the integration of the lithuanian power system into the european power system
DESCRIPTION
The Integration of the Lithuanian Power System into the European Power System. Vidmantas Gru sas , CEO of LITGRID UAB 01/06/2010. Introductions of the Lithuanian TSO – LITGRID BEMIP – the Baltic Energy Market Interconnection Plan BEMIP: Electricity market integration - PowerPoint PPT PresentationTRANSCRIPT
The Integration of the Lithuanian Power System into the European Power System
Vidmantas Grusas, CEO of LITGRID UAB01/06/2010
1
Contents
2
1. Introductions of the Lithuanian TSO – LITGRID
2. BEMIP – the Baltic Energy Market Interconnection Plan
3. BEMIP: Electricity market integration
4. BEMIP & TYNDP – the Ten-Year Network Development Plan
5. BEMIP: Electricity interconnections – Strategic Projects
6. Conclusions
Structure of LITGRID
3
Transmission grid today
4
Key activities of LITGRID
5
Dispatch control of electricity system
Maintenance and development of electricity transmission grid (110- 330 kV)
Ensuring the reliability of power system operation
Operational planning
Strategic objectives of our activity
6
Reliable and safe electricity supply to the Lithuanian consumers
Integration into the electricity market of the Baltic Sea region
Readiness for the implementation of the Third Energy Package of the European Union
Technological development based on a scientific progress
Modern and efficient management and social liability
BEMIPBaltic Energy Market Interconnection Plan
7
Start of the Baltic market integration
FR
ESPT
CONTINENTALSOUTH WEST
DE
FR
IT
CH AT
CONTINENTALCENTRAL SOUTH
PLDE
AT
CZ
ROHU
SK
RS
HU
IT
SI RO
BA
HR
BG
GR
MK
CONTINENTALCENTRAL EAST
CY
SI
SIHR
CONTINENTALSOUTH EAST
DE
NO
EE
LV
LT
PL
DK
SE
FI
BALTIC SEA
NI
GBNL
DE
FR
DK
NO
BE
RoI
LU
NORTH SEA
ME
FR
ESPT
CONTINENTALSOUTH WEST
DE
FR
IT
CH AT
CONTINENTALCENTRAL SOUTH
PLDE
AT
CZ
ROHU
SK
RS
HU
IT
SI RO
BA
HR
BG
GR
MK
CONTINENTALCENTRAL EAST
CY
SI
SIHR
CONTINENTALSOUTH EAST
DE
NO
EE
LV
LT
PL
DK
SE
FI
BALTIC SEA
NI
GBNL
DE
FR
DK
NO
BE
RoI
LU
NORTH SEA
ME
• 2008, Initiator European Commission President J. M. Barroso – EC
• 2009, set a High Level Group
• June 2009, release of the Baltic Energy Market Interconnection Plan
• 17 June 2009, signed the Memorandum of Understanding on the BEMIP by its 9 members
BEMIP goals
The two main goals of the BEMIP initiative, within the context of the EU's 20/20/20 objectives are:
- the full integration of the three Baltic States into the European energy market, through
- the strengthening of the interconnections with their EU neighboring countries.
BEMIP (Action Plan) covers the following 3 areas:
10
Electricity market integrationElectricity market integration
Electricity interconnections and generationElectricity interconnections and generation
Gas internal market and infrastructureGas internal market and infrastructure
Electricity Market integration
• Access to the consumer to choose freely whether to change electricity supplier
• Competition among power producers, importers and suppliers
• Abolish restrictions on the marketing power of the EU countries
• Conditions of the clear trading of electricity imported from outside the EU
• Clear organization of the market and supervisory mechanisms under the Nord Pool practice
Integration of the regions Nord Pool
+ Lithuania, Latvia, Estonia,
Poland, Germany
Market peculiarities of the Baltic sea region (BSR) countries
• BSR countries have extensive access and trade with non-EU countries
• In order to establish the Common Baltic electricity market the following issues should be addressed:
– congestion management mechanism
– transit compensation mechanism
– common position for trading with non-EU countries
Market establishment stages
13
NO
RD
PO
OL
PX
Polish PXGielda Energii
Estlink I
Polish PXGielda Energii
Estlink IIEstlink I
Swedish-Baltic
link LitPollink
NO
RD
PO
OL
PX
Polish PXGielda Energii
Common Baltic
electricity market
Estlink I
2009
Isolated Baltic electricity market
2010 - 2013
Single market of the Baltic States
2014 - 2015
Integration of the Baltic States electricity market
in the Nordic and continental European
electricity markets
Common Baltic
electricity market
Electricity interconnections and generation
14
BEMIP & TYNDP* Investments and strategic projects
* Ten-Year Network Development Plan
15
Background for TYNDP
16
TYNDP is a forward-looking (5–15 years) plan for electricity transmission infrastructure investments, updated every 2 years
Mandate for TYNDP is given to ENTSO-E by 3rd Legislative Energy Package (Reg. 714/2009, Art 8.3)
Objectives: - raising transparency of electricity transmission grid- support decision-making process at regional & European level
BEMIP projects in the TYNDP
17
TYNDP BEMIP
Investments into electricity transmission and generation
18
0
100.000
200.000
300.000
400.000
500.000
600.000
700.000
800.000
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Synchronous connection to ECN
Development of Transmission Grid related with the construction of New Nuclear Power Plant
Construction of Lithuania - Poland interconnection
Construction of Lithuania - Sweden interconnection
IT systems and technologies
Reconstruction and Development of Transmission Grid
mln. LTL
