 1
/2"
ALIGN
UP
(13
)R@
7 7
/16"
-D
N(1
1)R
DN
(11)
R
LANDING ELEV. @120'-2 3/4" A.F.F.
STAFF RR
16'-2
1/2
"
LOBBY
HISTORICALCORR.
STAIR
PASSAGE
ELEVATOR
1'-6"
EXAM
DWREF
MICRO
OVEN/ COOKTOP & HOOD
3'-4
"
1
1
1 1
1
6 TYP. @ELEVATOR
1
2
1
1
1
1
1
7 7
1
1
DS
DS
1FEC
FEC
BOTT. BM. @11'-1 1/2" A.F.F.
PLAS. CLG. @12'-5" A.F.F.
PLAS. CLG @12'-4 1/2" A.F.F.
PLAS. CLG @12'-4 1/2" A.F.F.
BOTT. BM. @11'-11 1/2" A.F.F.
PLAS. CLG @13'-2" A.F.F.
PLAS. CLG @13'-2" A.F.F.
BOTT. BM. @12'-6" A.F.F.
PLAS. CLG @12'-4 1/2" A.F.F.
BOTT. BM. @12'-6" A.F.F.
BOTT. BM. @11'-1 1/2" A.F.F.
BOTT. BM. @11'-1 3/4" A.F.F.
PLAS. CLG @12'-4 1/2" A.F.F.
APC-1 @9'-0" A.F.F.
APC-1 @9'-0" A.F.F.
The Professional Architect's seal affixed to this sheetapplies only to the material and items shown on thissheet. All drawings, instruments or other documents notexhibiting this seal shall not be considered prepared bythis architect, and this architect expressly disclaims anyand all responsibility for such plans, drawings ordocuments not exhibiting this seal.
This drawing and details on it are the sole property of thearchitect and may be used for this specific project only.It shall not be loaned, copied or reproduced, in whole orpart, or for any other purpose or project without thewritten consent of the architect.
12114.001
KPG
Issue Date
No. Description Date
3530
Uta
h S
tree
t, S
t. Lo
uis,
Mis
sour
i 63
118
St.
Piu
s V
Cat
holic
Cha
ritie
sA
rchd
ioce
se o
f Sai
nt L
ouis
AD
AP
TIV
E R
EU
SE
FO
R:
99% REVIEW SET
DECEMBER 28, 2012
2nd FLOOR PLANSDEMOLITIONNEW WORK
2nd FLOOR PLAN - DEMOLITIONSCALE: 1/8" = 1'-0"
1NORTHPLAN
2nd FLOOR PLAN - NEW WORKSCALE: 1/8" = 1'-0"
2NORTHPLAN
2nd CEILING PLAN PLAN - NEW WORKSCALE: 1/8" = 1'-0"
3NORTHPLAN
XDEMOLITION KEYED NOTES1 REMOVE PARTITION AND ASSOCIATED DOORS IN IT'S ENTIRETY AS INDICATED.
2
4
3REMOVE MISCELLANEOUS SHELVING, COAT RACKS ETC. AT EXISTINGCLOSETS AS REQUIRED FIELD VERIFY CONDITION.
REMOVE BUILT-IN WOOD STORAGE CABINET OR SHELVING UNIT..
SAW CUT AND REMOVE EXISTING CMU AS REQUIRED FOR NEW DOOR OPENING
2
1
11
3
3
3
33
3
3
4
1
(THIS PLAN ONLY)
1
1
1
4
4
4 4
4
4
5REMOVE EXISTING POWER PANEL- REFER TO M.E.P. DRAWINGS FOR MOREINFORMATION.
6REMOVE C.I. RADIATOR AND ASSOCIATED PIPING COMPLETELY- REFER TOM.E.P. DRAWINGS FOR MORE INFORMATION.
5
6 4
6
6
6
6
6
6
6
6
6
6
6
6
6
6 6
7 REMOVE EXISTING FINISH FLOOR MATERIAL AND UNDERLAYMENT ASINDICATED (HARDWOOD FLOORING TO REMAIN). SEE GENERAL NOTE 3
8EXISTING TERRAZZO FLOORING TO REMAIN, PROTECT DURING THEDEMOLITION AND CONSTRUCTION PROCESS.
7
8
8
9REMOVE WALL MOUNTED TRIM, CHALK BOARDS, MARKER BOARDS, ETC.(RETAIN HISTORIC CHALK BOARD WHERE NOTED)
7 7
4
9
7
9
7
9
7
9
7
97
9
10REMOVE WALL MOUNTED SINK, SINK AND BASE CABINET, AND OR DRINKINGFOUNTAIN, REFER TO M.E.P. DRAWINGS FOR MORE INFORMATION.
66
10
10
10
11 SAW CUT AND REMOVE AREA OF CONCRETE SLAB FOR NEW ELEVATOR,REFER TO STRUCTURAL DRAWINGS FOR MORE INFORMATION.
12REMOVE PIPING AND STACKS AS REQUIRED, REFER TO M.E.P. DRAWINGS FORMORE INFORMATION.
12
12
12
12
13REMOVE STEEL FLUE PIPE AND METAL SUPPORT BRACKETS, PATCH EXISTINGMASONRY AS REQUIRED AT REMOVED BRACKETS.
13
14
14 REMOVE EXISTING WINDOW AND WOOD TRIM.
1
15
15
TYP.
15
TYP.
15
TYP.
15
TYP.
15
TYP.
15
TYP.
XXX
XCONSTRUCTION PLAN KEYED NOTES (THIS PLAN ONLY)
1HISTORIC CLOCK TO REMAIN, REPLACE MISSING GLASS LENS ON SOUTHSIDE. PROTECT DURING DEMOLITION AND CONSTRUCTION PROCESS
2
16REMOVE WOOD DOOR AND RETAIN DOOR FOR POSSIBLE INSTALLATION AT NEWLOCATION. EXISTING DOOR FRAME AND TRANSOM TO REMAIN.
16
HISTORIC TERRAZZO FLOORING AND BASE, RESTORE ANY DAMAGED AREASIF ANY, SCRUB CLEAN, POLISH AND SEAL AS REQUIRED FOR LIKE NEWAPPEARANCE.
1
3HISTORIC CORRIDOR TO BE PRESERVED; REPAIR ANY DAMAGED PLASTERWALLS AND CEILINGS TO MATCH ADJACENT FINISHES.
PRESERVEHISTORICCHALK BD.
17
17TYP.
2
TYP.2
TYP.3
4HISTORIC STAIRS TO BE PRESERVED; REPAIR ANY DAMAGED PLASTER WALLSAND CEILINGS TO MATCH ADJACENT FINISHES. CLEAN REPAINT WINDOWFRAMES AT NORTH ELEVATION
4
5
5 HISTORIC CHALK BOARD TO BE PRESERVED, CLEAN/ SAND WOOD FRAME ASREQUIRED AND REPAINT. USE ELEMENTS FROM DEMO BOARDS IF REQ'D.
6 HISTORIC CORRIDOR DOOR TO BE PRESERVED; REPAIR DOOR AND FRAME ASREQUIRED. REFER TO DOOR SCHEDULE FOR MORE INFORMATION.
6
69
6
6
6
9 7
7 HISTORIC DOOR FRAME AND TRANSOM TO BE PRESERVED; REPAIR DOORFRAME AND TRANSOM IF REQUIRED. FILL HINGE POCKETS, LATCH HOLES,ETC. AND REFINISH FRAME TO MATCH EXISTING FINISH. SEE DOOR SCHED.
8
8EXISTING ENTRY AND STEPS, RESTORE TO HISTORIC CONDITION-SEE DETAILS 1 THRU 4 SHEET A3.2.
2
REMOVE LOOSE DELAMINATING OR DAMAGED PLASTER AT EXTERIOR WALLSAND PREP AS REQUIRED FOR NEW PLASTER FINISH (FEILD VERIFY CONDITIONS).
8
9 HISTORIC DOOR WITH SWING REVERSED AS SHOWN, PREP EXISTING FRAMEFOR NEW SWING/ HARDWARE. REFER TO DOOR SCHEDULE.
1 PATCH AND REPAIR ALL EXISTING PLASTER CEILINGS ASREQUIRED TO MATCH EXISTING FINISH, PAINT AS SCHEDULED.
TYP.1
TYP.1
TYP.1
TYP.1
TYP.1
TYP.1
TYP.1
TYP.1
2 PATCH IN AND REPAIR EXISTING HISTORIC CEILING MOLDINGSAT EXTERIOR WALLS AND AT HISTORIC CORRIDOR ATDEMOLISHED PARTITIONS OR AS REQUIRED TO MATCH EXISTINGCLEAN AND PAINT.
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.1
TYP.1
TYP.2
XCEILING PLAN KEYED NOTES (THIS PLAN ONLY)
10HISTORIC WOOD BASE MOLDINGS AND WALL RAIL TRIM TO BE PRESERVED,TYPICAL AT EXTERIOR WALL AND CLASSROOM SIDE OF HISTORIC CORRIDOR.
10TYP.
10TYP.
10TYP.
10TYP.
10TYP.
10TYP.
10TYP.
10TYP.
10TYP.
REVERSEDR. SWING
3
6
DEMOLISHED PARTITION/ CONSTRUCTION
EXISTING PARTITION/ CONSTRUCTION
NEW PARTITION
NEW OR EXISTING (1) HOUR RATED PARTITION
NEW OR EXISTING (2) HOUR RATED PARTITION
PLAN LEGEND 2x4 LAY-IN FLUORESCENT LIGHT FIXTURE
2x4 ACOUSTICAL PANEL CEILING SYSTEM (APC)
DIRECT/ INDIRECT FLUORESCENTLIGHT FIXTURE
SURFACE MOUNTED OR PENDENTTYPE LIGHT FIXTURE
COMPACT FLUORESCENT CAN LIGHT FIXTURE
1x4 SURFACE MOUNTED OR SUSPENDEDFLUORESCENT STRIP TYPE LIGHT FIXTURE
PARTITION WITH ACOUSTICAL BATTS
1. REFER TO GENERAL NOTES AND CUTTING AND PATCHING NOTESSHEET A2.1 FOR MORE INFORMATION.
2. ALL PLASTER WALLS AND CEILINGS TO REMAIN EXPOSED TO VIEW INNEW CONSTRUCTION ARE TO BE VISUALLY INSPECTED, REMOVESPALLED OR LOOSE PLASTER FINISHES AND REMOVE ANY PEELINGPAINT AND PREP WALLS AND CEILINGS AS REQUIRED FOR PLASTERREPAIR WORK.
3. HARDWOOD FLOORS; ANY AREAS FOUND TO BE UN-SOUND ORDAMAGED ARE TO BE PATCHED AS REQUIRE TO RECEIVE NEWUNDERLAYMENT / FINISHES FLOOR MATERIAL AS SCHEDULE.
1. ALL EXISTING INTERIOR AND EXTERIOR PLASTER WALLS EXPOSEDTO VIEW IN NEW CONSTRUCTION ARE TO BE PATCHED, REPAIREDAND RESTORED TO ORIGINAL WALL FINISH AND TEXTURE ASREQUIRED, FIELD VERIFY EXTENT OF WORK.
2. PROTECT ALL HISTORIC BUILDING ELEMENTS TO REMAIN DURINGTHE DEMOLITION AND CONSTRUCTION PROCESS, TYP.
3. ALL EXISTING WINDOWS AND WOOD WORK ARE TO BE INSPECTEDAND REPAIRED AS REQ'D. WOOD FRAMES, STOOLS AND TRIM ARETO BE PAINTED AS SCHEDULED. SEE TYP. DETAIL 2/A8.1
1
18 REMOVE EXIST'G DOOR AND FRAME
18
19 REMOVED WOOD CASED DOOR OPENINGS AT WALL TO REMAIN
19 19
18
REVERSEDR. SWING
20
20 REMOVED WOOD DOORS, FRAMES AND SIDELITES AT FRONT ENTRY,WOOD VERTICAL HISTORIC MULLIONS TO REMAIN- SEE DETAIL 3/A3.2
21 REMOVE EXIST'G INFILL CONSTRUCTION AT PREVIOUSLYDEMOLISHED WINDOWS FOR NEW MASONRY BEARING CONSTR.
21 21
22
REMOVE WINDOW AC. UNIT AND METAL COMPOSITE PANEL SET INEXIST'G ALUM. WINDOW SASH FRAME, FRAME TO REMAIN.
22 REMOVE EXIST'G INFILL CONSTRUCTION AT PREVIOUSLYDEMOLISHED WINDOW AS REQ'D FOR NEW ALUM. WINDOW.ORIGINAL WOOD WINDOW FRAME IS TO REMAIN.
23
22
REMOVEAC UNITAND WOODSHELVING
23
11NEW STEEL PIPE HANDRAILS, CORE DRILL POST INTO STONE STEPS ORCONCRETE, SET IN NONE SHRINK GROUT.
11
12EXISTING STONE STEPS, MUD-JACK AND SEAL JOINTS AS REQ'D-SEE DETAIL 4/A3.2
12
13PROVIDE NEW 8" CMU FILL WITH PLASTER FINISH TO MATCH ADJACENTWALLS AT EXISTING WINDOW OPENINGS
14
13
1. EXISTING PLASTER CEILINGS TO REMAIN EXPOSED TO VIEWARE TO BE RESTORED TO ORIGINAL FINSIH AND ANY LOOSEOF PEELING PAINT IS TO BE REMOVE AS REQUIRED FORPLASTER REPAIR AND NEW PAINT FINISH.