The Baltic Sea projects – statistics
19
FR
ESPT
CONTINENTALSOUTH WEST
DE
FR
IT
CH AT
CONTINENTALCENTRAL SOUTH
PLDE
AT
CZ
ROHU
SK
RS
HU
IT
SI RO
BA
HR
BG
GR
MK
CONTINENTALCENTRAL EAST
CY
SI
SIHR
CONTINENTALSOUTH EAST
DE
NO
EE
LV
LT
PL
DK
SE
FI
BALTIC SEA
NI
GBNL
DE
FR
DK
NO
BE
RoI
LU
NORTH SEA
ME
FR
ESPT
CONTINENTALSOUTH WEST
DE
FR
IT
CH AT
CONTINENTALCENTRAL SOUTH
PLDE
AT
CZ
ROHU
SK
RS
HU
IT
SI RO
BA
HR
BG
GR
MK
CONTINENTALCENTRAL EAST
CY
SI
SIHR
CONTINENTALSOUTH EAST
DE
NO
EE
LV
LT
PL
DK
SE
FI
BALTIC SEA
NI
GBNL
DE
FR
DK
NO
BE
RoI
LU
NORTH SEA
ME
0
2
4
6
8
10
12
14
16
bn
€
BALTIC SEA
41%mid term
59%long term
82%
18%
AC > 300 kV 11591 km
99%
Total projects BS 17846 km
DC 5301 km
AC < 300 kV 954 km
new
upgrade
Strategic projects
20
Lithuanian–Polish interconnection project LitPol Link
Lithuanian–Swedish interconnection project NordBalt
Interconnection of Baltic power systems for synchronous operation with the ECN
Development plan in the Baltic Sea Region
Krievija
Ukraina
BaltkrievijaPolija
Čehija
Vācija
Lietuva
Latvija
Igaunija
Somija
Norvēģija
Dānija
Zviedrija
NORDEL
ENTSO-E/
Russia
BelorusPoland
Czech
Germany
Lithuania
Latvia
Estonia
Finland
Norway
Denmark
Sweden
IPS/UPS
NORDEL
CONTINENTAL Europe
ESTLINK 1 & 2 350 MW + 650 MW
Lithuania - Sweden700 MW
Lithuania – Poland
1000 MW
21
Lithuanian–Polish interconnection LitPol Link project
22
Project progress
23
Progress
• Preparation of territorial planning documents for 400 kV transmission line• Preparation of environmental impact assessment in Lithuania and Poland• Technical feasibility study for back-to-back station, 400kV substation, extension of 330kV substation• Investment realization and operation model of the interconnection
Further work
• Environmental impact assessment in Lithuania and Poland• Preparation of territorial planning documents for 400 kV transmission line• Land ownership issues• Preparation of the technical project for the line, substation, back-to-back station• Permits and licensing issues• Construction of interconnection
Lithuanian–Swedish interconnection project NordBalt
24
Project progress
•Preparation of territorial planning documents for interconnection on land•Lithuanian and Swedish TSOs signed an agreement on implementation of investment•EC granted financial EU assistance to the project EUR 131 million from EEPR program•Baltic seabed survey works completed•Selected VSC (Voltage Source Converter) technology for interconnection•Preparation of the technical specifications for cable and converter stations
25
Progress
Further work
•Preparation of territorial planning documents on land in Lithuania and Sweden
•Land ownership issues•Tender for supply of cable and
converter stations• Preparation of technical project
for interconnection• Permits and licensing issues• Construction of interconnection
Interconnection of the Baltic power systems
for synchronous operation with ECN
Strategic objective of the Baltic States –
to interconnect power systems of the Baltic States for synchronous
operation with European Continental Network (ECN)
26
ENTSO-E regions plan
Project information
• If this financial support is received, feasibility study will be started in January, 2011 and will be finished by December, 2012. The completed study should provide possible technical solutions regarding interconnection of the Baltic power systems for synchronous operation with ECN.
• In January, 2010 a meeting of six TSOs of ENTSO-E (PSE-Operator, Amprion, Transpower, Elering, LITGRID, Augstsprieguma Tikls) was held where it was agreed among the transmission system operators to implement a feasibility study.
• In April, 2010 Baltic (LT, LV, EE) transmission system operators, in compliance with PL and DE operators, prepared and presented a new application for the financial support regarding the interconnection study “Feasibility study on interconnection variants for the integration of the Baltic States to the EU Internal Electricity Market“. An application was presented for TEN-E - the program of the European Commission.
27
ENTSO-E regions plan
Development of the Lithuanian transmission grid by 2020
28
700 MW
500-1000 MW
N. Vilnia
Existing 330 kV TS
Existing power plants Existing 750 kV OHL Existing 330 kV OHL
Prospective 330 kV TS
Prospective 330 kV OHL
Bitėnai
Conclusions• LITGRID – the Lithuanian TSO as a member of ENTSO-E plays an active
role in the establishment of the single market of the Baltic States ensuring a high level of reliability and quality of management of the power system and its integration into the Western European power systems.
• The infrastructure projects listed by BEMIP show remarkable consistency with the projects within TYNDP which sets six mains investment needs clusters including the Baltic States integration.
• The strategic projects that LITGRID takes active part in involve:– 3041 km of line upgrades and 14805 km of new lines– Completion of 7 317 km of lines out of the total of 17 846 km in the next 5 years– Investments worth 11-13€ billion over the next 5 years
• Successfully implementing the cross-border interconnection projects LITGRID aims at the European Energy Policy targets:
– Security of Supply
– Integration of RES
– Market Integration29
Thank you!
www.litgrid.eu