3
3
3
15 PROVIDE SOUND BATTS IN NEW PARTITIONS AT MECHANICAL ROOM
15
15
1
44
4REPAIR COVED PLASTER CEILING AND TRIM TO ORIGINAL CONDITIONAS REQUIRED AT DEMOLISHED PLUMBING - PAINT AS SCHED..
EXISTING WINDOWS THIS AREA TO BE PROTECTED WITHWATER CURTAIN TO ACHIEVE (1) HOUR RATING .5
5
6
TRANSOM WOOD WORK STRIPPED, CLEANED AND REPAINTED6
16 BRICK VENEER INFILL TO MATCH EXIST'G OVER 5/8" DENSGLAS 3-5/8"METAL STUDS W/ INSULATION AND 5/8" GYP. BD. AT INTERIOR SIDE.PROVIDE SILL FLASHING AND WEEPS AS REQUIRED.
16
REMOVE WINDOW AC. UNIT AND METAL COMPOSITE PANEL SET INEXIST'G ALUM. WINDOW SASH FRAME, FRAME TO REMAIN.
PROVIDE & INSTALL NEW CLEAR INSULATED GLASS IN EXISTINGALUMINUM WINDOW SASH AS REQ'D TO MATCH EXISTING GLAZING.FIELD VERIFY SIZES AND EXIST'G CONDITIONS.
24
24
17
17 HISTORIC CORR; REMOVE ALL SURFACE MOUNTED ELECTRICAL CONDUITS,J-BOXES, LIGHT FIXTURES, ETC. REFER TO M.E.P. DWGS FOR MORE INFORMATION.PLASTER WALLS AND CEILINGS, TRIM, AND DOORS ARE TO BE PRESERVED U.N.O.
14PROVIDE NEW STEEL LINTELS AS REQUIRED AT NEW DOOR OPENINGREFER TO STRUCTURAL DWGS FOR MORE INFORMATION.
1725
REMOVE ALUM. SINGLE HUNG WINDOW, RETAIN FOR INSTALLATIONAT NEW LOCATION- REFER TO CONSTRUCTION PLAN.25
25
NEW MECHANICAL LOUVER IN EXISTING WOOD WINDOW FRAME.INSTALL WEATHER TIGHT .18
18
18
RELOCATED ALUM. SINGLE HUNG WINDOW IN EXISTING WOODWINDOW FRAME. PROVIDE BREAK METAL CLADDING AT EXTERIOR OFWOOD FRAME TO MATCH EXIST'G INSTALLED CONDITIONS, INSTALLWEATHER TIGHT .
19
1919
NEW SUSPENDED ACOUSTICAL PANEL CEILING SYSTEM. SEEDETAILS A, B, & C/A8.1
CLOSET
CLOSET
DSDS
PLAS. CLG @13'-2" A.F.F.
WOOD FLR'G
OFFICE
2x2 APC @7'-11 1/2" A.F.F.
CARPET
CLOSETWOOD FLR'G
12x12 VCT CLOSETVCT FLR'G
CLASSROOM12x12 VCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
PLAS. CLG @13'-2" A.F.F.
OFFICECARPET
PLAS. CLG @13'-2" A.F.F.
S
CLASSROOM12x12 VCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
12x12 VCT FLR'G
HALLWAYHISTORICAL
PLAS. CLG. @12'-5" A.F.F.
TERRAZZO FLR'G
CLASSROOM12x12 VCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
SD.F.
CLASSROOMVCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
CLASSROOMVCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
CLASSROOMVCT FLR'G
PLAS. CLG @12'-4 1/2" A.F.F.
CLOSETVCT FLR'G
TERRAZZO FLR'G
TERRAZZO FLR'G
TERRAZZO FLR'G
CLOSETCLOSET
QUARRY TILE FLR'G
CLOSETVCT FLR'G
F.S.
JAN.
CLOCK
UP
(13
)R@
7 7
/16"
-
DN
DN
DN
(13
)R.
@ 7
.5"+
UP
109'-9" F.F.
111'-10" F.F.
DSDS
DN
(8)
R.
@ 7
5/8
"U
P (
13)R
.@
7 3
/4"
BREAK RM
MULTIPURPOSEROOM
GRANTRECIPIENT
COPY
INTAKE
FAMILY CONF.
REFUGEE CENTER
HISTORICALHALLWAY
DIRECTOR
MECH. RM.
WS5
WS2
WS3
WS4
WS6
WS7
WS8
RECEPTION
WS5
WS1
WS2
WS3
WS4
WS6
WS7
WS8
ELEC./DATA
STAFF OFFICE
HEALTH &ASSISTANCE
CENTER
MECH.
STAFF WOMENS RR
STAFF MENS RR
3284
10'-6"11'-3"
5'-3 1/2" 15'-4 1/2"
2'-3 1/2"
2'-3
1/2
"1'
-8"
14'-1 1/8"7'-4"INSIDE SHAFT
6'-3
1/4
"IN
SID
E S
HA
FT9'
-9 1
/2"
19'-5
"
12'-3
1/4
"9'
-3 1
/8"
9'-5
1/4
"35
'-8"
ALIGN
ALIGN
16'-3" 4'-5"
5'-10" 4'-5"10'-5"
11'-0" 9'-8"
14'-1
1 3/
4"
11'-1
3/8
"
8'-6"
5'-9
1/2
"
ALIGN
UP
(13
)R@
7 7
/16"
-D
N(1
1)R
DN
(11)
R
LANDING ELEV. @120'-2 3/4" A.F.F.
STAFF RR
16'-2
1/2
"
LOBBY
HISTORICALCORR.
STAIR
PASSAGE
ELEVATOR
1'-6"
EXAM
DWREF
MICRO
OVEN/ COOKTOP & HOOD
3'-4
"
1
1
1 1
1
6 TYP. @ELEVATOR
1
2
1
1
1
1
1
7 7
1
1
DS
DS
1FEC
FEC
BOTT. BM. @11'-1 1/2" A.F.F.
PLAS. CLG. @12'-5" A.F.F.
PLAS. CLG @12'-4 1/2" A.F.F.
PLAS. CLG @12'-4 1/2" A.F.F.
BOTT. BM. @11'-11 1/2" A.F.F.
PLAS. CLG @13'-2" A.F.F.
PLAS. CLG @13'-2" A.F.F.
BOTT. BM. @12'-6" A.F.F.
PLAS. CLG @12'-4 1/2" A.F.F.
BOTT. BM. @12'-6" A.F.F.
BOTT. BM. @11'-1 1/2" A.F.F.
BOTT. BM. @11'-1 3/4" A.F.F.
PLAS. CLG @12'-4 1/2" A.F.F.
APC-1 @9'-0" A.F.F.
APC-1 @9'-0" A.F.F.
The Professional Architect's seal affixed to this sheetapplies only to the material and items shown on thissheet. All drawings, instruments or other documents notexhibiting this seal shall not be considered prepared bythis architect, and this architect expressly disclaims anyand all responsibility for such plans, drawings ordocuments not exhibiting this seal.
This drawing and details on it are the sole property of thearchitect and may be used for this specific project only.It shall not be loaned, copied or reproduced, in whole orpart, or for any other purpose or project without thewritten consent of the architect.
12114.001
KPG
Issue Date
No. Description Date
3530
Uta
h S
tree
t, S
t. Lo
uis,
Mis
sour
i 63
118
St.
Piu
s V
Cat
holic
Cha
ritie
sA
rchd
ioce
se o
f Sai
nt L
ouis
AD
AP
TIV
E R
EU
SE
FO
R:
99% REVIEW SET
DECEMBER 28, 2012
2nd FLOOR PLANSDEMOLITIONNEW WORK
2nd FLOOR PLAN - DEMOLITIONSCALE: 1/8" = 1'-0"
1NORTHPLAN
2nd FLOOR PLAN - NEW WORKSCALE: 1/8" = 1'-0"
2NORTHPLAN
2nd CEILING PLAN PLAN - NEW WORKSCALE: 1/8" = 1'-0"
3NORTHPLAN
XDEMOLITION KEYED NOTES1 REMOVE PARTITION AND ASSOCIATED DOORS IN IT'S ENTIRETY AS INDICATED.
2
4
3REMOVE MISCELLANEOUS SHELVING, COAT RACKS ETC. AT EXISTINGCLOSETS AS REQUIRED FIELD VERIFY CONDITION.
REMOVE BUILT-IN WOOD STORAGE CABINET OR SHELVING UNIT..
SAW CUT AND REMOVE EXISTING CMU AS REQUIRED FOR NEW DOOR OPENING
2
1
11
3
3
3
33
3
3
4
1
(THIS PLAN ONLY)
1
1
1
4
4
4 4
4
4
5REMOVE EXISTING POWER PANEL- REFER TO M.E.P. DRAWINGS FOR MOREINFORMATION.
6REMOVE C.I. RADIATOR AND ASSOCIATED PIPING COMPLETELY- REFER TOM.E.P. DRAWINGS FOR MORE INFORMATION.
5
6 4
6
6
6
6
6
6
6
6
6
6
6
6
6
6 6
7 REMOVE EXISTING FINISH FLOOR MATERIAL AND UNDERLAYMENT ASINDICATED (HARDWOOD FLOORING TO REMAIN). SEE GENERAL NOTE 3
8EXISTING TERRAZZO FLOORING TO REMAIN, PROTECT DURING THEDEMOLITION AND CONSTRUCTION PROCESS.
7
8
8
9REMOVE WALL MOUNTED TRIM, CHALK BOARDS, MARKER BOARDS, ETC.(RETAIN HISTORIC CHALK BOARD WHERE NOTED)
7 7
4
9
7
9
7
9
7
9
7
97
9
10REMOVE WALL MOUNTED SINK, SINK AND BASE CABINET, AND OR DRINKINGFOUNTAIN, REFER TO M.E.P. DRAWINGS FOR MORE INFORMATION.
66
10
10
10
11 SAW CUT AND REMOVE AREA OF CONCRETE SLAB FOR NEW ELEVATOR,REFER TO STRUCTURAL DRAWINGS FOR MORE INFORMATION.
12REMOVE PIPING AND STACKS AS REQUIRED, REFER TO M.E.P. DRAWINGS FORMORE INFORMATION.
12
12
12
12
13REMOVE STEEL FLUE PIPE AND METAL SUPPORT BRACKETS, PATCH EXISTINGMASONRY AS REQUIRED AT REMOVED BRACKETS.
13
14
14 REMOVE EXISTING WINDOW AND WOOD TRIM.
1
15
15
TYP.
15
TYP.
15
TYP.
15
TYP.
15
TYP.
15
TYP.
XXX
XCONSTRUCTION PLAN KEYED NOTES (THIS PLAN ONLY)
1HISTORIC CLOCK TO REMAIN, REPLACE MISSING GLASS LENS ON SOUTHSIDE. PROTECT DURING DEMOLITION AND CONSTRUCTION PROCESS
2
16REMOVE WOOD DOOR AND RETAIN DOOR FOR POSSIBLE INSTALLATION AT NEWLOCATION. EXISTING DOOR FRAME AND TRANSOM TO REMAIN.
16
HISTORIC TERRAZZO FLOORING AND BASE, RESTORE ANY DAMAGED AREASIF ANY, SCRUB CLEAN, POLISH AND SEAL AS REQUIRED FOR LIKE NEWAPPEARANCE.
1
3HISTORIC CORRIDOR TO BE PRESERVED; REPAIR ANY DAMAGED PLASTERWALLS AND CEILINGS TO MATCH ADJACENT FINISHES.
PRESERVEHISTORICCHALK BD.
17
17TYP.
2
TYP.2
TYP.3
4HISTORIC STAIRS TO BE PRESERVED; REPAIR ANY DAMAGED PLASTER WALLSAND CEILINGS TO MATCH ADJACENT FINISHES. CLEAN REPAINT WINDOWFRAMES AT NORTH ELEVATION
4
5
5 HISTORIC CHALK BOARD TO BE PRESERVED, CLEAN/ SAND WOOD FRAME ASREQUIRED AND REPAINT. USE ELEMENTS FROM DEMO BOARDS IF REQ'D.
6 HISTORIC CORRIDOR DOOR TO BE PRESERVED; REPAIR DOOR AND FRAME ASREQUIRED. REFER TO DOOR SCHEDULE FOR MORE INFORMATION.
6
69
6
6
6
9 7
7 HISTORIC DOOR FRAME AND TRANSOM TO BE PRESERVED; REPAIR DOORFRAME AND TRANSOM IF REQUIRED. FILL HINGE POCKETS, LATCH HOLES,ETC. AND REFINISH FRAME TO MATCH EXISTING FINISH. SEE DOOR SCHED.
8
8EXISTING ENTRY AND STEPS, RESTORE TO HISTORIC CONDITION-SEE DETAILS 1 THRU 4 SHEET A3.2.
2
REMOVE LOOSE DELAMINATING OR DAMAGED PLASTER AT EXTERIOR WALLSAND PREP AS REQUIRED FOR NEW PLASTER FINISH (FEILD VERIFY CONDITIONS).
8
9 HISTORIC DOOR WITH SWING REVERSED AS SHOWN, PREP EXISTING FRAMEFOR NEW SWING/ HARDWARE. REFER TO DOOR SCHEDULE.
1 PATCH AND REPAIR ALL EXISTING PLASTER CEILINGS ASREQUIRED TO MATCH EXISTING FINISH, PAINT AS SCHEDULED.
TYP.1
TYP.1
TYP.1
TYP.1
TYP.1
TYP.1
TYP.1
TYP.1
2 PATCH IN AND REPAIR EXISTING HISTORIC CEILING MOLDINGSAT EXTERIOR WALLS AND AT HISTORIC CORRIDOR ATDEMOLISHED PARTITIONS OR AS REQUIRED TO MATCH EXISTINGCLEAN AND PAINT.
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.2
TYP.1
TYP.1
TYP.2
XCEILING PLAN KEYED NOTES (THIS PLAN ONLY)
10HISTORIC WOOD BASE MOLDINGS AND WALL RAIL TRIM TO BE PRESERVED,TYPICAL AT EXTERIOR WALL AND CLASSROOM SIDE OF HISTORIC CORRIDOR.
10TYP.
10TYP.
10TYP.
10TYP.
10TYP.
10TYP.
10TYP.
10TYP.
10TYP.
REVERSEDR. SWING
3
6
DEMOLISHED PARTITION/ CONSTRUCTION
EXISTING PARTITION/ CONSTRUCTION
NEW PARTITION
NEW OR EXISTING (1) HOUR RATED PARTITION
NEW OR EXISTING (2) HOUR RATED PARTITION
PLAN LEGEND 2x4 LAY-IN FLUORESCENT LIGHT FIXTURE
2x4 ACOUSTICAL PANEL CEILING SYSTEM (APC)
DIRECT/ INDIRECT FLUORESCENTLIGHT FIXTURE
SURFACE MOUNTED OR PENDENTTYPE LIGHT FIXTURE
COMPACT FLUORESCENT CAN LIGHT FIXTURE
1x4 SURFACE MOUNTED OR SUSPENDEDFLUORESCENT STRIP TYPE LIGHT FIXTURE
PARTITION WITH ACOUSTICAL BATTS
1. REFER TO GENERAL NOTES AND CUTTING AND PATCHING NOTESSHEET A2.1 FOR MORE INFORMATION.
2. ALL PLASTER WALLS AND CEILINGS TO REMAIN EXPOSED TO VIEW INNEW CONSTRUCTION ARE TO BE VISUALLY INSPECTED, REMOVESPALLED OR LOOSE PLASTER FINISHES AND REMOVE ANY PEELINGPAINT AND PREP WALLS AND CEILINGS AS REQUIRED FOR PLASTERREPAIR WORK.
3. HARDWOOD FLOORS; ANY AREAS FOUND TO BE UN-SOUND ORDAMAGED ARE TO BE PATCHED AS REQUIRE TO RECEIVE NEWUNDERLAYMENT / FINISHES FLOOR MATERIAL AS SCHEDULE.
1. ALL EXISTING INTERIOR AND EXTERIOR PLASTER WALLS EXPOSEDTO VIEW IN NEW CONSTRUCTION ARE TO BE PATCHED, REPAIREDAND RESTORED TO ORIGINAL WALL FINISH AND TEXTURE ASREQUIRED, FIELD VERIFY EXTENT OF WORK.
2. PROTECT ALL HISTORIC BUILDING ELEMENTS TO REMAIN DURINGTHE DEMOLITION AND CONSTRUCTION PROCESS, TYP.
3. ALL EXISTING WINDOWS AND WOOD WORK ARE TO BE INSPECTEDAND REPAIRED AS REQ'D. WOOD FRAMES, STOOLS AND TRIM ARETO BE PAINTED AS SCHEDULED. SEE TYP. DETAIL 2/A8.1
1
18 REMOVE EXIST'G DOOR AND FRAME
18
19 REMOVED WOOD CASED DOOR OPENINGS AT WALL TO REMAIN
19 19
18
REVERSEDR. SWING
20
20 REMOVED WOOD DOORS, FRAMES AND SIDELITES AT FRONT ENTRY,WOOD VERTICAL HISTORIC MULLIONS TO REMAIN- SEE DETAIL 3/A3.2
21 REMOVE EXIST'G INFILL CONSTRUCTION AT PREVIOUSLYDEMOLISHED WINDOWS FOR NEW MASONRY BEARING CONSTR.
21 21
22
REMOVE WINDOW AC. UNIT AND METAL COMPOSITE PANEL SET INEXIST'G ALUM. WINDOW SASH FRAME, FRAME TO REMAIN.
22 REMOVE EXIST'G INFILL CONSTRUCTION AT PREVIOUSLYDEMOLISHED WINDOW AS REQ'D FOR NEW ALUM. WINDOW.ORIGINAL WOOD WINDOW FRAME IS TO REMAIN.
23
22
REMOVEAC UNITAND WOODSHELVING
23
11NEW STEEL PIPE HANDRAILS, CORE DRILL POST INTO STONE STEPS ORCONCRETE, SET IN NONE SHRINK GROUT.
11
12EXISTING STONE STEPS, MUD-JACK AND SEAL JOINTS AS REQ'D-SEE DETAIL 4/A3.2
12
13PROVIDE NEW 8" CMU FILL WITH PLASTER FINISH TO MATCH ADJACENTWALLS AT EXISTING WINDOW OPENINGS
14
13
1. EXISTING PLASTER CEILINGS TO REMAIN EXPOSED TO VIEWARE TO BE RESTORED TO ORIGINAL FINSIH AND ANY LOOSEOF PEELING PAINT IS TO BE REMOVE AS REQUIRED FORPLASTER REPAIR AND NEW PAINT FINISH.
3
3
3
15 PROVIDE SOUND BATTS IN NEW PARTITIONS AT MECHANICAL ROOM
15
15
1
44
4REPAIR COVED PLASTER CEILING AND TRIM TO ORIGINAL CONDITIONAS REQUIRED AT DEMOLISHED PLUMBING - PAINT AS SCHED..
EXISTING WINDOWS THIS AREA TO BE PROTECTED WITHWATER CURTAIN TO ACHIEVE (1) HOUR RATING .5
5
6
TRANSOM WOOD WORK STRIPPED, CLEANED AND REPAINTED6
16 BRICK VENEER INFILL TO MATCH EXIST'G OVER 5/8" DENSGLAS 3-5/8"METAL STUDS W/ INSULATION AND 5/8" GYP. BD. AT INTERIOR SIDE.PROVIDE SILL FLASHING AND WEEPS AS REQUIRED.
16
REMOVE WINDOW AC. UNIT AND METAL COMPOSITE PANEL SET INEXIST'G ALUM. WINDOW SASH FRAME, FRAME TO REMAIN.
PROVIDE & INSTALL NEW CLEAR INSULATED GLASS IN EXISTINGALUMINUM WINDOW SASH AS REQ'D TO MATCH EXISTING GLAZING.FIELD VERIFY SIZES AND EXIST'G CONDITIONS.
24
24
17
17 HISTORIC CORR; REMOVE ALL SURFACE MOUNTED ELECTRICAL CONDUITS,J-BOXES, LIGHT FIXTURES, ETC. REFER TO M.E.P. DWGS FOR MORE INFORMATION.PLASTER WALLS AND CEILINGS, TRIM, AND DOORS ARE TO BE PRESERVED U.N.O.
14PROVIDE NEW STEEL LINTELS AS REQUIRED AT NEW DOOR OPENINGREFER TO STRUCTURAL DWGS FOR MORE INFORMATION.
1725
REMOVE ALUM. SINGLE HUNG WINDOW, RETAIN FOR INSTALLATIONAT NEW LOCATION- REFER TO CONSTRUCTION PLAN.25
25
NEW MECHANICAL LOUVER IN EXISTING WOOD WINDOW FRAME.INSTALL WEATHER TIGHT .18
18
18
RELOCATED ALUM. SINGLE HUNG WINDOW IN EXISTING WOODWINDOW FRAME. PROVIDE BREAK METAL CLADDING AT EXTERIOR OFWOOD FRAME TO MATCH EXIST'G INSTALLED CONDITIONS, INSTALLWEATHER TIGHT .
19
1919
NEW SUSPENDED ACOUSTICAL PANEL CEILING SYSTEM. SEEDETAILS A, B, & C/A8.1
Client: starbucksLocation: Multiple site adaptations
program: drive-thru starbucks primary structure= shipping containersoffice kitchen restroom storage service areas
brief: dd + cd drawing sets material researchconsultant coordination3-d modeling
The prototype for this project utilized shipping containers as the primary structure and adapted scales, orientations and materials to become site specific .
STARBUCKSPROTOTYPE
24
Exterior Elevation Notes
A. General Contractor to coordinate and schedule signageinstallation with the Signage Contractor providing a minimumscheduling notice of 4 weeks and 1 week prior to scheduleddate of installation. Starbucks Construction Manager toprovide General Contractor with Signage Contractor contactinformation.
B. General Contractor shall coordinate with ElectricalContractor to furnish and install electrical circuits includingall conduit, wire, connections, and breaker at panel boardnecessary to serve Signage.
C. General Contractor to provide fire treated wood studblocking, or equivalent to support Signage.
D. Signage Contractor shall verify size and location of anyand all allowable monument or pole signage with landlordand provide shop drawing(s) prior to fabrication to StarbucksDesigner for approval.
E. Signage Contractor to install signage in compliance withlocal codes ad obtain permit and landlord approval.
F. Signage Contractor to supply shop drawings to StarbucksConstruction Manager and to the General Contractor asneeded. General Contractor to notify Starbucks ConstructionManager immediately if shop drawings or installation is indiscrepancy with Starbucks architectural drawings.
Sheet Notes
1. Provide 3" (75mm) high black acrylic store address onglazing.
Exterior Elevation Keyed Notes
1. Electrical / CT panels; Refer to Electrical.2. Reclaimed Wood Rain Screen3. Expanded metal / steel art panel. Final design to be determined.4. 1" x 6" Steel angle (Paint Black)5. Pass Off shelf.6. Steel plate surround(at all horizontal windows); Paint black.7. Steel channel (Paint black)8. Exterior Signage by Others.9. Conduit Head10. 3" Down Spout11. Metal Mesh Panels and Graphics by others.12. Air Curtain. Ref. to Mechanical
A. STONE VENEER,VERSETTA STONE, #2022 PLUM CREEK
B. PAINTED STUCCO, BENJAMIN MOORE. #OC-88, INDIAN WHITE.
C. PAINTED STUCCO, BRUNING PAINT CO. #8552, SWISS CREAM.
D. CORNICES, TRIM 1 BENJAMIN MOORE. #OC-45, SWISS COFFEE.
E. PAINTED WOOD OR PAINTED FAUX CORBELS, STUCCO ACCENTS TRIM 2. BRUNING PAINT CO. #8765, SHADY SIDE.
NOTE:COLOR & MATERIALS PER ROSEVILLE DRP 03-03CONDITIONS OF APPROVAL. NOT ALL COLORS &MATERIALS USED ON THIS PROJECT.
SIGNAGE IS FOR REFERENCE ONLY, ANDIS BY OTHERS UNDER SEPERATE PERMIT.
MATERIALS LEGEND
Level 10' - 7 1/4"
Level 29' - 6"
T.O. SLAB0' - 0"
T.O. CORNICE19' - 8"
B.O. WDW3' - 4 1/4"
6" HIGH TRIM15' - 6"
STONE BASE2' - 0"
STUCCO PANEL ( MATCHTAN COLOR ON ADJ.SHOPPING CENTER STUCCO)
3/4" X 2" FRY REGLET(PAINT BLACK)
STUCCO PANEL (RUST -TO MATCH EXISTING)
CANOPYSUPPORT
WIRE MESH PANEL
STAINLESS STEEL SHELF
METALAWNING
STUCCO PANEL (RUST - TO MATCH EXISTING)
PICK-UPWINDOWCANOPY
VERSETTA VENEER;MATCH EXISTING BUILDINGS
A
DEC
6"
6" Typ.
WOOD TRELLIS
C
12" H. ILLUM. LETTERS, STACKED(TEST FIT) EXTERIOR SIGNAGE BY OTHERS
Level 10' - 7 1/4"
Level 29' - 6"
T.O. SLAB0' - 0"
T.O. CORNICE19' - 8"
B.O.W5' - 0"
CL OF SIGN17' - 1 9/16"
T.O. DRIVE THRU18' - 5 7/32"
6" HIGH TRIM15' - 6"
STONE BASE2' - 0"
STEEL PLATE SURROUND- PAINT BLACK (MATCH PMSFC -TYP. ALL WINDOWS)
3/4" X 2" FRY REGLET(PAINT BLACK)
STUCCO PANEL(MATCH COLOR AND TEXTURE ON ADJ.SHOPPING CENTER STUCCO)
STEEL CHANNEL - PAINT BLACK (MATCH PMSFC)
STUCCO PANEL(MATCH COLOR AND TEXTURE ON ADJ.SHOPPING CENTER STUCCO)
FOAM CORNICE TYP.
36" ILLUM LOGO DISC(SIGNAGE BY OTHERS)
CANOPY SUPPORT
SIGNAGE BYOTHERS
3
A-501
STONE VENEER;MATCH EXISTING BUILDINGS
DEC
A
SURFACEMOUNTED LIGHTFIXTURE
SURFACE MOUNTEDLIGHT FIXTURE
6" Typ.
C
62" SIGNAGE BY OTHERS
PIN MOUNTED SIGNAGE BY OTHERS
3/4" X 2" FRY REGLET BETWEEN STUCCO PANEL AND STONE(PAINT BLACK)
Project Team:
StructuralEngineer:
Mech, Elec, Plum,Fire ProtectionEngineer:
Office: 319 North 4th StreetSuite 1000St. Louis, Missouri 63102
Project Number:
Drawn By:
Issue Date:
Sheet Number:
Sheet Title:
Professional Seal:
PR
OJE
CT
DE
SC
RIP
TIO
N
LG v
1.3
The Professional Architect's seal affixed to this sheetapplies only to the material and items shown on thissheet. All drawings, instruments or other documents notexhibiting this seal shall not be considered prepared bythis architect, and this architect expressly disclaims anyand all responsibility for such plans, drawings ordocuments not exhibiting this seal.
This drawing and details on it are the sole property of thearchitect and may be used for this specific project only.It shall not be loaned, copied or reproduced, in whole orpart, or for any other purpose or project without thewritten consent of the architect.
p 314.231.5700f 314.231.0816
Project Title:
0 CONSTRUCTION 11-15-12
11
/16
/20
12
3:0
9:5
9 P
M\\
stls-f
s0
2\lgd
ata
\LG
Pro
jects
\20
12\1
21
77
SG
Sta
rbucks C
onta
iner
Dri
ve
Th
r uS
tore
s\1
21
77
_B
IM\1
217
7_
Loca
l_R
osevill
e\1
27
11 S
BX
Ro
se
vill
e [sa
ue
r3].rv
t
Sturctural Affiliates Intl.95 Whtie Bridge Rd., Sutie 222Nashville, TN 37205615.269.0069
Michael Peterson, P.E.
PO Box 159311Nashville, TN 37215615.417.8779
12177.02
SF, MP, SA
EXTERIORELEVATIONS
A-201
Novem
ber
15, 2012 -
100%
Constr
uction D
ocum
ents
Sta
rbucks -
Rosevill
e
11.15.12
3/8" = 1'-0"3
EXTERIOR ELEVATION ROSEVILLESOUTH
3/8" = 1'-0"2
EXTERIOR ELEVATION ROSEVILLE EAST
No. Description Date
west elevation
�
6"6"
5I-501
1
12
1
12
5I-501
New Door Frame
Resilient Flooring
(E) Floor & Structure
Fibrous BreakConcrete perCivil Drawings
21Slope
0' -
0 1
/2"
max.
Aluminum Threshold
ResilientFlooring
(E) Floors & Structureper Structural
ma
x.
0' -
0 1
/4"
4 " METAL STUDS W/ SPRAYFOAM INSUL. (R-22 MIN.)
METAL FLASHING
"Z" CLIP FASTENERS
STUCCO PANEL CEMENT BOARD
TYVEK ON 1/2" PLYWOOD
6" HSS TUBE
6" HSS TUBE
STEEL ANGLE
GRADE
RIGID INSULATION
3/4" PLYWOOD
2" METAL DECK
FRP ON 1/2" PLYWOOD
SEAL
MEMBRANE ROOFING
TAPERED INSULATION
2" METAL DECK
STEEL ANGLE
RECOVERY BOARD
DECK: (FACTORY INSTALL)EPDM ON 1/2" RECOVERYBOARD ON 3/4" PLYWOOD ON 5" STEEL CHANNELS
SADDLE: (FIELD INSTALL)EPDM ON 1/2" RECOVERYBOARD ON 3/4" PLYWOOD FRAMING
6" RIGID INSULATION(BETWEEN BOTTOM OFPURLINS TO GRADE)
6" SPRAY FOAM INSULATION(CONTINUOUS)
ALUMINUM THRESHOLD(CONTINUOUS)
CONCRETE FOOTING
RESILIENTFLOORING
SUSPENDEDCEILING GRID
MYLAR COATEDCEILING TILES
HSS 6X2X1/4
INFILL SPRAYFOAM INSUL INFIELD AROUNDBOLTEDCONNECTION
CANTILEVERED 5"STEEL CHANNELS
METAL FLASHING
R-38 SPRAY FOAM INSULATION(CONTINUOUS)
Project Team:
StructuralEngineer:
Mech, Elec, Plum,Fire ProtectionEngineer:
Office: 319 North 4th StreetSuite 1000St. Louis, Missouri 63102
Project Number:
Drawn By:
Issue Date:
Sheet Number:
Sheet Title:
Professional Seal:
PR
OJE
CT
DE
SC
RIP
TIO
N
LG v
1.3
The Professional Architect's seal affixed to this sheetapplies only to the material and items shown on thissheet. All drawings, instruments or other documents notexhibiting this seal shall not be considered prepared bythis architect, and this architect expressly disclaims anyand all responsibility for such plans, drawings ordocuments not exhibiting this seal.
This drawing and details on it are the sole property of thearchitect and may be used for this specific project only.It shall not be loaned, copied or reproduced, in whole orpart, or for any other purpose or project without thewritten consent of the architect.
p 314.231.5700f 314.231.0816
Project Title:
0 CONSTRUCTION 11-15-12
11
/16
/20
12
12
:31
:13
PM
\\stls-f
s0
2\lgd
ata
\LG
Pro
jects
\20
12\1
21
77
SG
Sta
rbucks C
onta
iner
Dri
ve
Th
r uS
tore
s\1
21
77
_B
IM\1
217
7_
Loca
l_R
osevill
e\1
27
11 S
BX
Ro
se
vill
e [sa
ue
r3].rv
t
Sturctural Affiliates Intl.95 Whtie Bridge Rd., Sutie 222Nashville, TN 37205615.269.0069
Michael Peterson, P.E.
PO Box 159311Nashville, TN 37215615.417.8779
12177.02
SF, MP, SA
BUILDING SECTIONS
A-402
Novem
ber
15, 2012 -
100%
Constr
uction D
ocum
ents
Sta
rbucks -
Rosevill
e
11.15.12
1 1/2" = 1'-0"2
Exterior Door Threshold Detail 1 1/2" = 1'-0"
3Floor Butt Detail
1" = 1'-0"1
Section at Connection
No. Description Date
Exterior Elevation Notes
A. General Contractor to coordinate and schedule signageinstallation with the Signage Contractor providing a minimumscheduling notice of 4 weeks and 1 week prior to scheduleddate of installation. Starbucks Construction Manager toprovide General Contractor with Signage Contractor contactinformation.
B. General Contractor shall coordinate with ElectricalContractor to furnish and install electrical circuits includingall conduit, wire, connections, and breaker at panel boardnecessary to serve Signage.
C. General Contractor to provide fire treated wood studblocking, or equivalent to support Signage.
D. Signage Contractor shall verify size and location of anyand all allowable monument or pole signage with landlordand provide shop drawing(s) prior to fabrication to StarbucksDesigner for approval.
E. Signage Contractor to install signage in compliance withlocal codes ad obtain permit and landlord approval.
F. Signage Contractor to supply shop drawings to StarbucksConstruction Manager and to the General Contractor asneeded. General Contractor to notify Starbucks ConstructionManager immediately if shop drawings or installation is indiscrepancy with Starbucks architectural drawings.
Sheet Notes
1. Provide 3" (75mm) high black acrylic store address onglazing.
Exterior Elevation Keyed Notes
1. Electrical / CT panels; Refer to Electrical.2. Reclaimed Wood Rain Screen3. Expanded metal / steel art panel. Final design to be determined.4. 1" x 6" Steel angle (Paint Black)5. Pass Off shelf.6. Steel plate surround(at all horizontal windows); Paint black.7. Steel channel (Paint black)8. Exterior Signage by Others.9. Conduit Head10. 3" Down Spout11. Metal Mesh Panels and Graphics by others.12. Air Curtain. Ref. to Mechanical
A. STONE VENEER,VERSETTA STONE, #2022 PLUM CREEK
B. PAINTED STUCCO, BENJAMIN MOORE. #OC-88, INDIAN WHITE.
C. PAINTED STUCCO, BRUNING PAINT CO. #8552, SWISS CREAM.
D. CORNICES, TRIM 1 BENJAMIN MOORE. #OC-45, SWISS COFFEE.
E. PAINTED WOOD OR PAINTED FAUX CORBELS, STUCCO ACCENTS TRIM 2. BRUNING PAINT CO. #8765, SHADY SIDE.
NOTE:COLOR & MATERIALS PER ROSEVILLE DRP 03-03CONDITIONS OF APPROVAL. NOT ALL COLORS &MATERIALS USED ON THIS PROJECT.
SIGNAGE IS FOR REFERENCE ONLY, ANDIS BY OTHERS UNDER SEPERATE PERMIT.
MATERIALS LEGEND
Level 10' - 7 1/4"
Level 29' - 6"
T.O. SLAB0' - 0"
T.O. CORNICE19' - 8"
B.O. WDW3' - 4 1/4"
6" HIGH TRIM15' - 6"
STONE BASE2' - 0"
STUCCO PANEL ( MATCHTAN COLOR ON ADJ.SHOPPING CENTER STUCCO)
3/4" X 2" FRY REGLET(PAINT BLACK)
STUCCO PANEL (RUST -TO MATCH EXISTING)
CANOPYSUPPORT
WIRE MESH PANEL
STAINLESS STEEL SHELF
METALAWNING
STUCCO PANEL (RUST - TO MATCH EXISTING)
PICK-UPWINDOWCANOPY
VERSETTA VENEER;MATCH EXISTING BUILDINGS
A
DEC
6"
6" Typ.
WOOD TRELLIS
C
12" H. ILLUM. LETTERS, STACKED(TEST FIT) EXTERIOR SIGNAGE BY OTHERS
Level 10' - 7 1/4"
Level 29' - 6"
T.O. SLAB0' - 0"
T.O. CORNICE19' - 8"
B.O.W5' - 0"
CL OF SIGN17' - 1 9/16"
T.O. DRIVE THRU18' - 5 7/32"
6" HIGH TRIM15' - 6"
STONE BASE2' - 0"
STEEL PLATE SURROUND- PAINT BLACK (MATCH PMSFC -TYP. ALL WINDOWS)
3/4" X 2" FRY REGLET(PAINT BLACK)
STUCCO PANEL(MATCH COLOR AND TEXTURE ON ADJ.SHOPPING CENTER STUCCO)
STEEL CHANNEL - PAINT BLACK (MATCH PMSFC)
STUCCO PANEL(MATCH COLOR AND TEXTURE ON ADJ.SHOPPING CENTER STUCCO)
FOAM CORNICE TYP.
36" ILLUM LOGO DISC(SIGNAGE BY OTHERS)
CANOPY SUPPORT
SIGNAGE BYOTHERS
3
A-501
STONE VENEER;MATCH EXISTING BUILDINGS
DEC
A
SURFACEMOUNTED LIGHTFIXTURE
SURFACE MOUNTEDLIGHT FIXTURE
6" Typ.
C
62" SIGNAGE BY OTHERS
PIN MOUNTED SIGNAGE BY OTHERS
3/4" X 2" FRY REGLET BETWEEN STUCCO PANEL AND STONE(PAINT BLACK)
Project Team:
StructuralEngineer:
Mech, Elec, Plum,Fire ProtectionEngineer:
Office: 319 North 4th StreetSuite 1000St. Louis, Missouri 63102
Project Number:
Drawn By:
Issue Date:
Sheet Number:
Sheet Title:
Professional Seal:
PR
OJE
CT
DE
SC
RIP
TIO
N
LG v
1.3
The Professional Architect's seal affixed to this sheetapplies only to the material and items shown on thissheet. All drawings, instruments or other documents notexhibiting this seal shall not be considered prepared bythis architect, and this architect expressly disclaims anyand all responsibility for such plans, drawings ordocuments not exhibiting this seal.
This drawing and details on it are the sole property of thearchitect and may be used for this specific project only.It shall not be loaned, copied or reproduced, in whole orpart, or for any other purpose or project without thewritten consent of the architect.
p 314.231.5700f 314.231.0816
Project Title:
0 CONSTRUCTION 11-15-12
11
/16
/20
12
3:0
9:5
9 P
M\\
stls-f
s0
2\lgd
ata
\LG
Pro
jects
\20
12\1
21
77
SG
Sta
rbucks C
onta
iner
Dri
ve
Th
r uS
tore
s\1
21
77
_B
IM\1
217
7_
Loca
l_R
osevill
e\1
27
11 S
BX
Ro
se
vill
e [sa
ue
r3].rv
t
Sturctural Affiliates Intl.95 Whtie Bridge Rd., Sutie 222Nashville, TN 37205615.269.0069
Michael Peterson, P.E.
PO Box 159311Nashville, TN 37215615.417.8779
12177.02
SF, MP, SA
EXTERIORELEVATIONS
A-201
Novem
ber
15, 2012 -
100%
Constr
uction D
ocum
ents
Sta
rbucks -
Rosevill
e
11.15.12
3/8" = 1'-0"3
EXTERIOR ELEVATION ROSEVILLESOUTH
3/8" = 1'-0"2
EXTERIOR ELEVATION ROSEVILLE EAST
No. Description Date
east elevation
section thru shipping container structure
maintain healthy relationships[figure 01]its critical to maintain a healthy relationship with other consultants and co-workers. utilize these relationships as resources when needing assistance on unfamiliar subjects. critical net-works can be established with design team mem-bers.
dont be afraid to ask questions [figure 02]An internship is a combination of an educational experience and real world applications. There is always a unique situation to every project. dis-covering answers is a self-motivated explora-tion, and asking questions should enhance this search. asking questions is critical to solving problems and enhances comprehension.
take initative + learn [figure 03]search for opportunities to make an impression, provide input and ask tough questions. exhibit unique talents and take on new responsibilities.
have fun [figure 04]involve yourself in the work community and the surrounding area. indulge in social work groups and be yourself.
reflection
fig. 01 fig. 02 fig. 04fig. 03
thanks to the lawrence group for the wonderful experience
and opportunities. - sam